Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094L831 + (ML20094L831)
- HL-5056, Forwards Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (ML20094L835)
- ML20094L836 + (ML20094L836)
- PY-CEI-NRR-2002, Responds to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity + (ML20094L837)
- ML20094L838 + (ML20094L838)
- ML20094L849 + (ML20094L849)
- NRC-95-0127, Provides 30-day Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (ML20094L851)
- B15417, Application for Amend to License DPR-65,providing Addl Info Re TS Sections 3.4.8 & 3.9.9,Tables 2.2-1,3.3-3,3.3-5 & 3.3-8 & Bases 3/4.2.1,3/4.4.8 & 3/4.11.2.1 Which Corrects Typos,Provides Clarification or Makes Editorial Changes + (ML20094L858)
- ML20094L868 + (ML20094L868)
- ML20094L870 + (ML20094L870)
- ML20094L874 + (ML20094L874)
- ML20094L879 + (ML20094L879)
- ML20094L880 + (ML20094L880)
- ML20094L884 + (ML20094L884)
- 05000457/LER-1992-001-10, :on 920225,reactor Trip Occurred Due to Turbine Control Circuit Failure.Defective Circuit Board Replaced.W/ + (ML20094L886)
- ML20094L892 + (ML20094L892)
- BECO-LTR-95-118, Forwards Response to NRC Bulletin 95-002 Re Unexpected Clogging of Pump Strainers When Pumps Drawing Water from Suppression Pool + (ML20094L895)
- BSEP-95-0590, Monthly Operating Repts for Oct 1995 for Brunswick Steam Electric Plant Units 1 & 2 + (ML20094L903)
- ML20094L904 + (ML20094L904)
- B15445, Application for Amend to License DPR-65,extending AOT When Offsite Circuit Inoperable from 72 H to 7 Days + (ML20094L906)
- ML20094L921 + (ML20094L921)
- 05000333/LER-1992-012, :on 920224,determined That Normal Closed Position of Rhr/Lpci Pump Min Flow Valves Could Result in Failure of Pump.Caused by Improper Positioning of RHR Valves.Valve Position Changed to Open + (ML20094L922)
- ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 + (ML20094L923)
- ML20094L925 + (ML20094L925)
- ML20094L926 + (ML20094L926)
- ML20094L928 + (ML20094L928)
- 05000455/LER-1992-001-11, :on 920228,2D SG Level During Shutdown Led to P-14 Signal & Feedwater Steam Isolation.Caused by Difficulty in Controlling SG Level at Low Power.Instability Correction to Be Made by Relocating Lower Taps + (ML20094L930)
- ML20094L937 + (ML20094L937)
- ML20094L939 + (ML20094L939)
- 05000456/LER-1992-003-04, :on 920309,boron Concentration in 1A Safety Accumulator Exceeded TS Limit.Inoperability Declared.Caused by Personnel Error.Requirements Added to Notify Supervisor & to Obtain Sample If TS Limits Exceeded + (ML20094L941)
- ML20094L953 + (ML20094L953)
- ML20094L954 + (ML20094L954)
- ML20094L956 + (ML20094L956)
- ML20094L972 + (ML20094L972)
- ML20094L992 + (ML20094L992)
- NRC-95-0093, Monthly Operating Rept for Oct 1995 for Fermi 2 + (ML20094L994)
- ML20094L996 + (ML20094L996)
- ML20094M001 + (ML20094M001)
- 05000352/LER-1990-019-02, :on 900915,diesel Generator Surveillance Test Failure Reported.Diagnostic Testing Inconclusive on Cause & No Subsequent Failure Noted.No Addl Corrective Actions Planned + (ML20094M002)
- NG-95-3235, Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr + (ML20094M003)
- ML20094M014 + (ML20094M014)
- ML20094M016 + (ML20094M016)
- 05000499/LER-1995-007-01, :on 951017,TS Were Not Met Due to Failure to Identify All TS LCO Requirements for Components Affected by Electrical Bus Outage.Discussed Lessons Learned W/Individuals Involved + (ML20094M030)
- ML20094M032 + (ML20094M032)
- ML20094M034 + (ML20094M034)
- ML20094M039 + (ML20094M039)
- ML20094M048 + (ML20094M048)
- ML20094M049 + (ML20094M049)
- ML20094M056 + (ML20094M056)
- ML20094M057 + (ML20094M057)
- ML20094M059 + (ML20094M059)