Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086N110 + (ML20086N110)
- ML20086N114 + (ML20086N114)
- ML20086N121 + (ML20086N121)
- W3P84-0398, Documents Telcon W/Peranich Re Approval of Extension Request for Submittal of Independent Safety Engineering Group Rept of QA Practices at Facility.Rept Will Be Submitted by 840222 + (ML20086N130)
- ML20086N131 + (ML20086N131)
- ML20086N135 + (ML20086N135)
- ML20086N136 + (ML20086N136)
- ML20086N141 + (ML20086N141)
- NRC-91-0138, Monthly Operating Rept for Nov 1991 for Fermi 2 + (ML20086N147)
- ML20086N148 + (ML20086N148)
- 05000382/LER-1995-003-03, :on 950612,identified That as-found Set Pressures of Valves Outside of Allowable Tolerance.Cause Believed to Be Due to Inadequate Control of Variables in pre-installation Process.Procedure Revised + (ML20086N153)
- RBG-16-928, Interim Deficiency Rept DR-157 Re ASME Stock Fittings. Investigation Still in Progress.Next Rept by 840409 + (ML20086N157)
- RBG-16-980, Interim Deficiency Rept DR-108 Re Bergen-Paterson Supplied Pipe Support Components.Investigation Still in Progress.Next Rept by 840320 + (ML20086N159)
- ML20086N163 + (ML20086N163)
- ML20086N166 + (ML20086N166)
- 05000456/LER-1991-013-07, :on 911114,discovered That Relays Associated W/ 4160 Volt Busses Had Not Been Tested,Potentially Causing DG Inoperability.Caused by Surveillance Procedure Deficiency. Applicable Procedures Revised + (ML20086N169)
- ML20086N172 + (ML20086N172)
- ML20086N176 + (ML20086N176)
- ML20086N177 + (ML20086N177)
- ML20086N178 + (ML20086N178)
- ML20086N180 + (ML20086N180)
- ML20086N187 + (ML20086N187)
- ML20086N188 + (ML20086N188)
- ML20086N190 + (ML20086N190)
- TXX-4106, Interim Deficiency Rept Re Laminations & Delaminations in Cable Tray Support Column in Cable Spread Room.Initially Reported on 840111.Evaluation Continuing.Next Rept Expected by 840309 + (ML20086N195)
- ML20086N196 + (ML20086N196)
- ML20086N199 + (ML20086N199)
- NRC-84-0028, Deficiency & Part 21 Rept 84-01 Re Gould/Rundel Switch Failures.Initially Reported for Wolf Creek on 830824 & for Callaway on 830923.Generic Failure Results from Design Deficiency.Manufacturer Requested to Rept Per Part 21 + (ML20086N205)
- ML20086N207 + (ML20086N207)
- ML20086N214 + (ML20086N214)
- 05000324/LER-1991-019-02, :on 911112,results of Testing Indicated MSIV Leakage on Main Steam Lines C & D,Exceeding TS Limit of 11.5 Scfh.Cause Unknown.Main Steam Lines C & D MSIV Repairs Completed + (ML20086N215)
- ML20086N216 + (ML20086N216)
- ML20086N221 + (ML20086N221)
- LD-91-064, Forwards Nonproprietary & Proprietary Repts Re Functional Design Requirement for CEA Calculator & Functional Design Requirement for Core Protection Calculator,Respectively. Proprietary Repts Withheld (Ref 10CFR2.790) + (ML20086N226)
- ML20086N227 + (ML20086N227)
- ML20086N228 + (ML20086N228)
- ML20086N230 + (ML20086N230)
- ML20086N231 + (ML20086N231)
- ML20086N234 + (ML20086N234)
- ML20086N235 + (ML20086N235)
- ML20086N236 + (ML20086N236)
- ML20086N238 + (ML20086N238)
- ML20086N239 + (ML20086N239)
- ML20086N240 + (ML20086N240)
- ML20086N241 + (ML20086N241)
- ML20086N245 + (ML20086N245)
- ML20086N247 + (ML20086N247)
- 05000289/LER-1991-007-01, :on 911113,main Feedwater Pump Intentionally Tripped During Plant Heatup to Verify Stop Valve Closure. Both motor-driven ESF Pumps Started.Caused by Personnel Error.Event Reviewed W/Personnel + (ML20086N253)
- ML20086N255 + (ML20086N255)
- ML20086N260 + (ML20086N260)
- ML20086N292 + (ML20086N292)