Slide Presentation Entitled, ACRS Full-Committee Briefing- Shoreham Status
ML20077G021
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/11/1990
From: Brown S
NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML20077F967 List:
References
FOIA-90-568 NUDOCS 9106210197
Download: ML20077G021 (17)


Text

--

r j

a z,

ACRS FULL-COMMITTEE "i

1 BRIEFING j

s SHOREHAM STATUS l

MAY 11,1990

[

i STAFF'S PROJECT MANAGER r

i STCWART BROWN i

492-1444 O

i.

o, w

D 62 7 910523

,3 j

j MCGRANE90-568 PDR t

I PRESENTATION AGENDA 4

i 1)

BACKGROUND 2)

EQUIPMENT PRESERVATION PROGRAM 3)

SITE STAFFING 4)

STATUS OF RELIEF REQUESTS I

5)

DECOMMISSIONING ISSUES i

6)

CONCLUSION l

I ACRS 5/11/90 SUDE.2 I

b 1)

BACKGROUND

{

FEBRUARY 28, 1989 - LILCO ENTERED INTO.^".

l AGREEMENT WITH THE STATE OF NEW YORK

)

i' APRIL 21.1989 - THE NRC ISSUED THE i

SHOREHAM FULL-POWER LICENSE I

i l

JUNE 28,1989 - LILCO SHAREHOuGERS RATIFIED THE AGREEMENT l

l; JUNE 30,1989 - DESTAFFING AND DEFUELING ACTIVITIES BEGAN i

(

i i

JULY 8,1989 - REACTOR VESSEL HEAD REMOVED i

j ACRS 5/11/90

[

SUDE-3 j

BACKGROUND (continued)

AUGUST 9,1989 - DEFUELING COMPLETED, ALL FUEL IN SPENT FUEL POOL MARCH 29,1990 - THE STAFF ISSUED AN ORDER REQUIRING LILCO TO RECElVE NRC APPROVAL PRIOR TO FLACING NUCLEAR FUEL bat *" INTO THE REACTOR VESSEL APRIL 18,1990 - COUNSEL FOR THE SHOREHAM-WADING RIVER CENTRAL SCHOOL DISTRICT, AND SCIENTISTS AND ENGINEERS FOR SECURE ENERGY FILED A PETITION TO INTERVENE AND A REQUEST FOR HEARING i

l ACRS 5/11/90 SUDE 4 l

s 2).

EQUIPMENT PRESERVATION PROGRAM l

LILCO CATEGORIZED THE 125 PLANT SYSTEMS OR i

PORTIONS-OF SYSTEMS INTO ONE OF THREE GROUPS I

BASED ON THE SERVICE OF THE EQUIPMENT WHILE THE PLANT !S IN A DEFUELED CONDITION:

l l

l l

1).QPERABLE SYSTEMS SYSTEMS REQUIRED BY THE TECH. SPECS. N THE t

l DEFUELED CONDITIONS l

  • SYSTEMS ARE MAINTAINED IN THE SAMFI

[

CONDITION THAT THEY WERE PRIOR TO THE

[

PLANT'S DEFUELING l

EXAMPLES ARE:

DIESEL EMERGENCY POWER, FIRE i

PROTECTION, AND BATTERY POWER (125 VDC)

[

t i

k ACRS 5/11/90 i

SUDE.5 m.

m

i EQUIPMENT PRESERVATION PROGRAM (continued) i

2) FUNCTIONAL SYSTEMS SYSTEMS THAT ARE ESSENTIAL SUPPORT SYSTEMS BUT. NOT REQUIRED PER THE TECH. SPECS.

