ML20092K119
| ML20092K119 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/25/1984 |
| From: | Mielke F PACIFIC GAS & ELECTRIC CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| REF-PT21-84-262-000 PT21-84-262, PT21-84-262-000, NUDOCS 8406280065 | |
| Download: ML20092K119 (1) | |
Text
-
PACIFIC GAS AND ELECTR,IC C O M PANY l
77 BEALE STREE? = SAN FRANCISCO, CALIFORNIA 94106 + (415) 781-4218 FREDE RICK W, MIELME..JR.
CHAIRM AN Or THE DOARD June 25, 1984 PGandE File 505.1
Reference:
Letter of May 29, 1984 Richard C. Da. Young to Utility CEOs Mr. Richard C. DeYoung Director, Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. DeYoung:
HVAC Equipment Manufactured by the Bahnson Company We are conducting a thorough search of our records to determine if we have ever used the services of the Bahnson Company of Winston-Salem, North Carolina. We are also contacting all contractors who have been involved with the HVAC system at the Diablo Canyon Power Plant to ascertain if they have utilized the services of the Bahnson Company on work performed at Diablo Canyon.
If our investigation identifies that work was performed by Bahnson Company at the Diablo Canyon Po"er Plant, we will promptly notify the NRC and take appropriate action to determine whether the procurement specification was met and if the product was suitable for its intended service.
Sincerely, J
FWM:bkm D
0 25 S-PDR
_