Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085H857 + (ML20085H857)
- ML20085H879 + (ML20085H879)
- 05000278/LER-1991-016-02, :on 910914,fire Watch Required by TS 3.14.D for Four 4 Kv Switchgear & Two Battery Rooms Not Performed by Fire Watch Patrol.Caused by Lack of Specificity in Clearance Control Form.Fire Watch Established + (ML20085H892)
- ML20085H898 + (ML20085H898)
- ML20085H899 + (ML20085H899)
- ML20085H900 + (ML20085H900)
- ML20085H914 + (ML20085H914)
- ML20085H922 + (ML20085H922)
- ML20085H938 + (ML20085H938)
- LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E + (ML20085H951)
- JAFP-20-0024, Request to Rescind Confirmatory Order EA-14-009 + (ML20085H976)
- ML20085H985 + (ML20085H985)
- ML20085J011 + (ML20085J011)
- ML20085J018 + (ML20085J018)
- SNRC-1855, Suppls 910826 Response to NRC Request for Addl Info from 910816 Meeting Re Decommissioning Plan.Topics Include, Removal of Insulation from Around Reactor Pressure Vessel & from Around Contaminated Piping Sys + (ML20085J026)
- ML20085J042 + (ML20085J042)
- ML20085J051 + (ML20085J051)
- ML20085J052 + (ML20085J052)
- ML20085J054 + (ML20085J054)
- ML20085J065 + (ML20085J065)
- ML20085J068 + (ML20085J068)
- ML20085J069 + (ML20085J069)
- ML20085J071 + (ML20085J071)
- ML20085J076 + (ML20085J076)
- ML20085J078 + (ML20085J078)
- ML20085J092 + (ML20085J092)
- ML20085J097 + (ML20085J097)
- ML20085J128 + (ML20085J128)
- ML20085J171 + (ML20085J171)
- ML20085J172 + (ML20085J172)
- ML20085J173 + (ML20085J173)
- ML20085J178 + (ML20085J178)
- ML20085J187 + (ML20085J187)
- ML20085J204 + (ML20085J204)
- ML20085J205 + (ML20085J205)
- ML20085J223 + (ML20085J223)
- 05000413/LER-1995-002-05, :on 950517,discovered That TS Surveillance Interval Had Been Exceeded.Caused by Unclear Mgt Directions/ Policy Guidance.Work Order Issued & Channel Calibration Performed + (ML20085J225)
- ML20085J236 + (ML20085J236)
- ML20085J246 + (ML20085J246)
- ML20085J257 + (ML20085J257)
- ML20085J263 + (ML20085J263)
- ML20085J267 + (ML20085J267)
- ML20085J268 + (ML20085J268)
- ML20085J271 + (ML20085J271)
- NRC-95-4485, Forwards AP600 Thermal/Hydraulic Uncertainty Deliverables for Tasks 1 & 4 + (ML20085J277)
- ML20085J280 + (ML20085J280)
- NRC-95-4486, Forwards W Proprietary Rept MT01-GSR-011, AP600 Notrump Core Makeup Tank Preliminary Validation Rept for 500-Series Natural Circulation Tests + (ML20085J293)
- ML20085J301 + (ML20085J301)
- ML20085J307 + (ML20085J307)
- ML20085J312 + (ML20085J312)
- ML20085J318 + (ML20085J318)