Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083A317 + (ML20083A317)
- 05000369/LER-1983-109-03, /03L-0:on 831112,average Lower Containment Air Temp Exceeded 125 F for Approx 2 H & 20 Minutes & Again for 2 H & 30 Minutes.Caused by Fouling of Ventilation Sys Air Handling Unit Cooling Coils + (ML20083A320)
- ML20083A321 + (ML20083A321)
- ML20083A322 + (ML20083A322)
- ML20083A325 + (ML20083A325)
- ML20083A329 + (ML20083A329)
- ML20083A331 + (ML20083A331)
- ML20083A336 + (ML20083A336)
- ML20083A337 + (ML20083A337)
- ML20083A340 + (ML20083A340)
- ML20083A341 + (ML20083A341)
- ML20083A342 + (ML20083A342)
- 05000220/LER-1983-035-03, /03L-0:on 831105,feedwater Pump 12 Removed from Svc Due to Overheating Bearing.Caused by Discharge Check Valve Failure to Close,Resulting in Reverse Rotation of Pump.Valve Seated & Pinion Gears Replaced + (ML20083A349)
- ST-HL-AE-1029, Supplemental Deficiency Rept Re Westinghouse Steam Generator Tube Rupture Analysis.Initially Reported on 820119.Design of Pressurizer PORV Changed to safety-grade,active,solenoid- Operated Valves Powered by Class IE Sources + (ML20083A357)
- ML20083A365 + (ML20083A365)
- ML20083A376 + (ML20083A376)
- 05000271/LER-1983-031-03, /03L-0:on 831101,during Live Steam Bench Testing of Two Main Steam Relief Valves,S/N 67HH14 Had 1,122 Psig as-found Setpoint.Caused by Setpoint Drift.Valve Recalibr & Reinstalled + (ML20083A385)
- ML20083A388 + (ML20083A388)
- ML20083A390 + (ML20083A390)
- ML20083A396 + (ML20083A396)
- ML20083A397 + (ML20083A397)
- ML20083A411 + (ML20083A411)
- ML20083A415 + (ML20083A415)
- ML20083A418 + (ML20083A418)
- ML20083A420 + (ML20083A420)
- ML20083A422 + (ML20083A422)
- ML20083A430 + (ML20083A430)
- ML20083A439 + (ML20083A439)
- ML20083A444 + (ML20083A444)
- ML20083A447 + (ML20083A447)
- ML20083A454 + (ML20083A454)
- ML20083A457 + (ML20083A457)
- ML20083A458 + (ML20083A458)
- ML20083A459 + (ML20083A459)
- ML20083A460 + (ML20083A460)
- ML20083A462 + (ML20083A462)
- ML20083A466 + (ML20083A466)
- ML20083A470 + (ML20083A470)
- ML20083A473 + (ML20083A473)
- ML20083A477 + (ML20083A477)
- ML20083A480 + (ML20083A480)
- ML20083A486 + (ML20083A486)
- ML20083A498 + (ML20083A498)
- ML20083A500 + (ML20083A500)
- 05000302/LER-1983-039, Informs That Engineering Investigation of 12 Process Instruments Discovered Out of Calibr During Surveillance Testing & Reported in LER 83-039 Nearing Completion.Next Rept Expected by 840127 + (ML20083A514)
- PLA-1973, Final Deficiency Rept Re Insufficient Corrosion Allowance for Essential Svc Water Piping to & from RHR Pump Motor Oil Coolers.Initially Reported on 831102.Piping to Be Replaced. Also Reported Per Part 21 for Unit 2 + (ML20083A520)
- 05000220/LER-1983-038-03, /03L-0:on 831110,discovered That Emergency Condenser Isolation Valves Not Stroke time-tested Correctly. Caused by Nonconforming Test Procedure.Procedure Revised to Comply W/Tech Specs + (ML20083A523)
- ML20083A535 + (ML20083A535)
- ML20083A539 + (ML20083A539)
- ML20083A543 + (ML20083A543)
- ML20083A548 + (ML20083A548)