A 2 K80
/*g 0q'o UNITED STATES
- E' (
~,'n NUCLEAR REGULATORY COMMISSION h
WASHINGTON. D, C. 20555
\\,
/
- ess s
[NTERGY OPERATIONS. INC_,.
SYSTEM ENERGY RESOURCES. INC.
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION MISSISSIPPI POWER AND LIGHT COMPANY DOCKEl NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILIJY OPERATING LICENSE Amendment No. 94 License No. NPF-29 l.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated February 27, 1991, complies with the standards and I
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9203270227 920323 DR ADOCK 0500 6
4 2.
Accordingly, the license is amended by changes to the License, as indicated in the attachment to this license amendment; and License Condition 2.C(36), Attachment 1 Item (c)(4) of Facility Operating License No. NPF-29 is hereby amended to read as follows:
(4)
Implement the requirements of R.G.1.97 for flux monitoring consistent with the resolution of the BWR Owners' Group (BWROG) appeal of the NRC Staff's January 29, 1990, Safety Evaluation Report on BWROG Licensing Topical Report NED0-31558.
The Entergy Operations, Inc.
actions and schedules for implementing these requirements shall be submitted to the NRC Staff for approval within 60 days of the resolution of the BWROG appeal by the Director of NRR.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
-fe,v-John T. Larkins, Director Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the License Date of Issuance:
March 23, 1992 l
1
_.. _. _ _. _ _ ~ _. _. _ _. _ _ _ _ _. _ _ _ _... _ _. _ _ _... _,
ATTACHMENT YO LICENSE AMENDMENT NO. 94
[ACJll1Y OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following page of the License with the att c ad page.
The revised page 1: identified by amendment number and contairia vertical line indicating the area of change.
REMOVE PAGE lhSERT PAGE 18 18 i
i I
'I f
2 5
1 D
r
/
l l-~..
01 shril complete the following requirements on the schedule noted below:
Emeroency Reipanie Facjlities (9fneric letter 8?-3). NUREG-0737 Supplement 1. SSER #5 i
E01 shall implemer.t the specific items below, in the manner described in MP&L letter (AECM-83/0232) dated April 15, 1933, as modified in MP&L letter (AECM-83/0486) dated August 22. 1983, nn later n the following specified dates:
(a)
Safety Parameter Du., System (SPDS) c (1) Submit a safety analysis and implementation July 1985 plan to the NRC (2) SPDS fully operational and operator trained
_ Prior to startup following first (b)
Detdiled Control Room Design Review (DCRDR)
(1) Submit a program plan to the NRC December 1984 (2) Submit a summary report to the NRC including July 1986 a proposed schedule for implementation (c)
Regulatory Guide 1.97 - Application to Emergency Response Fucilities (1) Submit a report to the NRC describing how the february 1985 requirements of Supplement I to NUREG-0737 have been or will be met.
(2)
Implement (installation or upgrade)
Prior to startup_
requirements.of R.G. 1.97 with exception following first of flux monitoring and coolant level monitoring.
refueling outage.
(3)
Implement (installation or upgrade)
Prior to startup requirements of R.G. 1.97 for coolant level following second monitoring.
refueling outage.
(4)
Implement the requirements of R.G. 1.97 for flux monitoring consistent with the resolution of the BWR Owners' Group (BWROG) appeal of the NRC Staff's January 29.-1990, Safety Evaluation' Report on BWROG Licensing Topical Report NEDO-31H 8.
The Entergy Operations, Inc.
acticros and schedules for implementing these requirements-shall be submitted to the NRC Staff-for approval within 60 days of the resolution of the BWROG appeal by the Director of NRR.
(d)
Upgrade Emergency _ Operating Procedures (EOP's)
(1) Submit a Procedures Generation Package to the NRC. April 1985 18 Amendment No. 77, 94 m--+-+--mm-----;y-----mo'g-tg v--g -y e
-gga,9g nca-i y
+
+-i+T y ' _cigr
- L y
4
-..eap.YhFMt==y er e
'TP%=M eq e
ow
==M=-m.r ep 9g-yry y,,ymqhi.g.
um.e
-gFw
'*9iity-#-
eg er - N-t*
amsv t wa
.