Requests NRC Review & Approval of Supplement 1 to RXE-88-102-P to Provide for Use of Westinghouse Fuel Through Unit 1,Cycle 3 & to Reschedule Original Siemens Fuel Design for Cycle 4.Approval Requested by Dec 92
ML20092C733
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/05/1992
From: William Cahill, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-92060, NUDOCS 9202120065
Download: ML20092C733 (2)


Text

_ __

r Log # TXX-92060

~

file # 915

?

E 10010 TUELECTRIC february 5, 1992 Willlain J. Cahill, Jr.

Orvur % Pre,idens U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

CDMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TOPICAL REPORT RXE-88-102-P, SUPPLEMENT 1 TUE-1 DNB CORRELATION REF:

1) TV Electric letter logged TXX-901055 from W. J. Cahill, Jr.

to the NRC, dated December 28, 1990

2) TV Electric letter logged TXX-91291 from W, J. Cahill, Jr.

to the NRC, dated August 12, 1991

3) NRC letter from Thomas A. Bergman to W. J. Cahill, Jr.

dated October 4, 1991 Gentlemen:

Included in Reference 1 was Supplement 1 to RXE-88-102-P, TUE-1 DNB Correlation. This supplement extends the applicability of the TUE-1 correlation to the Siemens 0.360" 0.0,, - mixing vane fuel design.

This fuel design was originally planned for use beginning with Unit 1 Cycle 3.

Due to changes in the proposed Siemens Cycle 3 fuel design, TU Electric withdrew its request for NRC review of the supplement (see Reference 2).

Since that time, licensing constraints associated with the new Siemens fuel design have caused TV Electric to continue the use of Westinghouse fuel through Unit 1 Cycle 3 and to reschedule the original Siemens fuel design

(.360" mixing vane) for Unit 1 Cycle 4.

On November 21, 1992, per phone converation with Mr. T. A. Bergman and Dr. R. C. Jones of the NRC, TU Electric advised the staff of the need for submitting a supplement extending the applicability of the TUE-1 DNB correlation to Siemens fuel and committed to provide this supplement by March 1992. As a result of rescheduling the original Siemens fuel design, the supplement to RXE-88-102-P submitted in Reference 1 is applicable to CPSES, Cycle 4.

Therefore, in lieu of submitting a new supplement to RXE-88-102-P, TV Electric requests that the NRC review and approve the supplement to RXE-88-102-P previously submitted in Reference 1.

0 na<v*

I O\\

g82 188 8 a!888 6

- - s- --

p PDR

e TXX-90060 Page 2 of 2 Since this is simply an extension of the previously subrMtted TUE-1 DNB correlation, review of this supplement concurrent with RXE 88-102-P is appt opriate and may 'ninimize required resources.

TV Electric requests that the NRC review and approve Supplement 1 to RXE 88 102 P by December 1992 in order to support the licensing of Unit 1 Cycle 4.

Per Reference 3, the NRC issued a schedule for completing the review of TO Electric Topical Reports previously submitted.

TV Electric is basing the scheduling and management of resources according to that schedule in combination with the requested approval date for Supplement 1 to RXE-88 102-P.

If these schedules cannot be achieved, please notify TV Electric as soon as possible so that the impact on TV Electric licensing plans can be assessea.

Should you have any questions, please contact Mr. J. D. Seawright at (214) 812-4375.