ML20092C571

From kanterella
Jump to navigation Jump to search
Corrected Tech Spec Page to Amend 164 to License DPR-35, Changing Control Value for Reactor High Pressure Trip Level Setting 76 Psig
ML20092C571
Person / Time
Site: Pilgrim
Issue date: 09/11/1995
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20092C573 List:
References
NUDOCS 9509130049
Download: ML20092C571 (1)


Text

-. _.

PNPS TABLE 3.2.A 1 Ianr2,Ian INSTRUNENTATION THAT INITIATES FmT**Y Man Ai Operable Instrument Channels Per Trio System (1)

Minimus Available Instrument Trio hvel Setetna Action (2) 2(7) 2 Reactor Low Water Level 211.6" indicated level (3)

A and D 1

1 Reactor High Pressure

$76 psig D

l 2

2 Reactor Low-iow Water Level at or above - 46.4 in.

A j

indicated level (4) 2 2

Reactor High Water Level

$55.4" indicated level (5)

B 2(7) 2 High Drywell Pressure

$2.22 peig A

2 2

Low Pressure Main Steam Line 2810 pai5 (8)

B 2(6) 2 High Flow Main Steam Line

$136% of rated stema flow B

2 2

Main Steam Line Tunnel Exhaust Duct High Temperature

$170*F 4

2 2

Turbine Basement Exhaust Duct High Temperature

$150'F B

1 1

Reactor Cleanup System High Flow

$3004 of rated flow C

2 2

Reactor Cleanup System High Temperature

$50'T C

9509130049 950911

~

PDR ADOCK 05000293 P

PDR 34;-42 -86;-14/,-1W -131,-154 -162,164 3/4.2-7 Amendment No.

3 5

September 11, 1995 Mr. E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RfD #1 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

ADMINISTRATIVE ERROR IN ISSUANCE OF FACILITY OPERATING LICENSE AMENDMENT N0. 164 - PILGRIM NUCLEAR POWER STATION (PNPS)

(TAC NO. M91551)

Dear Mr. Boulette:

The reactor high pressure trip level setting was inadvertently changed in the process of issuing Amendment 164. The control value for the reactor high pressure trip level setting is 76 psig. (ref. Amendment 162, page 3/4.2-7).

The inadvertent change was an administrative error.

It was the result of overlapping amendments affecting the same page (3/4.2-7) of the PNPS Technical Specifications (TSs). Amendment 162 changed the reactor high pressure trip level setting from 110 psig to 76 psig.

It was submitted on September 6, 1994, and approved on March 27, 1995. Amendment 164 changed the reactor high water level isolation trip level setting.

It was submitted on February 9, 1995, and approved on June 15, 1995. Amendment 164 inadvertently changed the reactor high pressure trip level setting from 76 psig back to 110 psig. A copy of the corrected TS page for Amendment 164 is enclosed.

Please update the PNPS TSs accordingly.

If you have any questions, please contact me at (301) 415-3041.

Sincerely, Original signed by:

Ronald B. Eaton, Senior Project Manager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Corrected TS page a

cc w/ enc 1:

See next page DISTRIBUTIDH:

Slittle Docket File REaton PUBLIC OGC PDI-l Reading GHill (2)

SVarga CGrimes LMarsh ACRS (4)

CCowgill, RI u

.a,....,,.i.e.4

\\ PILI. i.\\.n.I91551.LTRm.m g,.,.d.nnoui.ri.ch nis.ncio.u,. :r. c.,, wein.it. chm.nti.ncio.or.

n - wo e.,y DOCUMENT NA,ME: G:

GRIM P

. i.

0FFICE PDI-1:LA L l

PDI @W PDI-1(DMA l

3 NAME Slittlei.7 REatch:dt LMarsh W 4Ph DATE 4 / 11 /95 d / ll /95 o#/t[ /95 RUMMiMCORDf0g

,