Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077F931 + (ML20077F931)
- ML20077F936 + (ML20077F936)
- ML20077F937 + (ML20077F937)
- ML20077F938 + (ML20077F938)
- ML20077F942 + (ML20077F942)
- ML20077F944 + (ML20077F944)
- 2CAN129402, Forwards Response to Violations Noted in IRs 50-313/94-08 & 50-368/94-08.Corrective Actions:Licensee Expanded Scope of ESF Component Surveillance Test Methodology Review After Initial Condition Discovered + (ML20077F954)
- ML20077F958 + (ML20077F958)
- ML20077F959 + (ML20077F959)
- ML20077F962 + (ML20077F962)
- BECO-LTR-94-135, Monthly Operating Rept for Nov 1994 for Pilgrim Nuclear Power Station + (ML20077F963)
- ML20077F977 + (ML20077F977)
- ML20077F978 + (ML20077F978)
- ML20077F980 + (ML20077F980)
- ML20077F981 + (ML20077F981)
- ML20077F982 + (ML20077F982)
- 0CAN078302, Submits Sixth Monthly Rept on Progress of Regulatory Response & Commitment Control Program + (ML20077F989)
- ML20077F990 + (ML20077F990)
- ML20077F995 + (ML20077F995)
- ML20077F996 + (ML20077F996)
- ML20077F998 + (ML20077F998)
- ML20077G001 + (ML20077G001)
- ML20077G002 + (ML20077G002)
- ML20077G007 + (ML20077G007)
- ML20077G009 + (ML20077G009)
- ML20077G010 + (ML20077G010)
- ML20077G011 + (ML20077G011)
- ML20077G015 + (ML20077G015)
- ML20077G016 + (ML20077G016)
- ML20077G019 + (ML20077G019)
- ML20077G021 + (ML20077G021)
- ML20077G023 + (ML20077G023)
- ML20077G025 + (ML20077G025)
- ML20077G033 + (ML20077G033)
- ML20077G035 + (ML20077G035)
- ML20077G042 + (ML20077G042)
- B10843, Forwards Probabilistic Safety Study, Vols 1-12,in Response to NRC 810921 Request + (ML20077G047)
- ML20077G056 + (ML20077G056)
- ML20077G069 + (ML20077G069)
- ML20077G082 + (ML20077G082)
- ML20077G085 + (ML20077G085)
- ML20077G088 + (ML20077G088)
- ML20077G090 + (ML20077G090)
- TXX-3627, Responds to IE Bulletin 82-04.Discrepancies Not Indicated in Examined Bunker Ramo Electrical Penetration Assemblies. Onsite Test Program Needed for Acceptance of in-line Butt Splices.Extension to 830701 Requested to Complete Review + (ML20077G091)
- ML20077G102 + (ML20077G102)
- ML20077G106 + (ML20077G106)
- ML20077G109 + (ML20077G109)
- ML20077G118 + (ML20077G118)
- 05000267/LER-1977-043-03, Region Outlet Temp of One Region Exceeded Tech Spec Limit.Caused by Small Lateral Movements of Fuel Columns.Core Region Constraint Installed + (ML20077G121)
- ML20077G131 + (ML20077G131)
- 05000267/LER-1980-007-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced + (ML20077G134)