g' OPERATING DATA REPORT DOCKET NO.
50.-261 DATE 830602
~
COMPLETED llY.L_ Ray _N_ orris TELEPHONE (803) 383-4524 OPERATING STATUS i
!. Unit Name:
Robinson Unit 2 N tes There are presently 157
- 2. Reporting Period: -830501.0000/830531.2400
' spe nt fuel assemblies in the
- 3. Licensed Thermal Power (MWt):
2300 spent fuel pool.
- 4. Nameplate Rating (Gross MWe):
739.0
- 5. Design Electrical Rating (Net MWe):-
700.0
- 6. Maximum Dependable Capacity (Gross MWe):
700.0 665.0
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Througir 7) Since Last Report.Gise Reasons:
No change
- 9. Power Lesel To Which Restricted.lf Any (Net MWe):
1955 MWt reactor power
- 10. Reasons For Restrictions. lf Any:
Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.
This Month Yr. to Date Cumularis e
. II. Hours in Reporting Period 744.00 3623.00 107309.00
- 12. Number Of Hours Reactor Was Critical 102.20 2841.10 79680.87
- 13. Reactor Reserse Shutdown Hours 210.38 295.82 lbu3..w
- 14. Hours Generator On.Line 94.60 2738.12 77574.16
- 15. Unit Reserve Shutdown flours
.00
.00 23.20-
- 16. Gross Thermal Energy Generated (MWH) 148570.80 4770654.48 155535246.00
- 17. Gross Electrical Energy Generated (MWH) 46096'.00 1533867.00 50042630.00
- 18. Net Electrical Energy Generated (MWH) 36473.00 1432122.00 47304224.00
- 19. Unit Service Factor 12.72 75.58 72.29
- 20. Unii Arailability Factor 12.72 75.58
/z.a1-
- 21. Unit Capacity Factor (Using MDC Net) 7.37 59.44 66.2T
- 22. Unit Capacity Factor (Using DER Net) 7.00 56.47 62.9/
- 23. Unit Forced Outage Rate
.00 6.44 13.96
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachl:
None q
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
On Line
- 26. Units in Test Status (Prior to Commercis! Operation'):
Forecast Achiesed
. INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIA L OPER ATION r306140405 830602
~
PDR ADOCK 05000261 R
PDR pg th
AVERAGE DAILY UNIT POWER LEVEL 1
DOCKET NO.
50-261 UNIT Robinson #2 DATE _830602 COMPLETED BY
_H.
Ray Norris TELEPHONE (803) 383-4524 MONTH May DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -
(MWe Net)
(ywe.Neti 1
-8
-6 37,
2
-7 18
-6 3
-5
-6 39 4
-5
~lI 20 5
-4
-17 21 6
-3
-23 22 7
-4
-24 23 8
-7
-24
,4 9
-6
-2I 25 10
-3
-20 26 11
~4
-24 27 12
-7 18 2 28 13
-7 524 29 14
-7 546 30
-7 539 15 3g 16
-7 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) th
s UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-26I UNIT NAME H.
B. Robinson DATE 830602 COMPLETED BY H. Ray Norris REPORT MONTil Mav TELEPHONE (803) 383-4524 l
"i
~
.5=
e"
=
c.
.2 e E
,.s ::;
Lic.cnsee g't.,
c.
Cause & Corrective
- o No.
Date g
3g g
3g5 Event u7 h
Action to c$ E.
rE j di g Report #
(E U
]O Prevent Recurrence 6
m 0501 830501 S
649.40 B
1 HB HTEXCH Continuation of S/C Inspection Outage l
2 3
4 F: Forecd Reason:
Method:
Exhibit G - Ins' ructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report iLER) File (NUREG-D Regulatory Restriction 4-Other ( Explain) 0161)
E-Operator Trai.tir.g & License Examination F-Administrative 5
G-Operational Error (Explain)
EniW i Same Source 19/77) li-Other (Explain)
i
(
OPERATING DATA REPORT DOCKET NO.
50-261 DATE 830502 CO51PLETED BY H. Ray Norris TELEPHONE (803) 383-4524 OPERATING STATUS
- 1. Unit Name:
H.
B. Robinson Unit No. 2 N01'5
- 2. Reporting' Period: 830401.0000 / 830430.2400 There are presently 157 spent
- 3. Licensed Thermal Power (htWr):
2300 fuel assemblies in the spent
- 4. Nameplate Rating (Gross 51We):
739 fuel pool.
- 5. Design Electrical Rating (Net 51We):
700
- 6. hiaximum Dependable Capacity (Gross htWr):
700
- 7. hiaximum Dependable Capacity (Net 51We):
665
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Througir 7) Since Last Report.Gise Reasons:
No Chance
- 9. Power Level To kEch Restricted.lf Any (Net h!We):
1955 MWt reactor power.
- 10. Reasons For Restrictions.lf Any:
Although the un1t is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.
This Month Yr.-to-Dat e Cumulative
,11. Hours In Reporting Period 719.00 2879.00 106565.00
- 12. Number Of Hours Reactor Was Critical 627.94 2738.90 79578.67
- 13. Reactor Resene Shutdown Hours 50.01 85.44 1393.21
- 14. Hours Generator On.Line 550.26 2643.52 77479.56
- 15. Unit Resene Shutdown Hours
.00
.00 23.20
- 16. Gross Thermal Energy Generated (blWH) 943323.84 4622083.68 155386675.20
- 17. Gross Electrical Energy Generated (h!WH) 303127.00,_,
1487771.00
- 49996534.00
- 18. Net Electrical Energy Generated (MWH)
- 281050.00 1395647.00 47267749.00
- 19. Unit Senice Factor 76.53 91.82 72.71
- 20. Unit Availability Factor 76.53 91.82 72.73
- 21. Unit Capacity Factor (Using MDC Net) 58.78 72.90 66.70
- 22. Unit Capacity Factor (Using DER Net) 55.84 69.25 6J.J/
- 23. Unit Forced Outage Rate 18.13-6.66 13.98
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
May 20, 1983
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPERATION
- Revised by June, 1983 report.
W/77)
I
CD&L Carolina Power & Light Company H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JUN I 01983 Robinson File No:
15505 Serial: RESP /83-706 Mr. Richard C. DeYoung, Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission q
Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23
_ jwNTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Company herewith submits the report of operation statistics and shutdown experience for the month of May,1983.
In addition, a corrected copy of the April Operating Data Report is being submitted due to administrative errors in the gross and net electrical energy generated.
Very truly yours,
(
l/
R. B. Starkey,'Jr.
General Manager H. B. Robinson SEG Plant FMG/th Enclosure cc:
R. A. Hartfield (2)
J. P. O'Reilly (1) l
\\