- ML20072N264 + (ML20072N264)
- 05000250/LER-1983-009-03, /03L-0:on 830610,during Operability Test of Auxiliary Feedwater Pump A,Pump Failed to Come Up to Speed & No Flow Delivered.Caused by Failed Differential Pressure Transmitter.Transmitter Replaced + (ML20072N268)
- ML20072N270 + (ML20072N270)
- 05000389/LER-1983-027-03, /03L-0:on 830608,during Power Ascension Testing,W/ One High Radiation Containment Isolation Sys Channel in Bypass,Another High Radiation Channel Failed Low.Caused by Bistable Drifting low.W/83707 Ltr + (ML20072N273)
- ML20072N275 + (ML20072N275)
- ML20072N277 + (ML20072N277)
- 05000237/LER-1983-013, Forwards LER 83-013/03L-0 + (ML20072N280)
- 05000313/LER-1983-015-03, /03L-0:on 830616,while in Hot Shutdown After Reactor Trip,Hpi Control Valve CV-1219 Failed to Open on Demand from Control Room.Cause Not Determined.Operator & Switches Inspected & Switch Settings Checked + (ML20072N284)
- 05000339/LER-1983-021-03, /03L-0:on 830302,inservice Insp Visual Exam of Interior of Reactor Vessel Not Performed During First Refueling Outage Per ASME Xi.Caused by Personnel Error. Required Visual Exam Will Be Performed During 830401 Outage + (ML20072N286)
- ML20072N288 + (ML20072N288)
- ML20072N289 + (ML20072N289)
- AECM-83-0390, Updated RO 83-014/1:on 830301,fire-rated Penetration TE-14B (Elevation 113 Ft,Turbine Bldg) Opened to Install Raceway, Per Design Change Package.Hourly Fire Watch Established. Penetration Not Sealed within 7-day Time Limit + (ML20072N290)
- 05000321/LER-1983-020, Forwards LER 83-020/03L-0 + (ML20072N292)
- ML20072N293 + (ML20072N293)
- ML20072N298 + (ML20072N298)
- ML20072N305 + (ML20072N305)
- ML20072N311 + (ML20072N311)
- ML20072N317 + (ML20072N317)
- ML20072N324 + (ML20072N324)
- ML20072N327 + (ML20072N327)
- PY-CEI-NRR-1843, Forwards FFD Performance Rept for Jan-June 1994.Notifies That Unit 2,although on Hold from Active Const & Exempt from 10CFR26,has Been Encl by PA Boundary Since 900811 & Personnel W/Access to Pa,Subject to Unit 1 FFD Program + (ML20072N330)
- 05000321/LER-1983-020-03, /03L-0:on 830219,plant Personnel Noted That Turbine Overspeed Mechanical Trip Not Tripping within Requirements.Caused by Overspeed Trip Mechanism Being Out of Calibr.Trip Mechanism Recalibr + (ML20072N332)
- ML20072N333 + (ML20072N333)
- ML20072N334 + (ML20072N334)
- RC-94-0227, Semiannual Effluent & Waste Disposal Rept for Period of Jan-June 1994 + (ML20072N335)
- 05000296/LER-1983-015, Forwards LER 83-015/03L-0 + (ML20072N336)
- ML20072N337 + (ML20072N337)
- ML20072N339 + (ML20072N339)
- ML20072N342 + (ML20072N342)
- 05000237/LER-1983-013-03, /03L-0:on 830211,during Refueling,W/Weld Reinforcement in Progress Inside Torus,Power Lead from Rack of Welding Machine Grounded to Torus Causing Arc Strike & Copper/Brass to Fuse Into Metal.Repair Program Underway + (ML20072N343)
- TXX-4001, Interim Deficiency Rept Re Letdown HX Anchors.Initially Reported on 830506.Anchor Bolts Found Bound in End of Slotted Holes Prohibiting Movement.Mounting Configuration Revised + (ML20072N347)
- 05000354/LER-1994-011, :on 940801,reactor Scram Occurred During Surveillance Testing Due to Faulty Test Equipment.Maint Dept Administrative Procedures Will Be Revised to Assure That New Equipment Included within Program + (ML20072N350)
- ML20072N355 + (ML20072N355)
- HL-4664, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1994,as Required by 10CFR26.71(d) + (ML20072N359)
- 05000387/LER-1983-030, Forwards LER 83-030/03L-0 + (ML20072N360)
- 05000219/LER-1994-014, :on 940727,equalizing Valve on Sensor RE18-B Inadvertently Opened Due to Human Error.Equalizing Valve Sensor on RE18-B Closed & Instrument Line Excess Flow Check Valve Verified Open + (ML20072N362)
- 05000321/LER-1983-022, Forwards LER 83-022/03L-0 + (ML20072N375)
- 05000370/LER-1983-025-03, /03L-0:on 830605,digital Rod Position Indication for Control Bank C Rod F-6 Declared Inoperable Due to Ambiguous Indication That Rod Was at Both 228 & 204 Steps from Core Bottom.Caused by Failed Display Card + (ML20072N378)
- HL-4673, Responds to NRC Re Violation Noted in Insp Rept 50-366/94-15.Corrective Actions:Charcoal in a & B Mcrec Sys Filter Trains Replaced on 940617 & 14,respectively & Plant Sp 42SV-Z4109920OS Will Be Revised + (ML20072N380)
- LD-83-025, Submits Addl Info Re Natural Circulation Cooldown of C-E Sys 80 NSSS, Transmitted by Per SER Confirmatory Item 9.Analysis Shows Available condensate,300,000 Gallons, Provides More than Sufficient Cooling Water + (ML20072N387)
- ML20072N389 + (ML20072N389)
- 05000296/LER-1983-015-03, /03L-0:on 830225,during Monthly Vibration Tests on 480-volt Reactor Motor Operator Valve Board MG Sets,High Readings Detected on Coupling of 3EN Motor Generator Set. Caused by Damage from Wear During Operation + (ML20072N391)
- 05000454/LER-1994-007-06, :on 940801,during Rcfr Monthly Surveillance 1B Wide Range Hot Leg RTD Spiked Low.Caused by Splice at RTD Pigtail & Field Cable.Butt Splice Will Be Installed During Next Refueling Outage + (ML20072N392)
- ML20072N394 + (ML20072N394)
- ML20072N400 + (ML20072N400)
- ML20072N401 + (ML20072N401)
- 05000328/LER-1983-034, Forwards LER 83-034/03L-0 + (ML20072N403)
- TXX-3996, Responds to NRC Re Violations Noted in IE Insp Repts 50-445/83-18 & 50-446/83-12.Corrective Actions:Spec & Const Installation Procedures for Mechanical Equipment Revised & Reinsp Program Instituted + (ML20072N406)
- 05000387/LER-1983-030-03, /03L-0:on 830216,RHR Shutdown Cooling Lost Due to Div 1 Isolation Signal to Inboard Isolation Valve on Pump Suction.Caused by Spurious Tripping of Alternate Power Supply Breaker + (ML20072N410)
- ML20072N411 + (ML20072N411)
- BSEP-94-0295, Forwards Updated Info Re Bsep,Units 1 & 2 GL 89-10 Program & List of Regulatory Commitments + (ML20072N412)