Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000364/LER-1992-001, :on 920122,reactor Trip Initiated.Caused by Improper Gasket Installation.All Accessible Gaskets in North Exciter Coolers Were Inspected & Replaced to Be Leak Free + (ML20092J921)
- ML20092J922 + (ML20092J922)
- ML20092J928 + (ML20092J928)
- ML20092J934 + (ML20092J934)
- ML20092J939 + (ML20092J939)
- ML20092J941 + (ML20092J941)
- ML20092J943 + (ML20092J943)
- ML20092J945 + (ML20092J945)
- ML20092J946 + (ML20092J946)
- ML20092J947 + (ML20092J947)
- ML20092J949 + (ML20092J949)
- ML20092J962 + (ML20092J962)
- ML20092J966 + (ML20092J966)
- ML20092J977 + (ML20092J977)
- ML20092J981 + (ML20092J981)
- ML20092J988 + (ML20092J988)
- ML20092J989 + (ML20092J989)
- ML20092J999 + (ML20092J999)
- ML20092K000 + (ML20092K000)
- ML20092K006 + (ML20092K006)
- ML20092K020 + (ML20092K020)
- 05000259/LER-1984-024-01, :on 840602,increase in Conductance of Stator Cooling Water Teflon Insulating Connector Tubing Caused Turbine Generator Trip.Probably Caused by Interior Deposits of Iron & Copper.Sys Flushed + (ML20092K023)
- ML20092K027 + (ML20092K027)
- L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing + (ML20092K031)
- ML20092K040 + (ML20092K040)
- NG-95-2805, Monthly Operating Rept for Aug 1995 for Daec + (ML20092K045)
- ML20092K046 + (ML20092K046)
- ML20092K048 + (ML20092K048)
- ML20092K056 + (ML20092K056)
- ML20092K058 + (ML20092K058)
- ML20092K061 + (ML20092K061)
- PLA-7853, Ninety-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7853 + (ML20092K063)
- NG-95-2236, Requests for Relief from ASME Section XI requirements:NDE- 012 Through NDE-018 + (ML20092K067)
- ML20092K072 + (ML20092K072)
- ML20092K076 + (ML20092K076)
- ML20092K085 + (ML20092K085)
- PY-CEI-NRR-1985, Provides Suppl Info Re License Amend Application to Revise License to Reflect Proposed Merger of Operating Companies + (ML20092K088)
- 05000366/LER-1984-005, :on 840525,standby Liquid Control Sys Prvs Lifted at Lower than Expected Pressure When Bench Tested. Design Change Initiated to Replace Existing Prvs W/Prvs of Different Model.One Prv Replaced Thus Far + (ML20092K091)
- ML20092K094 + (ML20092K094)
- ML20092K095 + (ML20092K095)
- ML20092K105 + (ML20092K105)
- ML20092K107 + (ML20092K107)
- RBG-18070, Final Deficiency Rept DR-121 Re Motor Control Ctr Equipment Wiring & Intermittent 49X Relay Contact Supplied by Gould, Inc.Wiring Difference Does Not Affect Safe Operation. Condition Not Reportable Per 10CFR50.55(e) + (ML20092K116)
- ML20092K119 + (ML20092K119)
- ML20092K146 + (ML20092K146)
- 2CAN029205, Monthly Operating Rept for Jan 1992 for Arkansas Nuclear One Unit 2 + (ML20092K152)
- ML20092K162 + (ML20092K162)
- ML20092K164 + (ML20092K164)
- RC-95-0232, Advises That Util Has Not Received Written Response to & Has Performed Addl Reviews of Issue of Spurious Closure of Valves XVG-8133A or B & Determeined That C/As Not Justified Considering Cost Vs Possible Safety Benefit + (ML20092K173)
- W3P84-1737, Responds to Generic Ltr 83-28,Items 4.2.3 & 4.2 4 Re Life Cycle Testing & Periodic Replacement Requirements for Reactor Trip Breakers.Util Will Provide Program & Schedule to Complete Section Requirements by 841130 + (ML20092K182)
- BECO-LTR-95-098, Provides Status on Possible Closure of South Weymouth Naval Air Station & Impact on Emergency Planning Efforts at Plant + (ML20092K186)