Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1984-001, :on 840108,reactor Tripped from Approx 30% Power During Unit Evolution - Hot Shutdown to Power Operation.Caused by Spurious Signal,Resulting in Closure of Steam Generator a Feedwater Flow Control Valve + (ML20080G175)
- ML20080G178 + (ML20080G178)
- ML20080G180 + (ML20080G180)
- ML20080G181 + (ML20080G181)
- JPN-95-004, Forwards Reload 11/Cycle 12 COLR + (ML20080G184)
- ML20080G185 + (ML20080G185)
- ML20080G186 + (ML20080G186)
- ML20080G187 + (ML20080G187)
- ML20080G188 + (ML20080G188)
- ML20080G191 + (ML20080G191)
- 05000362/LER-1983-116-13, /13X-0:on 831230,during Reactor Trip Breaker (Rtb) Surveillance Testing,Undervoltage Trip Device of Rtb 9 Exhibited Procedurally Unacceptable Response Time.Trip Device Removed from Svc.Cause Not Determined + (ML20080G196)
- ML20080G197 + (ML20080G197)
- ML20080G198 + (ML20080G198)
- ML20080G199 + (ML20080G199)
- ML20080G208 + (ML20080G208)
- ML20080G212 + (ML20080G212)
- ST-HL-AE-4983, Requests That NRC Review & Accept WCAP-13360, Westinghouse Dynamic Rod Worth Measurement Technique by 950701,so That Technique Can Be Used to Measure Rod Worths During start-up Following Scheduled Unit 2 Refueling Outage in Fall 1995 + (ML20080G213)
- ML20080G215 + (ML20080G215)
- ML20080G216 + (ML20080G216)
- ML20080G217 + (ML20080G217)
- 05000346/LER-1982-045-03, Auxiliary Feedwater Pump 1-1 Suction Valve FW786 Closed W/O Operator Touching Close Button.Cause Unknown.Valve Reopened.Surveillance Test Performed + (ML20080G218)
- ML20080G220 + (ML20080G220)
- ML20080G221 + (ML20080G221)
- ML20080G224 + (ML20080G224)
- ML20080G227 + (ML20080G227)
- ML20080G231 + (ML20080G231)
- ML20080G232 + (ML20080G232)
- ML20080G235 + (ML20080G235)
- ML20080G239 + (ML20080G239)
- 0CAN088305, Submits Seventh Monthly Rept on Progress of Regulatory Response & Commitment Control Program.Two of Six Open Items Re Fire Protection Completed.Response Items Associated W/ IE Bulletins 79-02 & 79-15 Addressed in Separate Rept + (ML20080G243)
- ML20080G245 + (ML20080G245)
- BECO-LTR-95-003, Monthly Operating Rept for Dec 1994 for Pilgrim Nuclear Power Station + (ML20080G248)
- ML20080G254 + (ML20080G254)
- ML20080G257 + (ML20080G257)
- ML20080G260 + (ML20080G260)
- ML20080G266 + (ML20080G266)
- ML20080G268 + (ML20080G268)
- ML20080G273 + (ML20080G273)
- ML20080G275 + (ML20080G275)
- ML20080G277 + (ML20080G277)
- ML20080G278 + (ML20080G278)
- 1CAN029502, Requests Withdrawal of Licenses SOP-43076-3 for Ck Thompson & SOP-4536-3 for ED Wentz + (ML20080G279)
- ML20080G286 + (ML20080G286)
- ML20080G288 + (ML20080G288)
- ML20080G294 + (ML20080G294)
- ML20080G301 + (ML20080G301)
- ML20080G303 + (ML20080G303)
- ML20080G308 + (ML20080G308)
- BECO-84-020, Advises That Incorrect Title 10 Ref Source Provided in Paragraph 3 of Designating Encl 1 as Safeguards Info.Proper Ref Should Be 10CFR2.790(d)(1) + (ML20080G310)
- ML20080G313 + (ML20080G313)
- ML20080G317 + (ML20080G317)