ML20086N199

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1991 for Browns Ferry Unit 2,consisting of Info Re Unit Shutdowns & Power Reduction Data
ML20086N199
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/31/1991
From: Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20086N193 List:
References
NUDOCS 9112190142
Download: ML20086N199 (3)


Text

. --... - -..

4 REVISIONS TO OCTOBER 1991 MONTHLY OPERATING REPORT o112190142 911213 EDR ADOCK 05000259 PDR g

D y

i

^

DOCEET CO:

50-260-tr81T SHUIDOW25 fa0 POVER REDUCTIONS' 03IT CAME:

Two COMPLETED Bf:5. A. Nattiff REPORT MONTN:

OCTOBER 1991 TELEPMosE:(2e5) 729-2937

[.

l l

l l

l Method of l Licensee l

l l

Cause and Corrective; l l

l l

l Duration l l5 hutting Down -j Event l System

l. Component j Action to l

l No.

l Date jiype l (Mours) l Reason l Reactor lRepo.t No.

l Code' l Code $

l.

Frevent Recurrence

'l l'

I l

I I

~l I

I I

I l

l 1

~l i

I

<l l

I I

I i

l 10 l10/07/91 l 5 l

7.87 l'

8 l

5 l

l l

[ Dropped lead to 70 l

J l

j l'

l l

l l

l'

'l l percent power to repair l l

l' l

-l l

l l

l' l

lE1 moisture separator l

l l

l l

l l

l l

l lk set control valve, l

1 1

"I I

I l

i I

I l

l 11 l10/18/91 'l 5

l 92,32 l

8 l

2 l

l l

l$5utdowr reactor to l

l l

l l

l l~

l l

l lidentify and repair

['

l l

l l

l l

[

'l l

lteakage in the drywelt.

l 1

1 I

i l

i I

I I

I l 12 l10/22/91 l F l

.87

-l A

l 9

l l

l l Curing unit.tartup j

l l

l l

l

.l l

l l.

l generator brea6er inas l

l l

l l

l j

j l

l lctosed and reverse l

l l

l l

l l

l l

l

{ power annunciator l

l l

l l

l

-l l

l l

latarmed. U3 reverse.

j l

l l

l j

l l

l

[

l power relay was moved l

l l

l l

l l

l l

l lto f)2 ond U2 was put l

l l

I I

i

'l i

I I

lon tine-1 I

I I

I i

i 1

I l

l 1

1 I

I l

l I

1 1

1 I

I i

1 1

1 I

I I

I I

I l

l l

1 I

i i

I f

1 l

'F: Forced Reason:

Method:

'Eshibit G-Instructions S: Scheduled A-Equipment Isiture (Explain) 1-Manual for Preparation of Data 9-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Screm Event Report (LER) File D-Regulatory Restriction 4-Continuation of Enisting Outage (mupEG-061)

E-Operator Training and License Esamination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain) 5Exhibit 1-Same source H-Other (Explain) 0449k "m

. - =t OPS,'RATICE DATA REPORT DOCKET NO.

50-260 PREPAkED BY

5. A Ratliff TELEPHONE [255i 72 9 937 OPERATING STATUS Notes 1.

Pnit Name:

Browns Ferry Unit Tvo 2.

Reportin7 PeriM:

OCTOBER 1991 3.

Licensed Thermal Power (MWt): 3293 4

Nameplate Rating (Gross Ede):

1152 5.

Design Electrical Rating (Net Nde): _1065 6.

Maximu:n Dependable Capqcity (Cross Nde): 1098.4 7.

Maximum Dependable Capdcity (Net Nde): 1065 8.

If Changes Occur in Capacity Ratings t'Ytems Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Pever Level To Which Restricted, If Any (Net N4?):

N/A

10. Etasons For Restrictions, If Any:

N/A This Month Tr-to-Date Cumulative

11. Hours in Reporting Period 745.0 7296.0 146167
12. Number of Bours Reactor Was Critical 667.2 3225.1 59085
13. Reactor Reserwe Shutdevn Hours 0

0 I q?)_

14 Maurs Generater On-Line El. 5

._ _ J71' 4,__

' J ~ " 1._ _

q,, ;.

m 7

~

- ~..

s NM (f}

db I

[y4 g:s u

u m

uk h Y

'br4; O

Lg W hs

~

9*E9

e I

game O

h 0

y

OPERATING DATA REPORT DOCKET NO.

50-260 PRETARED BY

5. A. Ratliff TELEPHONE T2D5T72 M V)7 OPERATING STATUS Notes 1.

Unit Namt ___ Browns Ferry Unit Two 2.

Reportir.- Period:

OCTOBER 1991 3.

Licensed Thermal Power (MWt):

3293 i

4 Nameplate Rating (Closs fWe): _1152 5.

Design Electrical Rating (Net We): _1065 6.

Maximum Dependable Capqcity (Gross MWe): 1098.4 7.

Maximum Dependable Capdcity (Net FNe): _1065

(

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report N/A

, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A 1

This Month Tr-to-Date Cumula*ive

11. Hours in Reporting Period 745.0 7296.0 146167
12. Number of Hours Reactor was Critical 667.2 3225.1 59085
13. Reactor Reserve Shutdown Hours 0
14. Hours Gererator On-Line 0

14200 651.5 2712.4 37051

15. Unit Reserve Shutdown Hours O
16. Gross Thermal Energy Generated (EG) 0 0

1986152.1

'V0730.1 160595897

17. Cross Electrical Energy Generated (5"d) 668500.0
18. Net Electrical Energy Generated (MG)

_364450.0 _

53136248 651871.0 2262437.0 51313558

19. Unit Service Factor 87.4 37.2
20. Unit Availability Factor

'?.0 87.5 37.2

21. Unit Capacity Factor (Using MDC Net)

.:9.0 I

l 82.2

22. Unit Capacity Factor (Using DER Net) 29.1 33.0 82.2 29.1 33.0
23. Unit Forced Outage Rate 0.1 61.8 54.1

{

1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

{

s

25. If Shat Down At End Of Report Period, Estimated Date cf Startup:

N/A 0449k/12

}

4 i

i i

_