Carolina Power &figh mpany La u m v m -
P. O. Box 101, New Hill, N. C. 27562 December 15,1983 Mr. James P. O'Reilly NRC-159 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)
Atlanta, Georgia 30303 CAROLIN A POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 SEISMIC QUALIFICATION TEST FAILURE OF STARTING AIR CHECK VALYES FOR EMERGENCY DIESEL-ENGINE GENERATOR SETS, ITEM 111
Dear Mr. O'Reilly:
Attached is our second interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21, on December 23,1982. CP&L is i
pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by February 17,1984.
Thank you for your consideration in this matter.
Very truly yours, W
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment ec:
Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)
Mr. R. C. DeYoung (NRC)
OFFICIAL. COPY
(( 2 7 8312210191 831215 gDRADOCK 05000400 PDR
/o
4
.,x
.Q 4
l 2
i
(
^
CAROLING POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 SECOND INTERIM REPORT DECEMBER 15, 1983 SEISMIC QUALIFICATION TEST FAILURE OF THE STARTING AIR CHECK VALVES FOR THE EMERGENCY DIESEL ENGINE GENERATOR SETS ITEM 111 (DDR 1255)
REPORTABLE UNDER 10CFR50.55(e) AND 10CFR21 4
i 4
j.
t
,-~,__,-,-------.,--,w-.,,,~,--
-.--,-----.,-...,,..-.._,,.,_n,w.,,.
' ~
SUBJECT:
Shearon Harris Nuclear Power Plant Unit No. I 10CFR50.55(e) and 10CFR21 reportable deficiency.
Seismic qualification test failure of these starting air check t-valves for the emergency diesel-engine generator sets.
ITEM:
Starting air check valves (vendor Part No. 74046-146, Iem 5252) of the starting air system for the emergency diesel-engine generator sets.
SUPPLIED BY:
Transamerica DeLaval Inc., Oakland, California under CP&L Purchase Order NY-435079.
NATURE OF DEFICIENCY:
In December, 1982, Transamerica DeLaval, Inc., notified
~~'
CP&L of a potential problem with a starting air check valve. This valve is to be installed in the line between the starting air compressor and the starting air storage tanks. This valve functions to allow the air compressor to charge the storage tank and prevent backflow once the tanks are charged.
During Seismic Qualification Testing, one of the starting air check valves was found to leak. A valve containing a modified disc assembly has since been seismically tested and accepted.
4 1
DATE PROBLEM OCCURRED:
Refer to section above.
DATE PROBLEM REPORTED:
December 23, 1982, CP&L (L. E. Jones) notified the NRC (A. Hardin) that this item is reportable under the provisions of 10CFR50.55(e) and 10CFR21.
SCOPE OF PROBLEM:
This problem involves three starting air check valves.
REASONS DEFICIENCY IS REPORTABLE:
The emergency diesel-engine generator sets supply on-site power to safety and essential loads in the event of the loss of both normal on-site and off-site power.
Proper operation of the starting air system is necessary to start the diesel engine generators.
Improper operation could affect the availability of emergency on-site power.
~
e
+v w,-,
m,.~-.
~ ~ ~,.
,, ~,,
,-.m.
ee
---w
-n-w
,~g-
-n,r r.,-
9 CORRECTIVE ACTION:
The three affected valves were returned to Transamerica DeLaval Inc. for modifications. The vendor has indicated that the modified valves will be returned to CP&L by December 30, 1983.
FINAL REPORT It is currently projected that the final report will be submitted by February 17, 1984.