Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NLS8400019, Submits Followup Response to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class 1E Safety Sys. short- & long-term Corrective Actions Adequately Addressed. Satisfactory Relay Performance Will Be Provided + (ML20093K814)
- TXX-4057, Forwards Table Providing Description of 831010 Amend 44 to FSAR + (ML20093K821)
- ML20093K827 + (ML20093K827)
- TXX-4072, Forwards Table Providing Description of Amend 45 to FSAR + (ML20093K828)
- ML20093K830 + (ML20093K830)
- ML20093K834 + (ML20093K834)
- 05000328/LER-1984-009-02, :on 840630,during Maint on Main Feedwater Pump B,turbine-driven Auxiliary Feedwater Pump Did Not Start When Signaled Due to Flow Control Valve FCV-1-15 Failing to Close.Caused by Grease on Torque Switch + (ML20093K837)
- ML20093K848 + (ML20093K848)
- ML20093K849 + (ML20093K849)
- ML20093K852 + (ML20093K852)
- ML20093K853 + (ML20093K853)
- ML20093K858 + (ML20093K858)
- ML20093K862 + (ML20093K862)
- ML20093K867 + (ML20093K867)
- AECM-84-0410, Discusses Util Conclusion Re Conformance of Tdi Diesel Generators to Reliability Requirements of GDC 17.Diesel Generators Inspected at Least Once W/Satisfactory Results + (ML20093K878)
- ML20093K883 + (ML20093K883)
- ML20093K889 + (ML20093K889)
- L-84-169, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/84-15 & 50-251/84-15.Corrective Actions:Maint Procedure 0707.32, Safety-Related Snubber Surveillance, Revised,Specifying as-found Visual Insp Required + (ML20093K893)
- ML20093K897 + (ML20093K897)
- ML20093K900 + (ML20093K900)
- TXX-4337, Responds to Question Re Containment Sump Performance.Core Blockage Will Not Occur When Paint Debris Transported in RHR Flow During Cold Leg Recirculation + (ML20093K907)
- LIC-95-0179, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR for Period Jan 1994 - Apr 1995 + (ML20093K909)
- ML20093K910 + (ML20093K910)
- ML20093K912 + (ML20093K912)
- NG-95-3089, Provides 60-day Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves + (ML20093K922)
- ML20093K926 + (ML20093K926)
- ML20093K930 + (ML20093K930)
- ML20093K933 + (ML20093K933)
- ML20093K934 + (ML20093K934)
- ML20093K936 + (ML20093K936)
- W3P84-1928, Requests Exemption from Requirement for Emergency Lighting During Jumpering Procedures for Electrical Isolation of Automatic Diesel Generator Functions from Control Room. Advises of Completion of Safe Shutdown Procedure Open Items + (ML20093K939)
- ML20093K942 + (ML20093K942)
- ML20093K943 + (ML20093K943)
- AECM-84-0399, Forwards Justification for Required Exemption from Certain Regulations Implied by Proposed OL Conditions,Per 10CFR50.12(a) Concerning Div I-III Diesel Generators. Conditions May Be Incorporated Into OL Amend + (ML20093K950)
- ML20093K953 + (ML20093K953)
- NRC-95-0108, Submits Fermi 2 Personnel Training & Qualification Plan, Rev 13 Per 10CFR50.54(p)(2).Plan Withheld + (ML20093K958)
- ML20093K961 + (ML20093K961)
- ML20093K962 + (ML20093K962)
- ML20093K965 + (ML20093K965)
- ML20093K967 + (ML20093K967)
- ML20093K968 + (ML20093K968)
- ML20093K969 + (ML20093K969)
- ML20093K970 + (ML20093K970)
- ULNRC-03277, Forwards Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20093K975)
- ML20093K978 + (ML20093K978)
- ML20093K980 + (ML20093K980)
- ML20093K981 + (ML20093K981)
- ML20093K988 + (ML20093K988)
- ML20093K990 + (ML20093K990)
- ML20093K991 + (ML20093K991)
- ML20093K993 + (ML20093K993)