i OPERATING DATA REPGtT I
DOCKET NO. 050-0331 l
DATE 03-15-64 j
COMPLETED BY Kenneth S. Putnam TELEPHONE 319-051-7456 I
i OPERATING STATUS Notes f
- 1. Unit Name Duane Arnold Energy Center
- 2. Reporting Period February, 1984
- 3. Licensed Thermal Power (MWt): 1658 I
- 4. Narneplate Rating (Gross MWe): 565 l
i
- 5. Design Electrical Rating (Not MWe):
538 l
- 6. Mawleum Dependable Capacity (Gross MWe): 545
- 7. Maximum Dependable Capacity (Not MWe):
515 i
- 8. If Changes Occur In Capacity Ratings (ltems Number 3 Through 7) Since the Last Repcet,' Give Reasons:
i i
- 9. Power Level to which Restricted, if Any (Not MWe):
1
- 10. Reasons For Restrictions, if Anya i
i l
I 1
This Month Yr-to-Date Camulative
- 11. Hours in Reporting Period 6%.0 1440.0
_ 79.584.0
- 12. Number of Hours Reactor Was critical 696.0 1274.6 57.209.6 i
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 g
3
- 14. Hoers Generator On-Line 6%.0 1248.9 55.691.6 s
- 15. Unit Reserve Shutdown Houra 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.098.451 1.875.408
_ __69.623.970
- 17. Gross Electrical Energy Generated (MWH) 374.414 636.841 23.3M.898
- 18. Net Electrical Energy Generated (MWH) 353.529 601.009 21.839.600
- 19. Unit Service Factor 1005 86.75 70.05 l
- 20. Unit Availability Factor 1005 86.75 70.05
- 21. Unit Capacity Factor (Using IOC Net) 98.65 81.05 53.35 l
- 22. Unit Capacity Factor (Using DER Net) 94.45 77.65 51.05
- 23. Unit Forced Outage Rate 05 13.35 17.25
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
t i
i
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
1 l
- Turbine Rating:;565,7 MWe Generator Rating: 663.5 (MVA) x.90 (Power Factor) = 597 MWe i
8403220017 840229 s
M s
. -C
.-.. -.. ~ - -. ~. -.
t e
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0331 UNIT Duane Arnold Eneroy Center i
j DATE March 15. 1984
)
l 008FLETED 8Y Kenneth S. Putnam i
TELEPHONE 319-851-74 %
i i
ICNTH February 84 l
I 4
i DAY AVERAGE DAILY POWER LEVEL DAY AVEtAGE DAILY POER LEVEL i
(MWe-Net)
(MWe-Net) 1 513 17 510 l
2 510 18 467 l
3 510 19 4 96
{
4 512 20 512 i
I 5
504 21 510 I
6 507 22 511 7
510 23 510
]
8 510 24 511 9
509 25 513 i
10 511 26 500 l
Il 498 27 515 12 484 28 514 i
13 510 29 515 14 511 30 15 505 31 16 508 j
INSTRUCTIONS On this format, list tPt awrego delly unit power level in Mwo-Net for each day in the reporting month. Compute to '
the nearest whole megewett.
\\
,wm.e 3 -
-mg-
,,,r e
y.ma.
m v.
w -.,
s
-e
-,,.,.,,.m,+.
eve-.-
,w.
g
-w
-s-~
UNIT SHUTDOUNS ANO POWER REDUCTIONS Dockot No. 050-0331 Unit Neoo Dunno Arnold Energy Conter Dato Mnrch 15 1984 REPORT MONTH February, 1984 Completed by Kenneth S. Putnam Telephone 319-851-7456 Licensee Cause & Corrective No.
Date E ve nt Action to Report #
Pre vent Recurrence NONE i
l 1
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 4
B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other(Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit 1-Same Source (9/77)
H-Other(Explain)
Dock:t No.
050 0331 Unit Duane Arnold En^rgy Center Date March 15, 1984 MAJOR SAFETY RELATED MAINTENANCE Completed by Kenneth 5. Putnam Telephone 319-851-7456 DATE SYSTEM COMP 0NENT DESCRIPTION 02-22-84 RHR Service Water IP22C, IP22A RHR Service Water Pumps repacked, new rings, system inspected Pumps 02-29-84 Reactor Building-Suppression Pool Inflatable seals on CV4304 and Replaced and adjusted actuator bolts.
Vacuum Breakers CV4305 02-29-84 HPCI HV2201 Turbine Stop Valve Replaced hydraulic oil seals in valve operator (LER 84-012 pending).
e
.a Docket No. 050-0331 Unit Duane Arnold Energy Ctr Date March 15,1984 84 Completed by Kenneth S. Putnam Telephone 319-851-7456 REFUELING INFORMATION 1.
Name of facility.
A.
