Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-83-0585, Updated RO 83/044/1:on 830509,listed fire-rated Penetrations Opened to Implement Design Changes.Hourly Fire Watches Established.Work Tasks Will Be Completed by 831101 + (ML20080H205)
- ML20080H217 + (ML20080H217)
- 05000296/LER-1983-024-01, Mlhgr for Rod Withdrawal Error Scenario Exceeded 1% Plastic Strain Linear Heat Generation Rate Limit for Eight LTA Bundles.Caused by Lack of Communication Between GE Personnel + (ML20080H221)
- ML20080H229 + (ML20080H229)
- ULNRC-06568, Nuclear Property Insurance Reporting + (ML20080H235)
- ML20080H236 + (ML20080H236)
- ML20080H237 + (ML20080H237)
- ML20080H238 + (ML20080H238)
- 05000269/LER-1983-015-03, /03L-0:on 830819,during Reactor Bldg Personnel Hatch O-ring Seal Leak Rate Test,Gasket Blew Out,Causing Hatch to Be Technically Inoperable.Caused by Component Failure.Gasket Replaced + (ML20080H241)
- ML20080H242 + (ML20080H242)
- ML20080H247 + (ML20080H247)
- ML20080H248 + (ML20080H248)
- ML20080H253 + (ML20080H253)
- ML20080H254 + (ML20080H254)
- ML20080H255 + (ML20080H255)
- ML20080H258 + (ML20080H258)
- ML20080H259 + (ML20080H259)
- ML20080H263 + (ML20080H263)
- ML20080H264 + (ML20080H264)
- ML20080H265 + (ML20080H265)
- ML20080H267 + (ML20080H267)
- ML20080H268 + (ML20080H268)
- ML20080H269 + (ML20080H269)
- 05000395/LER-1983-097-03, /03L-0:on 830818,during Mode 2 Operation, Indication for Refueling Water Storage Tank Level Transmitter LT-993 Drifted Low.Caused by Internal Component Failure.Transmitter Replaced + (ML20080H273)
- ML20080H284 + (ML20080H284)
- ML20080H296 + (ML20080H296)
- AECM-83-0512, Updated RO 83-045/1:on 830515,fire Doors Blocked Open to Allow Routing of Hoses Into Control Room to Seal fire-rated Penetrations.Fire Watch Established.No Effect Detected on Public Health & Safety + (ML20080H298)
- AECM-83-0589, Updated RO 83-055/1:on 830607 & 09,fire Penetrations CE-365F,CE-274D,AP3G & AP2G Opened & Cut for Implementation of Design Changes.Fire Watch established.AP3G & AP2G Restored 830826.CE-365F & CE-274D Will Be Resealed 831101 + (ML20080H304)
- 05000296/LER-1983-052-03, /03L-0:on 830816,diesel Generator 3ED Failed to Reach Rated Speed on Automatic Start.Caused by Failed Woodward Governor Microswitch 11SM3-T.Switch Replaced.Diesel Generator Returned to Svc + (ML20080H310)
- ML20080H311 + (ML20080H311)
- PNP 2020-010, Annual Report of Changes in Emergency Core Cooling System Models + (ML20080H320)
- 05000362/LER-1984-003, :on 840107,while in Mode 3 at Zero Power,During Planned Reactor Shutdown,Control Element Assembly (CEA) 64 Slipped 30 Inches.Caused by Sluggish Operation of CEA Drive Mechanism.Vendor Requested to Review Event + (ML20080H321)
- AECM-83-0584, Updated RO 83-049/1:on 830526,Halon Bottle 2 in Panel P936 Discharged Until Empty.Caused by Foreign Stimulus.Switches Labeled & Provided W/Protective Covers + (ML20080H325)
- ML20080H332 + (ML20080H332)
- 05000389/LER-1983-045-03, /03L-0:on 830817,neutron Flux Indication B on Hot Shutdown Panel Failed.Caused by Broken Wire on Feedback Wiper.Wire Repaired + (ML20080H333)
- ML20080H335 + (ML20080H335)
- ML20080H336 + (ML20080H336)
- ML20080H338 + (ML20080H338)
- ML20080H339 + (ML20080H339)
- ML20080H342 + (ML20080H342)
- ML20080H344 + (ML20080H344)
- ND-20-0266, Revised Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019R1) + (ML20080H345)
- ML20080H346 + (ML20080H346)
- ML20080H349 + (ML20080H349)
- ML20080H351 + (ML20080H351)
- 3F0295-04, Forwards Response to NRC Ltr Dtd 950110.Response Withheld, Per 10CFR73.21 + (ML20080H356)
- ML20080H357 + (ML20080H357)
- ML20080H361 + (ML20080H361)
- ML20080H364 + (ML20080H364)
- ML20080H369 + (ML20080H369)
- ML20080H370 + (ML20080H370)