05000321/LER-1983-020, Forwards LER 83-020/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-020/03L-0
ML20072N292
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/17/1983
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072N296 List:
References
GM-83-211, NUDOCS 8304010499
Download: ML20072N292 (1)


LER-1983-020, Forwards LER 83-020/03L-0
Event date:
Report date:
3211983020R00 - NRC Website

text

_

Georgli Powtr Company Post Office Box 439 BIxtry, Georg's 31513 Telephone 912 367-7781 912 537-94 4 qpg pgg;qy.;

un
.. G CJi GIL

'h y All. l sl

"'"H*

March 17, 1983 GM-83-211 PLANT E.

I.

HATCH Licensee Event Report Docket No. 50-321 United States Nuclear P.egulatory Commission Office of Inspection and Enforcement Region II, Suite 3100 101 Marietta Street Atlanta, Georgia 30303 Attention:

Mr. James P. O'Reilly Pursuant to section 6.9.1.9.b. of Hatch Unit One Technical Specifications, please find attached Reportable Occurrence Report No. 50-321/1983-020.

6+3 fo,-

H.

C.ipix j

Gener#1 Manager HCN/SBT/abb xc:

R. J.

Kelly G. F.

Head J. T.

Beckham, Jr.

P.

D.

Rice K. M.

Gillespie S.

B.

Tipps R.

D.

Baker i,

Control Room Document Control t

8304010499 830317 OFFICIAL cdp /

PDR ADOCK 05000321 S

PDR

$6 AD