ML20092K105

From kanterella
Jump to navigation Jump to search
Supplemental Final Deficiency Rept Re Coatings in Reactor Bldg.Certain Premanufactured Pipe Support Components Recoated W/Dba Qualified Coating Sys.Touchup Coating Sys Test Results Indicate Favorable Performance
ML20092K105
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/20/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
KMLNRC-84-092, KMLNRC-84-92, NUDOCS 8406280052
Download: ML20092K105 (2)


Text

- _.

KANSAS GAS AND ELECTRIC COMPANY THE ELECTFhC COMPANY otran e norsten June 20, 1984 V8C E PRELDENT - NUCLE Asl Mr. E. H. Johnson, Acting Chief khhhQh Reactor Projects Branch 2

)

U.S. Nuclear Regulatory Commission 2

Region IV 611 Ryan Plaza Drive, Suite 1000 j

Arlington, Texas 76011

~

KMLNRC 84-092 Re:

Docket No. STN 50-482 Ref:

Final Report KMLNRC 84-013 dated 2/10/84 from GLKoester, KG&E, to JEGagliardo, NRC Subj: Supplemental Report on Coatings in the Reactor Building

Dear Mr. Johnson:

The Reference provided a final report on a 10CFR50.55(e) concerning the application of coatings in the Reactor Building.

In the corrective actions section of that report, Kansas Gas and Electric Company (KG&E) stated that the coatings on three structural steel members would be replaced. Subsequent evaluations have revealed that the location of the members and current status of construction in the Reactor Building do not permit the safe use of the brush blasting surface preparation required to replace these coatings. However, as stated in the Reference, the amount of unqualified coating on these members that could potentially separate during Design Basis Accident (DBA) conditions is not sufficient to exceed the allowable unqualified coating materials accounted for in the design and documented in the FSAR.

The Architect / Engineer has revised the report on the Containment Coatings Acceptance Test Program to allow the nonconforming coatings on the three structural steel members to be used as-is.

In order to regain some of the design safety margin in this area, KG&E has taken other actions that should result in a net reduction in the quantity of unqualified coatings in the Reactor Building even with the estimated 170 square feet of nonconforming coatings on the structural steel members. These actions include:

1)

Some of the pre-manufactured pipe support components which were furnished with manufacturer's standard shop applied coatings have been recoated with a DBA qualified coating system.

8406280052 840620 PDR ADOCK 05000482 16 s 0 201 N. Market - Wichita, Kansas - Mail Address: RO. Box 208 I Wichita, Kansas 67201 - Telephone: Area Code (316) 261-6451

4 9 KMLNRC 84-092 Mr. E. H. Johnson June 20, 1984 2)

Touch-up coating systems, previously considered unqualified, have been tested to provide data to substantiate their ability to withstand SNUPPS DBA conditions. Preliminary review of the test results indicate that the touch-up coating systems will perform favorably during DBA conditions.

Please contact me or Mr. Otto Maynard of my staff, if you have any questions concerning this subject.

Yours very truly,.