ML20072N293
| ML20072N293 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 06/29/1983 |
| From: | Woolever E DUQUESNE LIGHT CO. |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 2NRC-3-039, 2NRC-3-39, 83-04, 83-4, NUDOCS 8307150275 | |
| Download: ML20072N293 (4) | |
Text
- _ _ _ _ _ _.
J c,
$VL 2NRC-3-039 (412) 787 - 5141 Telecopy Nuclear Construction Division ne D, 1M Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 l
ATTENTION:
Dr. Thomas E. Murley Adminis trato r
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 l
Potential Deficiency in Bergen Paterson Welded Clevises l
Significant Deficiency Report No. 83-04 l
l Gentlemen:
This Interim Repo rt is the initial written repo rt on the ab ove s ubj ect.
Duquesne Light Company not ified the Region I Of fice on May 31, f
1983, that an evaluation of 10CFR50.55(e) reportability was underway.
P ursuant to the requirement s of 10CFR50.55(e), an interim report is hereby submitted.
A subsequent repo rt on this subject will be submitted to the Region I Of fice by July 20, 1983.
DUQUESNE LIGHT COMPANY By
- J'. Woolever Vice President KAT/wjs At tachment cc:
Mr. R. DeYoung, Director Of fice of Inspection and Enforcement (3) (w/ attachment)
Mr. G. Walton, NRC Resident Inspector (w/ attachment)
Ms. L. Lazo, NRC Project Manager (w/ attachment)
Ntz:
NRC Document Control Desk (w/ attachment) omQ Nert 00 bb SUBSCRIBED AND SWORN TO BEFORE ME THIS U$
e&fl DAY OF Cu e 1983.
h J)
Y tL OS Not ary Public w<
N P:'TA ELAINE REITER, NOTARY PUBLIC O$
E $RSON TOWNSHIP, ALLEGHENY COUNTY b'"
ki COMMISSION EXPIRES OCTOBER 20,1986,
) I $
',d
2 United States Nuclear Regulatory Commission Dr. Thomas E. Murley page 2 COMMONWEALTH OF PENNSYLVANIA )
)
SS:
COUNTY OF-ALLEGHENY
)
On this A flI. day of h
/[/J, be fo re me,
a Notary Public in and for sai[ Commonwealth and County, pe rsonal ly appeared E.
J.
Woolever, who being duly sworn, deposed and said that (11 i
he is Vice President of Duquesne Light, (2) he is duly authorized to exe-cute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the be s t of his knowledge.
Not ary Public ANITA ELAINE CElTER, NOTARY PUBLIC ROSINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 3
2.
c-
J
_ United States Nuclear Rsgulatory Commission Mr. James Allen page 3
~c KAT/wjs At t achment l.
bec: R. Coupland (w/ attachment)
C. E. Ewing i
INPO Records Center T. J. Lex (4)
NCD File J. Pedro (NUS)
S. Phillips (W)
P. RaySircar T3)
J. Sutton (S&W) j K. A. Troxle r l
J. F. Zagorski C. R. Bishop (w/o attachment)
T. D. Jones H. M. Siegel R. J. Swiderski 4
REFERENCES:
Significant Deficiency Report No. 83-04 i
a s
e p
BEAVER VAL 12Y POWER STATION - UNIT NO. 2 DUQUESNE LICHT COMPANY J
l Interim Report No.1 on Potential Significant Deficiency 83-04 "Bergen Paterson Welded Clevises" T
i i
j 1.
DESCRIPTION OF DEFICIENCY Bergen Paterson, a sub-supplier to Applied Engineering Co. (APCO), used magnetic test methods fo r non-des truct ive examinations that were in conflict with those speci fied.
The welded clevises examined for weld acceptability and initially accepted by Bergen Paterson are not ac cep t-able for BVPS-2 application.
2.
AFFECTED COMPONENTS 1
The af fected components are clevises used on pipe rupture res traint s.
t 3.
PRELIMINARY SAFETY EVALUATION If the pipe rupture res traint s should fail after a pipe bresk, other safety related eq uipment within the vicinity of the ru ptur e could be damaged.
An engineering evaluation of the weld de ficiencies is c ont inuing.
4.
IMMEDIATE ACTION TAKEN, APCO issued a stop-work order to Bergen Paterson on May 5,1983.
The stop-work order has now been lif ted based on an acceptable program for the remanu facture of the c levises.
In order to assure conformance to specification, APCO has assigned a resident inspector to Bergen Pater-son, and DLC is pe rfo rming increased surveil lance at the vendo r 's d
- plant, k
5.
ADDITIONAL REPORTS The results of the evaluation are expected to be available by mid-July.
l An additional report on this issue will be submitted by July 20, 1983.