TABLE 2.2-1 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS 3

FUNCTIONAL UNIT TRIP SETPOINT All0WABLE VALUES tv N

1.

Manual Reactor Trip Not Applicable Not Applicable E

2.

Power Level-High m

1 l

E Four Reactor Coolant Pumps s 9.6% above THERMAL POWER, s 9.7% Above THERMAL POWER, l

q Operating with a minimum setpoint of with a minimum of s 14.7%

514.6% of RATED THERMAL of RATED THERMAL POWER, and m

I POWER.

a maximum of s 106.7% of RATED THERMAL POWER.

3.

Reactor Coolant Flow -

9 *9

^

Low (1) 191.7% of reactor coolant 1

.1% freactorcoolan~[kw

,{

flow with 4 pumps operating *.

wt pumps operating.

4.

Reactor Coolant Pump 1 830 rpm 1 823 rpm Speed - Low 2

5.

Pressurizer Pressure - High 5 2400 psia 5 2408 psia 6.

Containment Pressure - High 5 4.75 psig s 5.24 psig N

7.

Steam Generator Pressure -

1 680 psia 1 672 psia a

low (2) (5)

~sN 8.

Steam Generator Water 136.0% Water level - each 1 35.2% Water level - each level - Low (5) steam generator steam generator y

S.

9.

Local Power Density -

Trip setpoint adjusted to not Trip setpoint adjusted to y

P High (3) exceed the limit lines of not exceed the limit lines Figures 2.2-1 and 2.2-2 (4).

of Figures 2.2-1 and R_

.P 2.2-2 (4).

g

  • Design Reactor Coolant flow with 4 pumps operating is the lesser of either:

a.

The reactor coolant flow rate measured per specification 4.2.6.1, or y

yy b.

The minimum value specified in the CORE OPERATING LIMITS REPORT.

9512260292 951218

~

PDR ADOCK 05000336 P

PDR s

v s

d Docket No. 50-336 B15461 Millstone Nuclear Power Station, Unit No. 2 Proposed Technical Specifications Revision Reactor Trip Setpoints Retyped Technical Specifications December 1995

l t

l TABLE 2.2-1 E,%

REACTOR PROTECTIVE INSTRUMENTATION TRIP SETP0 INT LIMITS M

k FUNCTIONAL UNIT TRIP SETPOINT ALLOWA8LE VALUES

~

l 1.

Manual Reactor Trip Not Applicable Not Applicable Eq 2.

Power Level-High Four Reactor Coolant Pumps s 9.6% above THERMAL POWER, s 9.7% Above THERMAL POWER, re Operating with a minimum setpoint of with a minimum of s 14.7%

5 14.6% of RATED THERMAL of RATED THERMAL POWER, and a l

POWER.

maximum of 5 106.7% of i

l RATED THERMAL POWER.

l 3.

Reactor Coolant Flow -

2 91.7% of reactor coolant 2 90.9% of reactor coolant flow Low (1) flow with 4 pumps operating *.

with 4 pumps operating.

4.

Reactor Coolant Pump 2 830 rpm 1 823 rpm Speed - Low l

[

5.

Pressurizer Pressure - High 1 2400 psia s 2408 psia 6.

Containment Pressure - High 5 4.75 psig s 5.24 psig we 7.

Steam Generator Pressure -

1 680 psia

-> 672 psia l

$5 Low (2)

(5) tk 8.

Steam Generator Water 2 36.0% Water Level - each 2 35.2% Water Level - each yg Level - Low (5) steam generator steam generator sy 9.

Local Power Density -

Trip setpoint adjusted to not Trip setpoint adjusted to

?-

High (3) exceed the limit lines of not exceed the limit lines l

Figures 2.2-1 and 2.2-2 (4).

of Figures 2.2-1 and 2.2-2 (4).

i M.

  • Design Reactor Coolant flow with 4 pumps operating is the lesser of either:
a. The reactor coolant flow rate measured per Specification 4.2.6.1, or y?
b. The minimum value specified in the CORE C?EkATIS LIMITS REPORT.