Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-03297, Withdraws 950224 Application for Amend to TS Surveillance Requirement 4.6.1.7.4 & Associated Bases to Delete Requirement to Verify Quarterly That Measured Leakage Rate Is Less than 0.05 Times Max Allowable Leakage Rate + (ML20094R355)
- ML20094R359 + (ML20094R359)
- ML20094R362 + (ML20094R362)
- ML20094R367 + (ML20094R367)
- ML20094R369 + (ML20094R369)
- ML20094R372 + (ML20094R372)
- ML20094R395 + (ML20094R395)
- ML20094R400 + (ML20094R400)
- ML20094R405 + (ML20094R405)
- ML20094R432 + (ML20094R432)
- ML20094R444 + (ML20094R444)
- ULNRC-03298, Provides Commitment to Convert to Improved Std Tech Specs, Using Process Discussed at 951114 Meeting + (ML20094R459)
- 3F1195-26, Advises TS Change Request 199 Re Rated Thermal Power Level Increase to 2568 Mwt Should Read as Listed + (ML20094R466)
- LIC-95-0223, Forwards Response to Request for Addl Info to Assist Closure of NRC Staff Review of Individual Plant Exam Submittal + (ML20094R491)
- LIC-95-0220, Forwards Fort Calhoun Station Performance Indicators Rept for Oct 1995 + (ML20094R495)
- ML20094R498 + (ML20094R498)
- ML20094R506 + (ML20094R506)
- ML20094R508 + (ML20094R508)
- ML20094R513 + (ML20094R513)
- 05000336/LER-1995-041, :on 951030,SI & Containment Spray Sys Valves Operational Readiness Test Identified Potential for Placing EDG in Overloaded Condition.Caused by Deficient Procedure. Implemented Procedure Change to Sp 21136 + (ML20094R522)
- 05000271/LER-1995-017, :on 950922,TS 4.6.E Was Not Met Due to Components Not Included in IST Program Scope.Performed Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10 + (ML20094R529)
- HL-5079, Forwards Rev 2 to Ei Hatch Nuclear Plant Unit 1,Cycle 16 COLR & Rev 0 to Ei Hatch Nuclear Plant Unit 2,Cycle 13 Colr + (ML20094R530)
- ML20094R532 + (ML20094R532)
- ML20094R535 + (ML20094R535)
- ML20094R553 + (ML20094R553)
- ML20094R563 + (ML20094R563)
- ML20094R567 + (ML20094R567)
- PY-CEI-NRR-2005, Advises That Investigation Has Been Conducted Into Denial of Site Access Concerns at Facility + (ML20094R569)
- ML20094R572 + (ML20094R572)
- ML20094R573 + (ML20094R573)
- B15462, Provides Revised Repair Plan Re Check Valve 3RCS*V146 + (ML20094R586)
- ML20094R592 + (ML20094R592)
- ML20094R593 + (ML20094R593)
- ML20094R596 + (ML20094R596)
- BVY-95-126, Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05 + (ML20094R599)
- 05000334/LER-1984-008, :on 840706,reactor Shutdown Bank Rods Tripped on Pressurizer Low Pressure Trip Signal.Caused by Surveillance Test Performed W/Reactor Trip Breakers Closed. Personnel Counseled.Procedure to Be Revised + (ML20094R613)
- 05000334/LER-1984-007, :on 840704,containment Recirculation Cooling Coils Chilled Water Sys Outlet Isolation Valve Failed Shut, Causing Containment Temp to Reach 105.08 F.Caused by Failed Pneumatic Valve Diaphragm + (ML20094R623)
- ML20094R634 + (ML20094R634)
- ML20094R639 + (ML20094R639)
- BSEP-95-0536, Informs NRC of Util Intent to Convert Current TS of Plant to Format Contained in NUREG-1433, Sts,Ge Plants,BWR/4, Rev 1 + (ML20094R649)
- ML20094R672 + (ML20094R672)
- JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles + (ML20094R694)
- ML20094R698 + (ML20094R698)
- ML20094R700 + (ML20094R700)
- ML20094R710 + (ML20094R710)
- 05000458/LER-1992-005, :on 920305,reactor Trip Occurred on Turbine Control Valve Fast Closure.Caused by High Winds During Thunderstorm,Resulting in phase-to-ground Fault.Damaged Transformer Reworked + (ML20094R712)
- 05000271/LER-1995-018, :on 950929,discovered Inadequate IST Surveillance & RG 1.97 Submittal Info on Recirculation Loop Sample Line Isolation Valves Due to Misinterpretation of Existing Design Configuration.Tagged Switches + (ML20094R713)
- 05000339/LER-1995-003-03, :on 951106,containment Personnel Air Lock Outer Door Was Open & Uncapped.Caused by Failure of Individuals to Adhere to Set of Performance Stds for Implementing Work at Power Station.Disqualified Personnel Involved + (ML20094R717)
- 05000366/LER-1995-006-02, :on 951030,personnel Error Resulted in Automatic Start of EDG 1B.Labeled PT Compartment Doors & Training Test Engineers on Event + (ML20094R725)
- 3F1195-25, Submits Discussion in Response to Concerns Re Proposed TS Change Request to Extend Most Refueling Interval Surveillances to 24 Months.Revised Copies of Instrument Drift Studies Included in Original Submittal Attached Also + (ML20094R726)
- 05000366/LER-1995-008, :on 951102,RV Inventory Loss Resulted in Unplanned ESF Sys Actuations.Revised Procedures & Drawings, Corrected Label,Reset LS-14,checked Limit Switches & Tested Valve Interlock Logic + (ML20094R736)