Monthly Operating Rept for Nov 1983
ML20083A325
Person / Time
Site: Pilgrim
Issue date: 11/30/1983
From: Hamliton P, Harrington W
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
83-296, NUDOCS 8312200254
Download: ML20083A325 (7)


Text

-

OPERATING DATA REPORT 50-293 DOCKET NO.

DATE December 15 1983 COMPLETED BY P_ UnmflPon TELEPHONE 617 - 746-7900 OPERATING STATUS Notes Pilgrim 1

1. Unit Name:

November, 1983

2. Reporting Period:

1998 ,

3. Licensed Thermal Power (MWt):

678

4. Nameplate Rating (Gron MWe);

655

5. Design Electrical Rating (Net MWe): 0
6. Maximum Dependable Capacity (Gross MWe):

670

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NONE ,

NONE

9. Power Level To Which Restricted. lf Any (Net MWe).
10. Reasons For Restrictions.lf Any:

NOTE: Unit is in coastdown.

This Month Yr. to-Date Cumulative 720.0 8016.0 96216.0 I1. Hours in Reporting Period 7576.5 69521.8 720.0

12. Number Of flours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdow.i Hours 720.0 7434.8 67314.0
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 13927944.0 116641536.0 1184232.0
16. Gross Thermal Energy Generated (MWH) 39133814.0 395870.0 4806990.0 .-
17. Gross Electrical Energy Generated (MWH) 4621772.0 37603283.0 379099.0
18. Net Electrical Energy Generated (MWH1 70.0 100.0 92.7
19. Unit Service Factor 92.7 70.0 100.0
20. Unit Availability Factor 78.6 86.1 58 3
21. Unit Capacity Factor (Using MDC Neil 59.7 80.4 88.0
22. Unit Capacity Factor (Using DER Net) 9.3 0.0 5.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:

Refuel outage to commence December 10, 1983.

Unit Operating

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior o Commercial Operation): Forecast Achieved INITIAL CRITICALITY .

INITIAL ELECTRICITY COMMERCIAL OPER ATION c>i> > >

Ooff,j0,y t ,,,, , ; y

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-293 Pilgrim 1 DATE 12/1983 P.J. IIamilton COMPLETED BY 617-746-7900 TELEPHONE MONTH November. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

, 567. 497-g 2 566. 18 519.

561. 518, 3

540.

4 20 515.

530, 5 23 514.

6 515.

22 7

552. 510.

23 g 549, 509.

24 547, 9 25 506.

10 544. 500.

26 yj 540, 27 A99.

33*

538. 28 494.

537. 49 13 g4 533. 489, 30 15 531.

16 528.

INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

50-293 tlNil SillfilH)WNS AND POWER REDtlC110NS IKM'KEI NO.

(INITNAME Pilstrim Station 12/15/83

. DAit

. November, 1983 (:oMrg,E gen gy P. Hamilton s

HWR I MONIH 617 746-7900 T El.ErlH)NE i

i "i

.3O

=_.

re 3w e . - S

"*, 7 EN I .ft elKcc (*3qse & (*eartr(live i

E g4, c N"- I h c 3$ 8.Q l i

$ 23E Event x? j As sin,, in

$ r$ 3 5 hv 5, y Repost # $0 0 Pievent Rcourenic 6

No power Reductions or Shutdowns which met Reg. Guide 1.16 report-ing criteria occurred during Nov-ember.

I i

Tvon Reason Method Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H 5-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Freparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-SI61) e e

a e

REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to BECo dated January 13, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Powcr Station, Docket Number 50-293.
2. Scheduled date for next Refueling Shutdown: December, 1983
3. Scheduled date for restart following refueling: April, 1984
  • 4.
5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6. The fuel, which had been loaded during the 1981 scheduled refuel-ing outage, is of the same P8X8R design, as loaded the previous outage consisting of 112 P8DRB282 assemblies and 60 P8DRB265 as-semblies.
7. (a) There are 580 fuel assemblies in the core.

(b) There are 1125 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

    • 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 645 fuel assemblies.
    • 189 new reload bundles added to fuel pool during November to support upcoming refuel outage #6.
  • Subject to change after analysis of recirculation pipe testing results.

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Operational Summary for November, 1983 The month commenced with the unit at 87% power as limited by fuel depletion.

Power was temporarily reduced on November 4,1983, to backwash and heat treat the main condenser. The generator remained synchronized to the grid and no significant problems were experienced during the month. The plant was opera-ting at 77% at the end of the month due to continued fuel depletion.

Safety Relief Valve Challenges Month of November, 1983 Requirement: T.M.I. T.A.P. II.K.3.3 Reason: No safety / relief valve challenges occurred during the month of November, 1983

PILCRIM NUCLEAR POWER STATION Month

  • MAJOR SAFETY RELATED MAINTENANCE ,

CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER

~

Drywell Containment Incorrect het Administra- Recalibrated Revised procedure to re- Ref.:

pressure per- point in regards tive error pressure switches flect correct set point during amend- to correct change LER 83-057/0lT-0 missive set to technical points specifications ment to T.S . setting.

RCIC A0-1301-71 Steam Leak Body Casket Reinjected with Replace gaske,t during plant Bonnet Leaking Furmanite outage HPCI 2301-S1 Speed Reading high Static Sprayed inside None; Routine Maintenance Indication during normal of indicator inoperative run, and recalibrated Instrument TRU-9045 Downscale Faulty RTD. Isolat'd e prob- RTD to be replaced during LER to be issued.

Control lem to location outage inside the torus. .

Station 125V "B" Bat- Ground 1) Dirty 1) Cleaned bat- 1) Developed routine Battery tery Battery teries cleanup PM

2) HPCI gov - 2) Dried mois- 2) Repair steam leak dur-ernor ture in HPCI ing Plant shutdown speed co 'i - governor trol cir -

control cir-cuit cuit. ,

CRD Accumulator Would not hold Valve Stem Replaced valve None - Isolated incident -

Control Rod pressure Leakage

  1. 10-11 T

f 9

0

% e EOSTON EDISON COMPANY B00 BovLaTON STREET BOSTON. MASSACNUSETTS O2199 WILUAM D. HARRINGTON sarson wees poseeeew?

NM beAA December 15, 1983 BECo Ltr. #83H296 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Docket No. 50-293 License DPR-35

Subject:

November, 1983 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectfully submitted.

i"^ el William D. Harrin ton WDH/ko cc: Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Standard BECo Monthly Report Distribution iI

- .. ---.. -