Reiterates Concerns Expressed in 830301 Resolution 5065 Re Premature Licensing of Plant
ML20080H267
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/13/1983
From: Billig M
SAN LUIS OBISPO, CA
To: Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8309210224
Download: ML20080H267 (3)


Text

-

,,, s r,,. e n b vocaer numaaR non 1.uTunc.50Aa%gg3 3'igj@g.7%m city of sanluis oBisp 3

OFFICE OF THE MAYOR

  • 990 PM.M STREET

- gj e nw+.um -

W Post Office Box 321

  • San Lue Of m:co. CA 93406-0321
  • 805/541-1 gg gg September 13, 1983 GFFICE OF SECRtTAs-00CKETING & SERVID.

BRANCH

-REC *D CHRun.

SERVED SEP 2 01983 Mr. Nunzio J. Palladino 19 SEP 83 10: Chairman Nuclear Regulatory Commission Matomic Building 1717 H Street NW Washington, D.C.

20555

Dear Mr. Palladino:

The City Council of San Luis Obispo wishes to reiterate its concerns, regarding the possible premature licensing of the Diablo Canyon Nuclear Power Plant, that were expressed in Resolution 5065 (1983 series) passed-in March 1983 (copy attached).

We are dedicated to the concept that government is responsible for allowing adequate public input and for the health and safety of its citizens; therefore, we urgently request that all reports be received and verified, that public hearings be completed and analyzed, and that the Nuclear Regulatory Commission be fully satisfied regarding full compliance by the plant operators before you issue a low power license for Diablo.

S n er ly,

\\

Ga

\\

L Melanie C. Billig Mayor MCB:mkh

-7 8309210224 830913 f' W' PDR ADOCK 05000275 H

PDR

r i

RESOLUTION NO.5065(1983 Series)

A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO REQUESTING THE NUCLEAR REGULATORY COMHISSION DEFER RELICENSING OF DIABLO CANYON POWER PLANT UNTIL REVERIFICATION PROGRAM AND SAFETY STUDIES ARE COMPLETED WHEREAS the Diablo Canyon power plant has been the subject of a reverification analysis of its seismic safety as required by the U.S.

Nuclear Regulatory Commission (NRC); and WHEREAS the NRC recently adopted a licensing schedule which permits restoration of the plant's license and fuel loading before the reverifi-cation program is completed, before the results are analyzed, and before

.-any correct ve act on called for in that program, if any, can be imple-i i

~

mented; and

=WHEREAS the licensing schedule for the plant also has no provision for the completion of studies of three plant safety systems ordered by the NRC, nor for the analysis of those studies, nor for the implementation of their recommendations; THEREFORE, BE IT RESOLVED that the City Council of the City of San Luis Obispo urges, in the interest of the public's health and safety, that licensing, foel loading or operation of the Diablo Canyon power plant be deferred until the reverification program and safety studies commissioned by the NRC are finished; the plant is proven to be safe; and all plant isodifications to safety related structures, systems, and components are completed.

SECTION 1.

The City Clerk shall furnish copies of this resolutica to:

Nuclear Regulatory Commission; Congressman Leon E. Panetta; and Congressman Morris Udall R 5065

Resolution No.

/

33 Ssries)

Page 2 On motion of Councilman Griffin seconded by Mavor Billig and on the following roll call vote:

AYES:

Councilman Griffin, Mayor Billig and Councilwoman Dovey NOES:

Councilman Dunin ABSENT:

Councilman Settle the foregoing Resolution was passed and adopted this 1st. day of March 1983.

i J',u i. ;

V D.N I

e I

n.

(AYp r C. TILLIG ATTE :

ftAm N

CITT CLERK PAMELA'V0G lS s

Approved:

.s ace City Administrativd Offiger

_41 w City Attorney i

.