- neuc:ms ownuxon h
ountPOWER April 22,1992 U. S. Nuclear Regulatory Commission A'lTN: Document Control Desk Washington, DC 20555
Subject:
Catawba Nuclear Station, Unit 2 Docket No. 50414 Special Report Vibration and loose Parts hionitoring System Pursuant to Technical Specification 3.3.3.9, find attached a Special Report concerning the inoperability of the Unit 2 Vibration and loose Parts hionitoring System Channel 7 (Steam Generator C). Because of an administrative oversight, this report is being submitted after its due date. This Special Report should have been submitted by April 12, 1992.
Very truly yours,
, b.
(.LC ya hi. S. Tuckman 3
CRIJSR42292.SGC Attachment xc: S. D. Ebneter Regional Administrator, Region Il R. E. htartin, ONRR W. T. Orders Senior Resident Inspector
~
9 I
92O5010008 920422
'/J
[l 'V PDR ADOCK 05000414 l
S PLR
/
{
,t,
SPECIAL REPORT CATAWBA NUCLEAR STATION, UNIT 2 Vibration and Loose Parts Monitoring System Channel 7 On March 3,1992, Channel 7 (Steam Generator C) of the Vibration and Loose Parts Monitoring System was declared inoperable because a signal was not present on the channel. A work request was written to repair the channel during a future outage of sufficient length. This is being scheduled for an outage because a containment entry is necessary to make the repair.
Since the channel has been inoperable for more than 30 days, it is reportable to the NRC pursuant to Technical Specification 3.3.3.9.
{