Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078L896 + (ML20078L896)
- U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 + (ML20078L899)
- ML20078L900 + (ML20078L900)
- ML20078L902 + (ML20078L902)
- ML20078L905 + (ML20078L905)
- ML20078L916 + (ML20078L916)
- ML20078L928 + (ML20078L928)
- ML20078L938 + (ML20078L938)
- 05000336/LER-1994-032, :on 941028,post Incident Recirculation Fan Flow Below Design Occurred.Cause Unknown.Work Scheduled to Adjust Fan Blades as Necessary to Achieve Required Air Flow Rate.W/ + (ML20078L945)
- ML20078L947 + (ML20078L947)
- 05000318/LER-1994-006-01, :on 941027,Unit 2 Tripped on Receipt of Reactor Protective Sys Loss of Load Signal.Caused by Failure to Adequately Address Potential Risks of Work Newly Assumed by Electrical Maint Group.New Links Installed + (ML20078L951)
- ML20078L952 + (ML20078L952)
- ML20078L956 + (ML20078L956)
- ML20078L958 + (ML20078L958)
- ML20078L959 + (ML20078L959)
- ML20078L960 + (ML20078L960)
- ML20078L968 + (ML20078L968)
- ML20078L971 + (ML20078L971)
- ML20078L975 + (ML20078L975)
- PMNS20200139, Notice of Meeting with Southern Nuclear Operating Company + (ML20078L979)
- ML20078L981 + (ML20078L981)
- ML20078L986 + (ML20078L986)
- ML20078L988 + (ML20078L988)
- BSEP-95-0044, Forwards MDE-81-0485,Rev 1, TS Improvement Analysis for Reactor Protection Sys for Brunswick Steam Electric Plant, Units 1 & 2 + (ML20078M006)
- ML20078M011 + (ML20078M011)
- ML20078M015 + (ML20078M015)
- ML20078M023 + (ML20078M023)
- ML20078M029 + (ML20078M029)
- ML20078M030 + (ML20078M030)
- ML20078M033 + (ML20078M033)
- ML20078M035 + (ML20078M035)
- ML20078M036 + (ML20078M036)
- ML20078M039 + (ML20078M039)
- ML20078M041 + (ML20078M041)
- PY-CEI-NRR-0074, Clarifies Criteria 1,2 & 10 of 830916 Submittal Re TMI Action Plan Item II.B.3, Post-Accident Sampling Sys. Chemistry Technicians Requalified Biannually.Offsite Boron Analysis Performed Only on Undiluted Sample + (ML20078M042)
- ML20078M044 + (ML20078M044)
- ML20078M045 + (ML20078M045)
- ML20078M049 + (ML20078M049)
- ML20078M056 + (ML20078M056)
- ML20078M073 + (ML20078M073)
- ML20078M077 + (ML20078M077)
- 05000461/LER-1995-001, :on 950105,FW Heater Train Operation During Removal of FW Heater from Svc Was Not Understood & Resulted in Decreased FW Temp,Loss of Heater Level Control & Manual Scram.Plugged 5B FW Heater Tubes + (ML20078M098)
- TXX-9429, Forwards Response to Nirs & Cfur 940926 2.206 Petition on Thermo-Lag at CPSES Unit 1 + (ML20078M102)
- RBG-41180, Forwards Proposed Clarifications to LAR 91-11 Re Removal of Component Lists,Addressing NRC Concern of Further Identifying Scope of TS Line Item,Per GLs 91-01 & 91-08 + (ML20078M108)
- ML20078M111 + (ML20078M111)
- ML20078M113 + (ML20078M113)
- ML20078M116 + (ML20078M116)
- ML20078M117 + (ML20078M117)
- ML20078M125 + (ML20078M125)
- 05000336/LER-1994-038, :on 941026,identified That Local Leak Rate Testing Not Adequately Performed on Containment Penetrations.Caused by Personnel Error.Revs to Surveillance Procedure Sp 2605D Initiated + (ML20078M136)
- ML20078M137 + (ML20078M137)