Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000369/LER-1983-057-03, /03L-0:on 830716 & 21,while in Mode 1,reactor Coolant Loop B Over Temp Delta T Instrument Loop Found Reading Higher That Other Channels During Routine Surveillance.Caused by Chiller Problems + (ML20076F597)
- 05000369/LER-1983-056-03, /03L-0:on 830714,control Area Ventilation Sys Train B Declared Inoperable Due to Low Refrigerant Temp Trip of Control Room Area Chiller B Which Failed to Reset.Caused by Loose Flange on Suction Side of Compressor + (ML20076F605)
- ML20076F610 + (ML20076F610)
- ML20076F612 + (ML20076F612)
- 05000416/LER-1983-101-03, /03L-0:on 830718,during Performance of HPCS Diesel Generator Monthly Functional Test,Generator Tripped at Approx 800 Rpm.Cause Unknown.Diesel Restarted & Tested Successfully 12 H After Trip + (ML20076F617)
- ML20076F619 + (ML20076F619)
- ML20076F628 + (ML20076F628)
- ML20076F631 + (ML20076F631)
- 05000331/LER-1983-027, /01T-0:on 830803,during Surveillance Required by Inoperable RCIC (LER 83-027),speed Indication for HPCI Turbine Failed.Caused by Faulty Turbine Magnetic Speed Pickup.Turbine Oil Sys Adjusted + (ML20076F636)
- 05000389/LER-1983-039-03, /03L-0:on 830728,following Loss of Offsite Power W/Reactor Shut Down,Auxiliary Feedwater Pump 2C Tripped Three Times.Caused by Attempting to Manually Start Pump.No Cause Identified + (ML20076F639)
- ML20076F641 + (ML20076F641)
- ML20076F645 + (ML20076F645)
- ML20076F647 + (ML20076F647)
- AECM-83-0467, RO 83-068/0:on 830711,fire Rated Doors OC221 & OC115 Blocked Open to Support Planned Maint Activities.Fire Watches Established,Per Tech Spec 3.7.7,until Doors Restored on 830809 + (ML20076F650)
- ML20076F653 + (ML20076F653)
- ML20076F656 + (ML20076F656)
- ML20076F659 + (ML20076F659)
- 05000389/LER-1983-040-03, /03L-0:on 830718,during 50% Power,Qa Plasma Display Sys a Failed.Caused by Plasma Display Unit Failure.Unit Replaced & Satisfactorily Tested + (ML20076F660)
- ML20076F663 + (ML20076F663)
- AECM-83-0472, RO 83-067/0:on 830704,05 & 12,instruments on HPCS Spray Line,Lpcs Spray Line & Reactor Recirculation & Main Steam Piping,Respectively,Found Damaged.Caused by over-ranging. Instruments Will Be Replaced by 830826 + (ML20076F665)
- ML20076F667 + (ML20076F667)
- ML20076F670 + (ML20076F670)
- ML20076F673 + (ML20076F673)
- 05000338/LER-1983-053-03, /03L-0:on 830726,discharge Damper for 1-HV-F-40B Failed to Open While Running Associated Safeguards Exhaust Fan.Caused by Air Leak in Diaphragm of Actuating Mechanism for Damper AOD-HV-1301B.Damper Repaired + (ML20076F678)
- ML20076F680 + (ML20076F680)
- ML20076F682 + (ML20076F682)
- ML20076F683 + (ML20076F683)
- ML20076F686 + (ML20076F686)
- ML20076F687 + (ML20076F687)
- ML20076F691 + (ML20076F691)
- ML20076F694 + (ML20076F694)
- 05000296/LER-1983-041-03, /03L-0:on 830719,during Normal Operations,Control Rod Exercise SI 4.3.A.2 Not Performed within Required Schedule.Caused by Personnel Error.Personnel Counseled + (ML20076F703)
- ML20076F711 + (ML20076F711)
- AECM-83-0469, RO 83-069/0:on 830712,listed Penetrations,Cable Tray Cover & Access Hatch Barriers Opened to Support Planned Maint Activities.Hourly Fire Watches Established.Work Tasks Expected to Be Completed by 831130 + (ML20076F716)
- ML20076F731 + (ML20076F731)
- 05000338/LER-1983-050-03, /03L-0:on 830723,w/util Ramping Down & Reactor Power at 65%,axial Flux Difference Exceeded Target Band for 1 Minute.Caused by Tube Leak in Gland Steam Condenser.Axial Flux Returned to Required Band + (ML20076F734)
- ML20076F736 + (ML20076F736)
- ML20076F743 + (ML20076F743)
- A03174, Responds to 830406 SER Re Environ Qualification of Electrical Equipment for Facility.Corresponding Technical Evaluation Rept Contains No Proprietary Info & Can Be Released for Public Disclosure,Per 10CFR2.790 + (ML20076F745)
- 05000458/LER-1994-025, :on 940910,ADS Valve Inoperable Because Fire Wrap Not Replaced After Maint.Caused by Lack of Specific Rev for Connector Replacement.Administrative Procedure Developed + (ML20076F748)
- ML20076F757 + (ML20076F757)
- 05000315/LER-1983-069-03, /03L-0:on 830719,during Surveillance Testing on Diesel Generator Load Shedding Relays,Six GE Model NGV-13b Loss of Voltage Relays Exceeded Tech Spec Limit.Caused by Instrument Drift.Relays Readjusted + (ML20076F765)
- BSEP-83-1280, Responds to NRC Re Violations Noted in IE Special Training Assessment Repts 50-324/83-04 & 50-325/83-04. Corrective Actions:Orientation for New Employees Accomplished in Accordance w/TI-301 + (ML20076F766)
- ML20076F769 + (ML20076F769)
- ML20076F776 + (ML20076F776)
- 05000315/LER-1983-070-03, /03L-0:on 830723,during Refueling Operation,Fire Door 373 to Elevation 587 Vestibule Area Would Not Latch Properly.Caused by Barrel Retaining Ring in Contact W/Knob. Ring Adjusted & Set Screw Tightened + (ML20076F778)
- 05000260/LER-1983-043-03, /03L-0:on 830720,during Transient Operation, Following Control Rod Sequence Exchange,R Calculation Less than R Setpoint.Caused by Xenon Transient W/Operation Closer to Thermal Limits.Control Rods Repositioned + (ML20076F782)
- 05000302/LER-1983-029-03, /03L-0:on 830721 & 27,emergency Feedwater Ultrasonic Flow Indicator on Steam Generator B Inoperable. Caused by Electrical Malfunction in Transducers & Improperly Mounting Replacement Transducers,Respectively + (ML20076F784)
- ML20076F786 + (ML20076F786)
- 05000260/LER-1983-044-03, /03L-0:on 830712,during Performance of 4.2.B-26, Level Switches LS-73-56A & B Mfg by Robertshaw Failed to Operate Properly.Caused by Dirt in Mechanical Linkage. Switches Cleaned + (ML20076F787)
- ML20076F794 + (ML20076F794)