Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080N006 + (ML20080N006)
- 0CAN128302, Submits Final Routine Status Rept of Drawing Control Program Progress.Pilot Program to Redraw Isometric Drawing Using Computer Aided Drafting Sys Under Evaluation + (ML20080N009)
- ML20080N010 + (ML20080N010)
- NRC-84-0031, Interim Part 21 Deficiency Rept SDR 83-13 Re Cracks in Limitorque Valve Operator Limit Switch Rotors.Final Rept Will Not Be Available Until 840331 + (ML20080N012)
- ML20080N013 + (ML20080N013)
- ML20080N015 + (ML20080N015)
- ML20080N019 + (ML20080N019)
- 05000368/LER-1983-038-03, /03L-0:on 830818,core Protection Calculator Channel a Placed in Bypasss & Channel D Tripped.Caused by Point Identification Number 064 for Channels Reading Less than Min + (ML20080N021)
- 05000316/LER-1984-001, :on 840117,boron Injection Tank Diluted by Primary Water After Equipment Clearance Permit Released & Sys Realigned.Caused by Open Untagged Valve.Individual Responsible for Restoration Forms Notified + (ML20080N022)
- BECO-LTR-95-028, Radioactive Effluent & Waste Disposal Rept Including Meteorological Data Jul-Dec 1994 + (ML20080N025)
- 05000395/LER-1984-005, :on 840117,steam Generator B Low Level Caused Feedwater Flow Low Reactor Trip.Caused by Personnel Error. Surveillance Test Procedures Under Rev + (ML20080N029)
- ML20080N031 + (ML20080N031)
- ML20080N033 + (ML20080N033)
- 05000395/LER-1984-004, :on 840117,two Cable Junction Boxes Found Not Wrapped W/Kaowool & One Cable Run Had Damaged Kaowool in Three Areas.Caused by Const & Maint Activities in Area. Discrepancies Repaired + (ML20080N035)
- ML20080N040 + (ML20080N040)
- ML20080N041 + (ML20080N041)
- ML20080N042 + (ML20080N042)
- ML20080N047 + (ML20080N047)
- ML20080N048 + (ML20080N048)
- ML20080N049 + (ML20080N049)
- 2CAN128311, Submits Summary Evaluation of Design of Core for Fourth Cycle of Operation at 100% Rated Core Power of 2,815 Mwt.No Unreviewed Safety Questions Exist as Result of Third Cycle Reload.Cycle 4 Core Map Encl + (ML20080N054)
- ML20080N060 + (ML20080N060)
- ML20080N061 + (ML20080N061)
- ML20080N069 + (ML20080N069)
- ML20080N077 + (ML20080N077)
- ML20080N079 + (ML20080N079)
- ML20080N083 + (ML20080N083)
- ML20080N084 + (ML20080N084)
- ML20080N085 + (ML20080N085)
- ML20080N086 + (ML20080N086)
- ML20080N088 + (ML20080N088)
- ML20080N090 + (ML20080N090)
- ML20080N092 + (ML20080N092)
- ML20080N098 + (ML20080N098)
- ML20080N105 + (ML20080N105)
- ML20080N106 + (ML20080N106)
- ML20080N109 + (ML20080N109)
- ML20080N111 + (ML20080N111)
- ML20080N112 + (ML20080N112)
- ML20080N114 + (ML20080N114)
- ML20080N117 + (ML20080N117)
- ML20080N118 + (ML20080N118)
- ML20080N128 + (ML20080N128)
- ML20080N129 + (ML20080N129)
- ML20080N131 + (ML20080N131)
- ML20080N134 + (ML20080N134)
- ML20080N136 + (ML20080N136)
- ML20080N137 + (ML20080N137)
- ML20080N140 + (ML20080N140)
- ML20080N144 + (ML20080N144)
- ML20080N146 + (ML20080N146)