ML20092C616
| ML20092C616 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/15/1984 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20092C619 | List: |
| References | |
| GL-84-07, GL-84-7, NUDOCS 8406210270 | |
| Download: ML20092C616 (1) | |
Text
r PHILADlLPHIA ELECTRIC COMPANY 23ol M ARKET STREET P.O. BOX 8099 PHILADELPHI A. PA.191o1 SHIELDS L. D ALTROFF ule'#E"fEEou June 15, 1984
. Docket No. 50-277 Mr. John F. Stolz Operating Reactors Branch #4 Division of Licensing U.S. Nuclear Regulatcry Commission Washington, D.C.
20555
REFERENCE:
S. L. Daltroff, Philadelphia Electric Company, to J. F. S tolz, USNRC, letter, March 8, 1984
Dear Mr. Stolz:
The reference letter forwarded to the Commission h
Philadelphia Electric Company's plans for a Radiation Protection Program for recirculation and RHR piping replacement on Peach Bottom Unit 2.
Subsequent to this submittal, the NRC issued Generic Letter 04-07, " Procedural Guidance for Pipe Replacement at BWR's".
At a presentation to the Region I Office of Inspection and Enforcement on April 5, 1984, the staff requested us to furnish a detailed description of pre-planning procedures, shielding, equipment, personnel training, estimated total cumulative dose and other measures to be taken to keep exposures as low as reasonably achievable.
In accordance with Generic Letter 84-07 and subsequent discussions with the NRC staff, attached is a detailed description of our radiation protection program to be implemented during the Unit 2 pipe replacement.
If you have any questions, please do not hesitate to contact us.
8406210270 840615
~
f ADOG MO DR Very truly,ours, j
{tY l
Attachment cc:
A. R. Blough, site Inspector
.