TABLE 2.2-1 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS 3
FUNCTIONAL UNIT TRIP SETPOINT All0WABLE VALUES tv N
1.
Manual Reactor Trip Not Applicable Not Applicable E
2.
Power Level-High m
1 l
E Four Reactor Coolant Pumps s 9.6% above THERMAL POWER, s 9.7% Above THERMAL POWER, l
q Operating with a minimum setpoint of with a minimum of s 14.7%
514.6% of RATED THERMAL of RATED THERMAL POWER, and m
I POWER.
a maximum of s 106.7% of RATED THERMAL POWER.
3.
Reactor Coolant Flow -
9 *9
^
Low (1) 191.7% of reactor coolant 1
.1% freactorcoolan~[kw
,{
flow with 4 pumps operating *.
wt pumps operating.
4.
Reactor Coolant Pump 1 830 rpm 1 823 rpm Speed - Low 2
5.
Pressurizer Pressure - High 5 2400 psia 5 2408 psia 6.
Containment Pressure - High 5 4.75 psig s 5.24 psig N
7.
Steam Generator Pressure -
1 680 psia 1 672 psia a
low (2) (5)
~sN 8.
Steam Generator Water 136.0% Water level - each 1 35.2% Water level - each level - Low (5) steam generator steam generator y
S.
9.
Local Power Density -
Trip setpoint adjusted to not Trip setpoint adjusted to y
P High (3) exceed the limit lines of not exceed the limit lines Figures 2.2-1 and 2.2-2 (4).
of Figures 2.2-1 and R_
.P 2.2-2 (4).
g
- Design Reactor Coolant flow with 4 pumps operating is the lesser of either:
a.
The reactor coolant flow rate measured per specification 4.2.6.1, or y
yy b.
The minimum value specified in the CORE OPERATING LIMITS REPORT.
9512260292 951218
~
PDR ADOCK 05000336 P
PDR s
v s
d Docket No. 50-336 B15461 Millstone Nuclear Power Station, Unit No. 2 Proposed Technical Specifications Revision Reactor Trip Setpoints Retyped Technical Specifications December 1995
l t
l TABLE 2.2-1 E,%
REACTOR PROTECTIVE INSTRUMENTATION TRIP SETP0 INT LIMITS M
k FUNCTIONAL UNIT TRIP SETPOINT ALLOWA8LE VALUES
~
l 1.
Manual Reactor Trip Not Applicable Not Applicable Eq 2.
Power Level-High Four Reactor Coolant Pumps s 9.6% above THERMAL POWER, s 9.7% Above THERMAL POWER, re Operating with a minimum setpoint of with a minimum of s 14.7%
5 14.6% of RATED THERMAL of RATED THERMAL POWER, and a l
POWER.
maximum of 5 106.7% of i
l RATED THERMAL POWER.
l 3.
Reactor Coolant Flow -
2 91.7% of reactor coolant 2 90.9% of reactor coolant flow Low (1) flow with 4 pumps operating *.
with 4 pumps operating.
4.
Reactor Coolant Pump 2 830 rpm 1 823 rpm Speed - Low l
[
5.
Pressurizer Pressure - High 1 2400 psia s 2408 psia 6.
Containment Pressure - High 5 4.75 psig s 5.24 psig we 7.
Steam Generator Pressure -
1 680 psia
-> 672 psia l
$5 Low (2)
(5) tk 8.
Steam Generator Water 2 36.0% Water Level - each 2 35.2% Water Level - each yg Level - Low (5) steam generator steam generator sy 9.
Local Power Density -
Trip setpoint adjusted to not Trip setpoint adjusted to
?-
High (3) exceed the limit lines of not exceed the limit lines l
Figures 2.2-1 and 2.2-2 (4).
of Figures 2.2-1 and 2.2-2 (4).
i M.
- Design Reactor Coolant flow with 4 pumps operating is the lesser of either:
- a. The reactor coolant flow rate measured per Specification 4.2.6.1, or y?
- b. The minimum value specified in the CORE C?EkATIS LIMITS REPORT.
E.
-