- 05000397/LER-1984-043, :on 840519,during Pressurization of Monitor a, Isolation Signal & Load Shedding Logic Initiated Resulting in Loss of Control Power to Reactor Feedwater Level Control Sys.Caused by Monitors B & D Not Reset + (ML20092C546)
- ML20092C548 + (ML20092C548)
- RBG-18028, Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Next Rept Will Be Provided by 840905 + (ML20092C556)
- 05000397/LER-1984-045, :on 840518,reactor High Pressure Trip Occurred as Result of Main Steam Bypass Valve Closure Due to Low Hydraulic Fluid Pressure,When Main Turbine Manually Tripped. Main Steam Bypass Valves Reopened + (ML20092C558)
- ML20092C560 + (ML20092C560)
- ML20092C562 + (ML20092C562)
- ML20092C566 + (ML20092C566)
- ML20092C571 + (ML20092C571)
- ML20092C574 + (ML20092C574)
- RBG-18-027, Interim Deficiency Rept DR-160 Re Transformer Cable Lead Lugs Supplied by Gould Brown-Boveri.Next Rept Expected by 840912 + (ML20092C580)
- ML20092C588 + (ML20092C588)
- ML20092C592 + (ML20092C592)
- ML20092C597 + (ML20092C597)
- ML20092C609 + (ML20092C609)
- ML20092C611 + (ML20092C611)
- ML20092C614 + (ML20092C614)
- ML20092C616 + (ML20092C616)
- ML20092C621 + (ML20092C621)
- ML20092C622 + (ML20092C622)
- ML20092C626 + (ML20092C626)
- ML20092C630 + (ML20092C630)
- ML20092C633 + (ML20092C633)
- U-602491, Forwards Nucon Intl,Inc Rept Nucon 06IL902/01, Pyrolysis Gas Chromatography Analysis of 9 Thermo-Lag Fire Barrier Samples Re GL 92-08 + (ML20092C636)
- ML20092C641 + (ML20092C641)
- ML20092C643 + (ML20092C643)
- ML20092C659 + (ML20092C659)
- ML20092C661 + (ML20092C661)
- ML20092C667 + (ML20092C667)
- ML20092C669 + (ML20092C669)
- ML20092C671 + (ML20092C671)
- ML20092C672 + (ML20092C672)
- ML20092C676 + (ML20092C676)
- U-602493, Provides Revised Response to Unresolved Item Noted in Insp Rept 50-461/95-08.Correct USAR Page for Proposed USAR Rev Re Util Commitment to ANSI N45.2.6-1978, Qualifications of Insp,Exam & Testing Personnel for NPPs Encl + (ML20092C679)
- ML20092C680 + (ML20092C680)
- ML20092C681 + (ML20092C681)
- ML20092C689 + (ML20092C689)
- 05000282/LER-1995-010, :on 950804,discovered Deficiencies in Flow Testing of RHR Sys.Caused by Deficient Procedure Which Failed to Consider Effect of Recirculation Line Downstream of Flow Orifice.Procedure Changes Will Be Made + (ML20092C699)
- ML20092C700 + (ML20092C700)
- ML20092C717 + (ML20092C717)
- ML20092C733 + (ML20092C733)
- ML20092C737 + (ML20092C737)
- ML20092C745 + (ML20092C745)
- ML20092C746 + (ML20092C746)
- ML20092C760 + (ML20092C760)
- ML20092C762 + (ML20092C762)
- ST-HL-AE-3959, Forwards Objectives for 1992 Graded Emergency Preparedness Exercise on 920429 for Review & comment.W/920207 Release Memo + (ML20092C764)
- ML20092C768 + (ML20092C768)
- 05000277/LER-1984-009, :on 840516,during Refueling Outage,False lo-lo Reactor Level Initiation Signal Caused HPCI & RCIC to Attempt to Start When Both Power Supplies for ECCS Channel a Logic Feeds Removed.Supply Feeds Restored + (ML20092C770)
- ML20092C771 + (ML20092C771)
- BECO-84-085, Forwards Final Rept, 1984 Remote Visual Exam of Core Spray Sparger Sys of Pilgrim Nuclear Power Station,Unit 1, Per IE Bulletin 80-13 & Util .Exam Revealed No Change in Conditions Reported During 1981 Exams + (ML20092C772)
- ML20092C777 + (ML20092C777)