Interim Significant Deficiency Rept 83-04 Re Unacceptable Bergen Paterson Welded Clevises on Pipe Rupture Restraints. Initially Reported on 830531.Program for Remfg of Clevises Implemented.Next Rept Will Be Submitted by 830720
ML20072N293
Person / Time
Site: Beaver Valley
Issue date: 06/29/1983
From: Woolever E
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, 2NRC-3-039, 2NRC-3-39, 83-04, 83-4, NUDOCS 8307150275
Download: ML20072N293 (4)


Text

- _ _ _ _ _ _.

J c,

$VL 2NRC-3-039 (412) 787 - 5141 Telecopy Nuclear Construction Division ne D, 1M Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 l

ATTENTION:

Dr. Thomas E. Murley Adminis trato r

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 l

Potential Deficiency in Bergen Paterson Welded Clevises l

Significant Deficiency Report No. 83-04 l

l Gentlemen:

This Interim Repo rt is the initial written repo rt on the ab ove s ubj ect.

Duquesne Light Company not ified the Region I Of fice on May 31, f

1983, that an evaluation of 10CFR50.55(e) reportability was underway.

P ursuant to the requirement s of 10CFR50.55(e), an interim report is hereby submitted.

A subsequent repo rt on this subject will be submitted to the Region I Of fice by July 20, 1983.

DUQUESNE LIGHT COMPANY By

  1. J'. Woolever Vice President KAT/wjs At tachment cc:

Mr. R. DeYoung, Director Of fice of Inspection and Enforcement (3) (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment)

Ms. L. Lazo, NRC Project Manager (w/ attachment)

Ntz:

NRC Document Control Desk (w/ attachment) omQ Nert 00 bb SUBSCRIBED AND SWORN TO BEFORE ME THIS U$

e&fl DAY OF Cu e 1983.

h J)

Y tL OS Not ary Public w<

N P:'TA ELAINE REITER, NOTARY PUBLIC O$

E $RSON TOWNSHIP, ALLEGHENY COUNTY b'"

ki COMMISSION EXPIRES OCTOBER 20,1986,

) I $

',d

2 United States Nuclear Regulatory Commission Dr. Thomas E. Murley page 2 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF-ALLEGHENY

)

On this A flI. day of h

/[/J, be fo re me,

a Notary Public in and for sai[ Commonwealth and County, pe rsonal ly appeared E.

J.

Woolever, who being duly sworn, deposed and said that (11 i

he is Vice President of Duquesne Light, (2) he is duly authorized to exe-cute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the be s t of his knowledge.

Not ary Public ANITA ELAINE CElTER, NOTARY PUBLIC ROSINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 3


2.

c-

J

_ United States Nuclear Rsgulatory Commission Mr. James Allen page 3

~c KAT/wjs At t achment l.

bec: R. Coupland (w/ attachment)

C. E. Ewing i

INPO Records Center T. J. Lex (4)

NCD File J. Pedro (NUS)

S. Phillips (W)

P. RaySircar T3)

J. Sutton (S&W) j K. A. Troxle r l

J. F. Zagorski C. R. Bishop (w/o attachment)

T. D. Jones H. M. Siegel R. J. Swiderski 4

REFERENCES:

Significant Deficiency Report No. 83-04 i

a s

e p

BEAVER VAL 12Y POWER STATION - UNIT NO. 2 DUQUESNE LICHT COMPANY J

l Interim Report No.1 on Potential Significant Deficiency 83-04 "Bergen Paterson Welded Clevises" T

i i

j 1.

DESCRIPTION OF DEFICIENCY Bergen Paterson, a sub-supplier to Applied Engineering Co. (APCO), used magnetic test methods fo r non-des truct ive examinations that were in conflict with those speci fied.

The welded clevises examined for weld acceptability and initially accepted by Bergen Paterson are not ac cep t-able for BVPS-2 application.

2.

AFFECTED COMPONENTS 1

The af fected components are clevises used on pipe rupture res traint s.

t 3.

PRELIMINARY SAFETY EVALUATION If the pipe rupture res traint s should fail after a pipe bresk, other safety related eq uipment within the vicinity of the ru ptur e could be damaged.

An engineering evaluation of the weld de ficiencies is c ont inuing.

4.

IMMEDIATE ACTION TAKEN, APCO issued a stop-work order to Bergen Paterson on May 5,1983.

The stop-work order has now been lif ted based on an acceptable program for the remanu facture of the c levises.

In order to assure conformance to specification, APCO has assigned a resident inspector to Bergen Pater-son, and DLC is pe rfo rming increased surveil lance at the vendo r 's d

plant, k

5.

ADDITIONAL REPORTS The results of the evaluation are expected to be available by mid-July.

l An additional report on this issue will be submitted by July 20, 1983.