Duane Arnold Energy Center 2
Scheduled date for next refueling shutdown.
A.
Fall, 1984 3
Scheduled date for restart following refueling.
A.
Fall 1984 4
Will refueling or resumption of operation theasofter require a technical specification change or other license amendment?
None currently 'Jentitled.
5 Scheduled date(s) for submitting proposed licensing action and supporting Information.
N/A 6
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unrevlemed design or performance analysis methods, significant changes In fuel design, new operating procedures.
None 7
The namber of fuel assemblies (a) in the core and (b) In the spent fuel storage pool.
A.
a) 368 b) 576 8
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is 3
planned, It number of fuel assemblies.
A, 2050 9
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
A.
1996
~
_m Docket No. 055-0331 Unit Duane Arnold Enerav Ctr Date March 15 1984 Completed by Kenneth S. Putnam Telephone 319-851-7456 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 02-01-84 Normal plant operation at 549 MWe - Gross.
i 02-02-84 At 1605 hours0.0186 days <br />0.446 hours <br />0.00265 weeks <br />6.107025e-4 months <br />, RM 4101A declared operable. 7-day LCO cancelled.
02-04-84
%t 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the HPCI steam supply was isolated is response to a spurious electrical spike in the HPCI auto / Isolation signal.
HPCI steam supply was reset at 2201 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.374805e-4 months <br />. (LCR 84-010).
02-05-84 At 1043 hours0.0121 days <br />0.29 hours <br />0.00172 weeks <br />3.968615e-4 months <br />, low Inlet air temperature caused Isolation of control building ve n t i l a t i o n and Initiation of the Intake "B"
standby filter unit (SFU).
(LER 84-011).
02-09-84 At 0814 hours0.00942 days <br />0.226 hours <br />0.00135 weeks <br />3.09727e-4 months <br /> a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LCO was commenced due to the results of sur vei l l a nce testing of the main steam I s o ^. J t i o n va l ve - leakage control system.
The electrical current to 3 of the 4 heaters used to prevent condensate buildup in steam drain lines was slightly lower than specified in the STP.
Two repeated tests founo the current satisfactory. After engineering re vi ew concluded that the system was operational and fully capable of performing its function, the LCO was cancelled.
02-14-84 At 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> sur ve i l l ance testing of a pressure differential instrument switch measuring detta P between the core spray sparger and the reactor pressure ve s s e l found PDIS-2139 slightly out of calibration. Redundant switch PDIS-2119 was in calibration and fully operable.
02-24-84 At 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />, the "B" Emergency Service Water (ESW) was declared inoperable when an auto vent va l ve would not seat.
The ESW loop was declared inoperable and an LCO commenced.
The vent val ve failure resulted in approximately a 10% reduction in ESW pump flow.
At 1216 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.62688e-4 months <br />, the "B" ESW pump was started following vent va l ye maintainance and the proper operation of the auto vent was verffled.
At 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br />, the "B" ESW loop was declared operable cancelling the LCO.
02-29-84 During sur olliance testing of HPCI, a steam stop va l ve failed to open In the required time af ter the - Aux. oil pump was started.
In response, at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, HPCl was declared inoperable and a 7 day LCO was commenced.
(LER 84-012 pending).
Normal Plant operation at 550 MWe-Gross.
]
y 1
w a
Iowa Electric Light and Ibwer Company March 15, 1984 C AEC-84 151 Director, Offir.e of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attn: Document Control Desk Sutject:
Duane Arnold Energy Center Docket No. 50-331 Op. License DPR-49 February, 1984 Monthly Operating Report
Dear Sirs:
Please find enclosed 12 copies of the Duane Arnold Energy Center Monthly Operating Report for February,1984.
The report has been prepared in accordance with the guidelines of Regulatory Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1.
Very trul y urs, Daniel L. Mineck Plant Superintendent - Nuclear Duane Arnold Energy Center DLM/KSP/pv*
Enclosures File A-118d, TE-5 cc: Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Maryland National Bank Bldg.
Region III Washington, D. C.
20555 799 Roosevelt Road Glen Ellyn, IL 60137 (1)
NRC Resident Inspector Director, Office of Management and Mr. Dennis Murdock Program Analysis Central lowa Power Cooperative U. S. Nuclear Regulatory Commission Marion, IA 52302 Washington, D. C. 20555 (1)
Mr. George Toyne, Gen. Mgr.
U. S. Nuclear Regulatory Commission Corn Belt Powar Cooperative ATTN: Mr. M. Thadani Box 508 Phillips Bldg.
Humboldt, IA 50548 Washington, D. C. 20555 INP0 Records Center 1100 Circle 75 Parkway yI Suite 1500 Atlanta, GA 30339 I
' Duane Arnold Energy Center
- EU. Box 351 Cedarllapids, Iowa 52406e 319'851.~att
.