I MAINTENANCE PROGRAM HAS NOT BEEN DEGRADED, NORMAL ACCEPTED MAINTENANCE PRACTICES ARE CONTINUING ON THESE SYSTEMS EXAMPLES ARE:

FUEL POOL COOLING AND CLEANUP l

(PARTIAL), DOMESTIC WATER, AND COMPRESSED AIR

[

3)' PROTECTED SYSTEMS l

SYSTEMS THAT WILL NOT BE OPERATED WHILE THE PLANT IS MAINTAINED IN A DEFUELED CONDITION l

l THESE SYSTEMS HAVE BEEN PLACED INTO A LAY-UP l

5 CONDITION TO PROTECT THEM FROM DEGRADATION j

WITH MINIMAL CUSTODIAL SERVICE L

i EXAMPLES ARE:

ECCS, MAIN TURBINE, FEEDWATER,

{

i AND CONDENSATE ACRS 5/11/90' f

E SUDE-6 i

t

I' EQUIPMENT PRESERVATION PROGRAM (continued)

TYPICAL SYSTEM LAY-UP:

SYSTEM DRAINED (VENT AND DRAIN VALVES OPENED) AND DRIED AND MAINTAINED AT LESS THAN 35 % RELATIVE HUMIDITY t

ELECTRICAL. COMPONENTS POWER REMOVED WITH DISCONNECT DEVICES OPEN (EXCEPT FOR MOTOR HEATERS, IF NECESSARY)

PNEUMATIC DEVICES WILL BE PLACED IN THEIR FAIL-SAFE POSITION WITH SIGNAL AND PNEUMATICS ISOLATED BOUNDARY VALVES CLOSED AND YAGGED i

4 ACRS 5/11/90 SUDE-7

l 3)

SITE STAFFING l

STAFFING LEVEL PRIOR TO DESTAFFING (JUNE 30, 1989)....

826 AUTH.

EMPLOYED.....

585 LILCO 114 CONTR.

CURRENT STAFFING LEVEL (AF R I L 30, 1990)..............

4 34 A U T H.

EMPLOYED......

376 LILCO 31 CONTR.

ACRS 5/11/90 SUDE-8

Y SITE STAFFING (continued) 4 THE STAFFING LEVELS BY FUNCTIONAL AREAS PRE-AGREEMENT LICENSEE STAFF / CONTRACTORS CURRENT LICEN'3EE STAFF / CONTRACTORS

?

l FUNCTIONAL AREAS:

4 LICENSED OPERATORS eo/o 25/0 1

i MAINTENANCE ioa/12 80/4 ENGINEERING 7 a /1 s 44/3 1,

1 RADCON/ CHEM 4o/ia 4s/i2 4

MISC.

299/71 182/12 TOTAL PLANT STAFF s e sli i 4 376/31 t

i ACRS 5/11/90 SUDE-9 l

J i

5 SITE STAFFING (continued)

THE STAFF RECENTLY CONDUCTED A SITE INSPECTION OF THE PLANT STAFFING LEVELS AND FOUND:

i LileO CONTINUES TO FILL MANAGEMENT POSITIONS LILCO CONTINUES TO HIRE AND TRAIN STAFF i

LILCO's 10 TRAINING PROGRAMS CONTINUE TO BE l

INPO ACCREDITED-LILCO CONTINUES TO MEET ITS TECH. SPECS. AND USAR STAFFING REQUIREMENTS 1

I SITE STAFFING LEVELS ARE REASONABLE FOR THE CURRENT PLANT STATUS i

i l

1 ACRS 5/11/90 l

CUDE-10 i

i l

l

. 4)

STATUS OF RELIEF REQUESTS 1

IN THE MARCH 12, 1990, COMMISSION PAPER (SECY 90-084) THE STAFF INDICATED THAT LILCO HAD 12 REQUESTS BEFORE THE STAFF.

SINCE ISSUANCE OF SECY'90-084, LILCO HAS MADE TWO ADDITIONAL REQUESTS.

THE CURRENT STATUS OF THE PENDING REQUESTS:

t I

ACTIO N S CO M P LETE D............................................. 7 EXPECTED TO BE COMPLETED BY 5/31.............. 5 EXPECTED TO BE COMPLETED BY 6/30..............1 i

i i

DEVELDPING POSITION (NO SCHEDULE)...........1 r

l ACRS 5/11/90 i

SUDE-1 1

9 STATUS OF RELIEF REQUESTS (Continued)-

1.

ORGANIZATIONAL CHARTS...................... COMPLETE 2.

PROCEDURE APPROVAL............................COM PLETE 3.

