Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087H825 + (ML20087H825)
- 05000285/LER-1976-031-03, /03T:on 760908,portion of Spent Fuel Pool Rack Passed Over Spent Fuel.Caused by Misinterpretation of Tech Specs.Supervisor Re Instructed as to Meaning of Tech Specs + (ML20087H829)
- ML20087H830 + (ML20087H830)
- ML20087H836 + (ML20087H836)
- 05000263/LER-1984-011, :on 840218 & 23,crack Indications Detected on Loop Jet Pump B Instrument Seal & on Loops a & B of RHR LPCI Lines.Caused by Intergranular Stress Corrosion Cracking.Affected Matls Replaced + (ML20087H841)
- ML20087H844 + (ML20087H844)
- ML20087H845 + (ML20087H845)
- ML20087H850 + (ML20087H850)
- ST-HL-AE-5076, Application for Amends to Licenses NPF-76 & NPF-80.Amends Would Incorporate Proposed Addition of TS 3.10.8 (Special Test Exception) + (ML20087H851)
- ML20087H852 + (ML20087H852)
- ML20087H856 + (ML20087H856)
- ML20087H858 + (ML20087H858)
- 3F0495-20, Radioactive Effluent Release Rept 1994 Crystal River Unit 3 + (ML20087H861)
- ML20087H865 + (ML20087H865)
- ML20087H873 + (ML20087H873)
- ML20087H875 + (ML20087H875)
- ML20087H876 + (ML20087H876)
- ML20087H877 + (ML20087H877)
- ML20087H883 + (ML20087H883)
- PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements + (ML20087H886)
- ML20087H890 + (ML20087H890)
- ML20087H891 + (ML20087H891)
- ML20087H893 + (ML20087H893)
- NRC-84-0045, Forwards Addl Info Re Equipment & Seismic Qualification & Pump & Valve Operability Issues Identified by NRC + (ML20087H894)
- 05000368/LER-1984-005, :on 840210,output of Channel a ex-core Detector Subchannels Appeared to Saturate at 50.7% Power.Preamp Assembly & Filter Replaced.Testing Confirmed Proper Functioning of Subchannels + (ML20087H895)
- ML20087H897 + (ML20087H897)
- ML20087H903 + (ML20087H903)
- ML20087H906 + (ML20087H906)
- 3F0895-16, Ro:On 950713,1 H non-emergency Rept Made Re Condition Suspected to Be Outside Design Basis of Plant.Based on Conclusions of Design Basis Evaluation,Rescinds 1 H non-emergency Rept (NRC Event 29062) + (ML20087H910)
- ML20087H914 + (ML20087H914)
- ML20087H916 + (ML20087H916)
- NRC-84-0046, Forwards Requested Changes to Final Draft Tech Specs.List of Tech Specs Discussed W/Description of Status & Action Required Also Encl + (ML20087H921)
- PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS + (ML20087H922)
- ML20087H928 + (ML20087H928)
- ML20087H931 + (ML20087H931)
- ML20087H932 + (ML20087H932)
- NRC-84-0044, Responds to Three NRC Questions Re Analysis of Steam Generator Tube Rupture Event,Contained in Fsar.Util Reanalyzing Condition Using Operator Times from Actual Events & ANS Draft Std 58.8.Rept Expected by 840630 + (ML20087H936)
- PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License + (ML20087H937)
- ML20087H941 + (ML20087H941)
- ML20087H946 + (ML20087H946)
- ML20087H954 + (ML20087H954)
- 3F0495-17, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-07.Corrective Actions:Counselled Maint Crew Members Conducting Procedure Re Event + (ML20087H956)
- ML20087H960 + (ML20087H960)
- U-602481, Requests That Action Requested by GE Supporting Change in Mislocated Fuel Bundle Event Acceptance Criteria Be Considered Cost Beneficial Licensing Action for CPS in Accordance W/Nrc Administrative Ltr 95-02 + (ML20087H963)
- 05000311/LER-1984-003-01, :on 840215,pressurizer Overpressure Protection Sys Actuated Due to Induced Pressure Transient.Caused by Starting Reactor Coolant Pump.Operating Procedure OPII-1.3.4 Amended + (ML20087H970)
- PLA-2100, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-23.Corrective Actions:Total Responsibility Assumed for Design Change Process & Program for Processing FSAR Change Requests Adopted + (ML20087H973)
- ML20087H977 + (ML20087H977)
- ML20087H981 + (ML20087H981)
- ML20087H984 + (ML20087H984)
- B15196, Application for Amend to License NPF-49,revising Action Statement of LCO 3.7.5 to Permit Plant Unit 3 to Remain in Modes 1-4 W/Average Water Temp of UHS Greater than 75 Degrees F for 12 H + (ML20087H990)
- 05000259/LER-1984-014-01, Updated LER 84-014-01:on 840222,reactor Scrammed When Turbine High Pressure First Stage Pressure Exceeded 142 Psig W/Turbine Stop Valves Closed.Caused by Procedural Error. Operating Instruction Revised + (ML20087H995)