Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079A629 + (ML20079A629)
- ML20079A631 + (ML20079A631)
- ML20079A647 + (ML20079A647)
- ML20079A662 + (ML20079A662)
- ML20079A699 + (ML20079A699)
- ML20079A708 + (ML20079A708)
- JAFP-95-0900, Submits Plant Annual Rept Re SRV Challenges & Failures + (ML20079A718)
- ML20079A725 + (ML20079A725)
- RBG-33672, Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components + (ML20079A741)
- RBG-33676, Responds to Violations Noted in Insp Rept 50-458/89-11. Corrective Actions:Tagging Program Strengthened Through Procedural Upgrades & Enhanced Training + (ML20079A744)
- ML20079A777 + (ML20079A777)
- ML20079A781 + (ML20079A781)
- ML20079A794 + (ML20079A794)
- ML20079A796 + (ML20079A796)
- LIC-94-0256, Forwards Fort Calhoun Station Performance Indicators for Nov 1994 + (ML20079A812)
- ML20079A822 + (ML20079A822)
- ML20079A834 + (ML20079A834)
- 05000293/LER-1994-004, :on 940803,automatic Primary Containment Isolation Control Sys Actuation Occurred.Caused by Improper Alignment of Control Valve Fulcrum Alignment Pins.Vents Added to Oil Sump & Sys Oil Pressure Reduced + (ML20079A838)
- ML20079A846 + (ML20079A846)
- ML20079A851 + (ML20079A851)
- ML20079A859 + (ML20079A859)
- ML20079A867 + (ML20079A867)
- ML20079A869 + (ML20079A869)
- ML20079A870 + (ML20079A870)
- ML20079A873 + (ML20079A873)
- ML20079A876 + (ML20079A876)
- ML20079A880 + (ML20079A880)
- ML20079A894 + (ML20079A894)
- BECO-LTR-94-137, Ack Receipt & Review of SALP Board Rept for Period Covering 930314-941008 + (ML20079A898)
- 05000423/LER-1991-012, :on 910503,spurious Control Bldg Isolation Signals Occurred.Caused by Radiation Monitor Power Supply Failure.Single Channel Area Monitor Board Replaced & Satisfactorily Tested + (ML20079A912)
- 05000354/LER-1991-007-01, :on 910505,filtration,recirculation & Ventilation Sys Units Discovered Inoperable During Surveillance Test.Caused by Blown Heater Control.Blown Fuses Replaced & Unit Returned to Operable Status + (ML20079A913)
- 05000298/LER-1991-002, :on 910324,reactor Water Cleanup Isolation Occurred Due to High Sys Temp.Caused by Inadequate Design. Design Process for Plant Changes Strengthened Since Design Completed + (ML20079A915)
- 05000339/LER-1991-002-03, :on 910514,automatic Start of 2H Emergency Diesel Generator Occurred Caused by de-energization of 2H Emergency Bus.Caused by Personnel Error.Abnormal Procedure Loss of Electrical Power Entered + (ML20079A917)
- ML20079A918 + (ML20079A918)
- 05000271/LER-1994-016, :on 941130,unisolable Svc Water Piping Leaks Resulting in Inoperability of Ws Subsystems & Alternate Cooling Subsystem.Ut Insps Have Been Completed on Similar Piping in SW Sys W/O Other Problems + (ML20079A919)
- 05000366/LER-1991-014, :on 910508,discrepancy Noted Between TS 3.9.10 & Design of High Density Fuel Storage Sys Racks in Spent Fuel Pool.Caused by Less than Adequate Design Change Safety Evaluation.Change to TS 3.10.D Will Be Sent + (ML20079A921)
- 05000277/LER-1991-011-01, :on 910508,discovered That ST 16.2.1, Fire Sys Weekly Check Inadvertently Deferred Beyond TS Time Limit. Caused by Misleading Test Frequency Listed on Test.Test Revised & Event Reviewed W/Personnel + (ML20079A923)
- 05000285/LER-1991-009, Corrected Ltr Forwarding LER 91-009-00.Memo Stationery Inadvertently Used Instead of Letterhead Stationery for Cover Ltr + (ML20079A925)
- ML20079A927 + (ML20079A927)
- 05000354/LER-1991-009-01, :on 910508,full Reactor Protection Sys Actuation Occurred Due to Electronic Spiking of Intermediate Range Monitor G.Caused by Equipment Malfunction.Monitor Replaced Prior to Plant Return to Power + (ML20079A928)
- 05000325/LER-1991-012, :on 910503,unexpected ESF Actuation Occurred While Hanging Clearance.Caused by Personnel Error.Involved Clearance Ctr Personnel Counseled & Review of Event Conducted in Operations Real Time Training + (ML20079A930)
- 05000325/LER-1991-013, :on 910507,coincident Hpic/Rcic Discovered Inoperable.Caused by Loss of RCIC High Steam Flow Transmitter.Tightening of Leaking Fitting & Venting & Filling of Sensing Lines Performed + (ML20079A931)
- ML20079A934 + (ML20079A934)
- 05000425/LER-1991-007-02, :on 910507,automatic Reactor Trip Occurred. Caused by Generator Loss of Field.Design Change Implemented to Allow Plant Computer to Monitor Status of Generator Field Shorting Breaker + (ML20079A935)
- ML20079A937 + (ML20079A937)
- ML20079A941 + (ML20079A941)
- 05000374/LER-1991-001-01, :on 910110,high Pressure Core Spray Pump Room & Turbine Bldg Fire Rated Barrier Discovered Degraded During Insp.Caused by Failure to Install Fire Barriers.Establish Hourly/Continuous Fire Watch + (ML20079A944)
- BSEP-94-0522, Forwards Response to NRC Re Violations Noted in Insp Repts 50-324/94-32 & 50-325/94-32 on 941001-1104. Corrective Actions:Work Supervisor Has Been Counseled Re Weaknesses in Preplanning for Job + (ML20079A947)
- 05000263/LER-1991-010, :on 910507,reaction Protection Sys Actuation Occurred.Caused by Spurious Increase of Intermediate Range Monitor Signals.Investigation Initiated.Procedures Revised + (ML20079A948)
- 05000259/LER-1991-006-02, :on 910507,unplanned ESF Actuation Occurred When Control Room Emergency Ventilation Sys Initiated. Caused by Design Which Made It Difficult to Perform Work. Util Will Evaluate Need for Design Change + (ML20079A949)
- ML20079A950 + (ML20079A950)