Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083B431 + (ML20083B431)
- AECM-83-0792, Forwards Application to Amend License NPF-13,revising Tech Specs to Increase Surveillance Requirements for Rosemount Trip Units & Riley Temp Switches Listed in Table 4.3.2.1-1 + (ML20083B433)
- 05000325/LER-1995-003, :on 950404,identified That non-staggered Testing of EDGs Had Occurred During Various Times of Plant Operating History.Caused by Defective Procedures & Deficiency.Testing Schedule Revised + (ML20083B441)
- ML20083B443 + (ML20083B443)
- ML20083B445 + (ML20083B445)
- 0CAN049514, Advises of Mod to QA Manual Operations + (ML20083B451)
- ML20083B453 + (ML20083B453)
- ML20083B458 + (ML20083B458)
- ML20083B459 + (ML20083B459)
- HL-1811, Requests That 890517 Request for Amend to Licenses DPR-57 & NPF-5,incorporating Generic Ltr 87-09 Guidance Re Sections 3.0 & 4.0,be Withdrawn.Existing TS Do Not Unduly Restrict Facility Operation + (ML20083B464)
- ML20083B465 + (ML20083B465)
- ML20083B468 + (ML20083B468)
- ML20083B471 + (ML20083B471)
- ML20083B473 + (ML20083B473)
- ML20083B474 + (ML20083B474)
- ML20083B479 + (ML20083B479)
- ML20083B487 + (ML20083B487)
- ML20083B489 + (ML20083B489)
- HL-1821, Requests 880513 Application for Amend to Licenses DPR-57 & NPF-5,revising TS Stroke Time Operability Requirements for Main Steam Line Isolation Valves,Be Withdrawn + (ML20083B491)
- ML20083B494 + (ML20083B494)
- ML20083B498 + (ML20083B498)
- ML20083B502 + (ML20083B502)
- ML20083B506 + (ML20083B506)
- ML20083B508 + (ML20083B508)
- ML20083B517 + (ML20083B517)
- AECM-83-0783, Monthly Operating Rept for Nov 1983 + (ML20083B521)
- ML20083B524 + (ML20083B524)
- 05000255/LER-1983-076-03, /03L-0:on 831117,hourly Fire Insp Tour of Control Room HVAC Room Not Completed.Caused by Personnel Error. Security Shift Leader Counseled + (ML20083B527)
- ML20083B531 + (ML20083B531)
- ML20083B534 + (ML20083B534)
- ML20083B537 + (ML20083B537)
- 05000327/LER-1983-168-03, /03L-0:on 831118,diesel Generator 1A-A Declared Inoperable When Generator Failed to Start During Performance of SI-7.1.Caused by short-circuited Lamp Holder.Lamp Holder Replaced + (ML20083B540)
- 05000302/LER-1983-054-03, /03L-0:on 831116,while Attaching Identifier Tags on Conduit Connector for Emergency Feedwater Flow Indicator, Cable Connector Pulled Loose.Caused by Personnel Error. Connection Tightened + (ML20083B541)
- 05000346/LER-1983-064-03, /03L-0:on 831111,main Steam Line Atmospheric Vent Valve FV-ICS-11A Could Be Opened W/Safety Features Actuation Signal/Sfrcs Trip Simulated.Caused by Defective Solenoid Valves SV-ICS-11A1 & 2.Valves Rebuilt + (ML20083B543)
- ML20083B544 + (ML20083B544)
- 05000237/LER-1983-154-03, /03L-0:on 831119,unidentified Drywell Leakage Calculated to Be 3.08 Gpm.Caused by Cut in Seal Ring Setting Area on Feedwater Check Valve Body.Cut silver-soldered & New Seal Ring Installed + (ML20083B548)
- ML20083B549 + (ML20083B549)
- 05000302/LER-1983-052-03, /03L-0:on 831107,containment Monitoring Isolation Valve WSV-6 Failed Closed.Caused by Blown Fuse Due to Defective Light Bulb.Circuit Reenergized + (ML20083B550)
- 05000328/LER-1983-170-03, /03L-0:on 831118,valve 2-FCV-63-84 Declared Inoperable Due to Indication in Control Room of Valve Being in Throttle Position.Caused by Limit Switch Out of Adjustment.Adjustments Made + (ML20083B556)
- ML20083B560 + (ML20083B560)
- 05000346/LER-1983-062-03, /03L-0:on 831109,Group 3 Safety Rods Drove to 75% Withdrawn,Resulting in Integrated Control Sys Auto Asymmetric Rod Runback to 60%.Caused by Faulty Programmer Boards & Dusty Control Rod Drive Cabinets + (ML20083B572)
- ML20083B581 + (ML20083B581)
- ML20083B584 + (ML20083B584)
- ML20083B593 + (ML20083B593)
- ML20083B595 + (ML20083B595)
- 05000395/LER-1983-060, /03L-0:on 831117,investigation Into Previously Submitted LER 83-060 Revealed Four Testable Components Not Tested on Quarterly Basis.Caused by Inadequate Procedure.Test Procedures Revised + (ML20083B597)
- 05000338/LER-1983-081-03, /03L-0:on 831118,individual Rod Position Indication for Channels M-10,F-06 & L-11 Deviated from Group Demand Position by Greater than 12 Steps.On 831120,channel 1-03 Deviated.Caused by Instrument Drift + (ML20083B600)
- ML20083B603 + (ML20083B603)
- 05000260/LER-1983-075-03, /03L-0:on 831116,during Startup,Following Reactor Scram,R Factor Found Below R Setpoint of 1.0.Caused by Xenon Transient Due to Reactor Scram & Pulling of Rods to Prescram Pattern.Rods Inserted + (ML20083B607)
- 05000339/LER-1983-076-03, /03L-0:on 831121,discovered That Leakage Surveillance Test on Containment Personnel Air Lock Not Performed within Allowable 6-month Interval.Caused by Personnel Error.Test Performed on 831122 + (ML20083B608)
- ML20083B611 + (ML20083B611)