Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-84-0122, Informs That Operating Staffs Apprised of Revised Justification for Interim Operation Re Seismic Qualification of Operator Interface Modules ESE-12A + (ML20093K207)
- RBG-18220, Interim Deficiency Rept DR-207 Re Trip Auxiliary Units for Neutron &/Or Process Radiation Supplied by Ge.Next Rept Expected by 841009 + (ML20093K210)
- ML20093K213 + (ML20093K213)
- ML20093K215 + (ML20093K215)
- ML20093K217 + (ML20093K217)
- ML20093K218 + (ML20093K218)
- ML20093K221 + (ML20093K221)
- ML20093K222 + (ML20093K222)
- 05000395/LER-1984-039, :on 840907,board M Horizontal Fire Barrier Located Above Svc Water Booster Pump a Declared Inoperable Upon Discovery of Hole.Cause Not Stated.Barrier Replaced + (ML20093K225)
- ML20093K228 + (ML20093K228)
- TXX-4235, Interim Deficiency Rept Re Installation of Curtain Fire Dampers W/O Proper Provisions for Thermal Expansion. Initially Reported on 840309.Evaluation in Progress.Next Rept Expected by 840813 + (ML20093K230)
- ML20093K234 + (ML20093K234)
- 05000348/LER-1984-020, :on 840907,control Room Fire Barrier Penetrations 01-155-02 & 06-155-03 Found Not to Be Sealed Per Tech Specs.Cause Not Stated.Penetrations Sealed & Declared Operable on 840912 + (ML20093K237)
- ML20093K238 + (ML20093K238)
- ML20093K242 + (ML20093K242)
- ML20093K247 + (ML20093K247)
- NRC-95-0106, Provides Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20093K248)
- ML20093K249 + (ML20093K249)
- 05000271/LER-1984-020, :on 840908,failure of RCIC Inboard Steam Supply Valve Annunciation Relay Occurred.Caused by Shorting of Relay Resulting in Blown Central Power Fuse.Relay Replaced & Valve Returned to Operability + (ML20093K252)
- ML20093K266 + (ML20093K266)
- JAFP-84-0946, Monthly Operating Rept for Sept 1984 + (ML20093K270)
- 05000388/LER-1984-018-01, :on 840908,turbine Control Valve Fast Closure Signal Generated from False Power Load Unbalance Signal. Caused by Zero Shift Pressure Transmitter PT-20107. Transmitter Recalibr + (ML20093K274)
- ML20093K276 + (ML20093K276)
- ML20093K283 + (ML20093K283)
- ML20093K286 + (ML20093K286)
- ML20093K288 + (ML20093K288)
- ML20093K291 + (ML20093K291)
- ML20093K293 + (ML20093K293)
- ML20093K296 + (ML20093K296)
- ML20093K302 + (ML20093K302)
- ML20093K308 + (ML20093K308)
- 05000251/LER-1984-013-01, :on 840624,automatic Initiation of Auxiliary Feedwater Occurred.Caused by Steam Generator Feedwater Pump 4B Trip Due to Inadequate Suction Pressure.Unit Stabilized & Auxiliary Feedwater Secured & Reset + (ML20093K309)
- BSEP-95-0537, Provides Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20093K310)
- ML20093K311 + (ML20093K311)
- ML20093K314 + (ML20093K314)
- ML20093K319 + (ML20093K319)
- HL-5041, Submits Clarification for NRC Review of USI A-46 Summary Rept + (ML20093K324)
- ML20093K328 + (ML20093K328)
- ML20093K330 + (ML20093K330)
- ML20093K334 + (ML20093K334)
- ML20093K339 + (ML20093K339)
- ST-HL-AE-1105, Forwards Comments on Weaknesses Noted in SALP Repts 50-498/83-26 & 50-499/83-26 for Dec 1982 - Nov 1983,as Discussed at 840510 Public Meeting + (ML20093K343)
- ML20093K345 + (ML20093K345)
- 3F1095-01, Informs That Actions Requested in GL 95-07 to Evaluate Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves Will Be Implemented + (ML20093K346)
- ML20093K347 + (ML20093K347)
- ML20093K349 + (ML20093K349)
- ML20093K357 + (ML20093K357)
- ML20093K364 + (ML20093K364)
- 05000352/LER-1995-004, :on 950728,actuations of Units 1 & 2 PCRVICS Resulted from Blown Fuse.Issued Station Bulletin to All LGS Supervision + (ML20093K373)
- BECO-LTR-95-108, Informs That Util Intends to Implement Actions Addressed in GL 95-07 by 960223,as Requested + (ML20093K376)
- 05000368/LER-1984-023, :on 840829,while RCS Being Vented Via Upper Vessel Head Vent,Nitrogen Flow Exceeded Vent Flow Capacity, Causing RCS to Slightly Pressurize Resulting in Inaccurate Level Indication + (ML20093K379)