CONTROL ROOM VENT ALARM................. WITHDRAWN 4.

CONTROL ROD EXERCISE............................WITH DRAWN 5.

INSURANCE EXEMPTION............................. COMPLETE 6.

USA R EX EM PTI O N.........................................CO M P LETE 7.

EDG TESTING - (GL 84-15).......................... COMPLETE ACRS 5/11/90 SUDE-12

STATUS OF RELIEF REQUESTS (continued) 8.

EP EX E M PTI O N.............................................. 5/3 0/90

  • cf 9.

S E C U R iTY....................................................... 5/3 0/ 90

  • 10.

RETS (GL 8 9 -01 )...................................... 5/3 0/9 0 11.

AP PEN DIX J EXEM PTlON......................... 5/20/90 12.

DEFUELED OPERATING LICENSE.............N/S 13.

FITNESS-FOR-DUTY EXEMPTION.......... 6/30/90 14.

T D I WAI V E R................................................ 5/3 0/90

  • INTERVENTION ACRS 5/11/90 SUDE-13 l

)

l 5)

DECOMMISSIONING ISSUES BASED ON THE TERMS OF THE SHOREHAM SETTLEMENT AGREEMENT:

LILCO IS TO TRANSFER (AFTER NRC APPROVAL) THE SHOREHAM PLANT TO THE LONG ISLAND POWER AUTHORITY (LIPA)

LIPA IS TO BE RESPONSIBLE FOR ULTIMATE DECOMMISSIONING OF SHOREHAM LIPA's PRINCIPAL TECHNICAL CONSULTANT IS TO BE THE NEW YORK POWER AUTHORITY (NYPA)

ACTUAL DECOMMISSIONING OF THE PLANT IS TO BEGIN AFTER THE NRC HAS APPROVED TRANSFER OF THE OPERATING LICENSE AND THE DECOMMISSIONING PLAN ACRS 5/11/90 SUDE-14

DECOMMISSIONING ISSUES (continued)

APRIL 16,1990, LILCO SUBMITTED A " DECOMMISSIONING REPORT" LILCO, LIPA, AND NYPA ARE SCHEDULED TO BRIEF THE STAFF ON THE DECOMMISSIONING REPORT ON MAY 24,1990 1

ALTHOUGH A FINAL DECISION ON THE METHOD TO DECOMMISSION THE SHOREHAM PLANT HAS NOT BEEN MADE, THE DECON DECOMMISSIONING ALTERNATIVE APPEARS TO THE BETTER CHOICE BASED ON:

- THE SMALL AMOUNT OF RADIOACTIVE CONTAMINATION

- COST EFFECTIVENESS ACRS 5/11/90 SUDE-15

DECOMMISSIONING lSSUES (continued) j i

i OPTIONS.BEING CONSIDERED FOR THE DISPOSAL OR INTERIM STORAGE OF THE' IRRADIATED FUEL:

l SALE TO ANOTHER UTILITY LOWER. ENRICHMENT (INITIAL LOAD)

WARRANTIES COVERING THE FUEL SHIPPING TO A REPROCESSING FACILITY STORAGE AT ANOTHER LICENSED FACILITY ONSITE STORAGE i

WET STORAGE DRY - STORAGE LEGAL ISSUES BEING ADDRESSED BY THE STAFF:

l THE AGENCY'S OBLIGATION AND RESPONSIBILITY UNDER THE NEPA LAW

[

-ENVIRONMENTAL IMPACT STATEMENT REQUIREMENTS l

ACPS 5/11/90 t-SUDE-16

l l

6)

CONCLUSION THE STAFF HAS FOUND NO SAFETY CONCERNS BASED ON ITS REVIEWS AND INSPECTIONS OF LILCO's EQUIPMENT PRESERVATION PROGRAM, SITE STAFFING, RELIEF REQUESTS, AND DECOMMISSIONING ISSUES I

r

  • THE STAFF WILL NOTIFY THE ACRS IF, DURING ITS CONTINUING REVIEWS AND SAFETY INSPECTIONS, IT DETERMINES THAT A SAFETY CONCERN EXISTS I

I ACRS 5/11/90 SUDE-17

.