Text
.
123 Main Street White P!arns. New York 10001 914-C814840 914 2C-3309 tFAX)
A NewYorkPbwer
,,m.m a. c.sm. o,.
4# Authority
- *~ o-November 15,1995 JPN-95-049 U.S. Nuclear Regulattry Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Summary Report nur Resolution of UnIggolved SafelyJitue (USI) A-46
References:
1.
NRC letter, " Supplement No.1 to Generic Letter (GL) 87-02 that i
Transmits Supplemental Safety Evaluation Report No. 2 (SSER No. 2) on SOUG Generic Implementation Procedure, Revision 2, As corrected on February 14,1992, (GlP 2)," dated May 22,1992.
2.
NYPA letter, W.J. Cahill, Jr. to the NRC, (JPN-95-028), "Updateu Status Report on Seismic Verification Unresolved Safety issue (USI) A-46,"
dated May 31,1995.
Dear Sir:
This letter forwards the Summary Report documenting the results of Unresolved Safety issue (USI) A-46 for the James A. FitzPatrick Nuclear Power Plant. This letter also confirms that no significant or programmatic deviations from the GIP guidance were made during the USI A-46 resolution process and that no operability concems exist for any of the identified outliers.
In Reference 1, the NRC required Licensees to include a report summarizing the results of the USl A-46 program. The Authority Committed (Reference 2) to submit this report no later than November 17,1995.
The enclosed Summary Report includes a Project Summary (Attachment 1), Volume I of the Safe Shutdown Equipment and Relay Evaluation Report (Enclosure 1), and Volume I of the Seismic Evaluation Report (Enclosure 2).
The Authority will resolve outstanding outliers, identified in Attachments 2 and 3, no later than startup from the Refuel 13/ Cycle 14 refueling outage. One month from that oate, the Authority will inform the NRC that all planned actions for resolution of USl A-46 have been completed.
These actions are required as part of the USl A-46 resolution process.
N.Ef;g '
46 (W h
- BA22A8aaa
- aaasss c
s P
i As described in Enclosures 1 and 2, outliers will be dispositioned by either modEication, replacement, testing, or analyses. During these analyses, additional modifications beyond those presently anticipated may be identified. Should this occur, the above noted schedule may change. The Authority will inform the NRC if schedule changes become necessary. lists the commitments made by the Authority in this letter. If you have any questions, please contact Mr. A. Zaremba.
Very Truly Yours,
/.
William J. Cahill, Jr.
Chief Nuclear Officer Attachments:
1.
Stevenson & Associates, "New York Power Authority, James A. FitzPatrick Nuclear Power Plant, USI A-46 Project Summary," September 1995.
2.
Ust of commitments made by the Authority in this letter.
Enclosures:
1.
Engineering Planning and Management, Inc., "New York Power Authority, James A.
FitzPatrick Nuclear Power Plant, Safe Shutdown Equipment and Relay Evaluation for Unresolved Safety issue (USI) A-46," September 1995, Volume 1.
2.
Stevenson & Associates, "New York Power Authority, James A. FitzPatrick Nuclear l
Power Plant, USl A-46 Seismic Evaluation Report Volume 1," September 1995.
cc: w/ enc.
Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U.S. Nuclear Regulatory Commission l
P.O. Box 136 Lycoming, NY 13093 cc: w/o enc.
Mr. C.E. Carpenter Project Directorate 1-1 Division of Reactor Projects 1/11 U.S. Nuclear Regulatory Commission Washington, DC 20555
i ATTACHMENT 1 TO JPN-95-049 l
USl A-46 Project Summarv i
)
i
)
i New Y)rk Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59