Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094G441 + (ML20094G441)
- B11268, Clarifies SER of Amend 95 to License DPR-65 Re Spacing Discrepancy in Reed Switches in CEA Position Indication Sys + (ML20094G446)
- ML20094G449 + (ML20094G449)
- ML20094G458 + (ML20094G458)
- ML20094G459 + (ML20094G459)
- ML20094G466 + (ML20094G466)
- 05000313/LER-1980-014-03, /03X-1:on 800415,fire & Smoke Detector Testing Not Completed within Surveillance Interval Due to High Radiation Level.Detectors Tested at Cold Shutdown.Tech Spec 4.19 Revised + (ML20094G472)
- ML20094G475 + (ML20094G475)
- ML20094G482 + (ML20094G482)
- 05000237/LER-1984-012-04, :on 840709,reactor Scrammed.Caused by Instrument Mechanic Mistakenly Turning Reactor Protective Sys Channel B Instead of Channel a Hydrogen Addition Switch to Off + (ML20094G489)
- ML20094G491 + (ML20094G491)
- ML20094G501 + (ML20094G501)
- BSEP-84-1730, Special Rept 2-SR-84-10:on 840629,fire Barrier Limiting Condition for Operation Initiated for Fire Door 303.Door Would Not Properly Open Due to Problems W/Hinges & Interlock Device.Door Repaired + (ML20094G508)
- ML20094G514 + (ML20094G514)
- ML20094G516 + (ML20094G516)
- ML20094G517 + (ML20094G517)
- ML20094G518 + (ML20094G518)
- ML20094G519 + (ML20094G519)
- ML20094G524 + (ML20094G524)
- ML20094G530 + (ML20094G530)
- ML20094G538 + (ML20094G538)
- ML20094G540 + (ML20094G540)
- ML20094G543 + (ML20094G543)
- ML20094G553 + (ML20094G553)
- ML20094G556 + (ML20094G556)
- ML20094G563 + (ML20094G563)
- ML20094G569 + (ML20094G569)
- ML20094G572 + (ML20094G572)
- ML20094G573 + (ML20094G573)
- AECM-84-0387, Updated Special Rept 84-022/1:on 840429,auxiliary Main Steam Tunnel Temps Exceeded 125 F Limit of Tech Spec 3.7.8. Task Cards Will Be Issued to Track New Qualified Life of Each Affected Component + (ML20094G583)
- 2CAN088401, Summarizes 840712 Meeting W/Nrc,Technology for Energy Corp & Scan Power in Bethesda,Md Re Inadequate Core Cooling Instrument Installation.Supporting Documentation Encl + (ML20094G584)
- ML20094G585 + (ML20094G585)
- AECM-84-0379, Special Rept 84-028/0:on 840627,Div 1 Diesel Generator Tripped of 50% Load.Caused by Grounding of Phase B Linear Reactor of Voltage Transformer.Div 1 Diesel Generator A,B & C Phase Reactors Replaced + (ML20094G593)
- ML20094G595 + (ML20094G595)
- ML20094G597 + (ML20094G597)
- ML20094G601 + (ML20094G601)
- ML20094G628 + (ML20094G628)
- ML20094G634 + (ML20094G634)
- ML20094G639 + (ML20094G639)
- ML20094G641 + (ML20094G641)
- ML20094G647 + (ML20094G647)
- ML20094G653 + (ML20094G653)
- ML20094G656 + (ML20094G656)
- ML20094G658 + (ML20094G658)
- ML20094G660 + (ML20094G660)
- ML20094G662 + (ML20094G662)
- ML20094G672 + (ML20094G672)
- BECO-92-017, Responds to 920115 Supplemental Safety Evaluation Requesting Schedule for Implementation of Recommendations in Original Safety Evaluation Re Station Blackout Rule.Subjs Include cross-tie Circuit Testing + (ML20094G673)
- ML20094G675 + (ML20094G675)
- ML20094G677 + (ML20094G677)
- ML20094G680 + (ML20094G680)