ML20080H370
| ML20080H370 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/13/1983 |
| From: | Chiangi N CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 62, MQAH-83-258, NUDOCS 8309210266 | |
| Download: ML20080H370 (1) | |
Text
CP&L awn 4%m B3 S P. O. Box 101, New Hill, North Carolina 27562 September 13, 1983 FILE:
SH N-2/18 MQAH 83-258 Item 62 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET No. 50-400 DRESSER SUPPLIED PRESSURE GAGES
Dear Mr. O'Reilly:
This is to confirm the September 12, 1983 telephone conversation between Mr. N. J. Chiangi (CP&L) and Mr. A. Hardin (NRC).
Mr. Hardin was informed that the September 23, 1981 potentially reportable item, pertaining to Dresser Industries supplied pressure gages that were not seismically qualified by Dresser as required by Ebasco Purchase Order NY-435104, has been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.
Thank you for your consideration in this matter.
Yours very truly, NJC/mt cc:
Mr. R. C. DeYoung N. J.
angi - Manager Quality Assurance / Quality Control Mr. R. L. Prevatte Harris Plant 8309210266 030913 PDR ADOCK 05000400 S
PDR OFFICIAL COPY l6h ll0
.