Submits Summary of Bechtel Investigation & Corrective Actions to Resolve Issue of Nonconforming Matl Supplied by Tube-Line Corp,In Response to IE Bulletin 83-06.Final Response Expected by 840615
ML20087H890
Person / Time
Site: Midland
Issue date: 03/12/1984
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
28433, IEB-83-06, IEB-83-6, NUDOCS 8403220016
Download: ML20087H890 (2)


Text

.

I COR5058f8 power mm Voce President - Projects, Engineering and Construction e

Generel *)ffices: 1945 West ParnaH Road, Jackson, MI 49201 + (517) 788-0453 March 12, 1984 J G Keppler, Administratcr U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen E11yr=, IL 60137 MIDLAND ENERGY CENTER MIDLAND DOCKET NOS 50-329, 50-330 IE BULLETIN 83-06: NONCONFORMING MATERIALS SUPPLIED BY TUBE-LINE CORPORATION FILE: 0505.12 SERIAL:

28433

REFERENCE:

(1) B&W 10 CFR PART 21 REPORT DATED JANUARY 10, 1983 (2) I!&W LETTER TO R C DEYOUNG DATED JUNE 17, 1983 (3) CPC0 50.55(e) REPORT (82-06) TO J G KEPPLER DATED FEBRUARY 28, 1983 (4) CPC0 50.55(e) REPORT (82-06) TO J G KEPPLER DATED MAY 31, 1983 (5) CP C0 INTETIM IE BULLETIN 83-06 RESPONSE TO J G KEPPLER DATED NOVEMBER 17, 1983 In accordance with the directive given in IE Bulletin 83-06, this report.

identifies the activities that have been completed and/or are in progress, to resolve the issue of nonconforming material supplied by the Tube-Line Corporation (T-L).

An investigation has been performed by Bechtei San Francisco Central ' upplier S

Quality (SFHO) Department to determine if any sub-suppliers have supplied Tube-Line material to the Midland Plant. The following is a. summary of this investigation and of the corrective actions taken:

1.

To date, of the 413 letters nailed from SFHO, 65 letters went to vendors that supplied material to the Midland project. Bechtel Ann Arbor has received 84 (99%) of the Midland responses.

2.

Of the 84 responses, 81 vendort have responded that no Tube-Line material was furnished to Midland. The three vendors that have furnished Midland Tube-Line material are Guyen Alloys, Liberty Equipment, and W J Woolley.

3.

All Tube-Line ma+ trial identified as being furnished to Midland has been entered on nonconformance reports.

oc0384-0781a100 8403220016 840312 NM19 N/*

PDR ADOCK 05000329 fQ G

PDR

~-

g s.

2 I

a) Nonconformance Report C-00355; identifies 50 fittings received from l

Guyon Alloy and Liberty Equipment, 17 fittings are located in Warehouse No 1 in the separated hold area with hold tags attached.

b) Nonconformance Report C-00961; identifies nine fittings from Guyon Alloy and Liberty Equipment that have been incorporated into Q systems. All nine fittings have been located and a hold tag placed on l

each fitting.

c) Nonconformance Report C-00915; identifies two 10" caps from W J Woolley that have been incorporated into ASME Class-2 Air Tank OT-921. Hold tags have been attached.

t These three Nonconformance Reports are scheduled to be dispositioned by June 1, 1984.

A final report on IE Bulletin 83-06 is planned for June 15, 1984.

/