Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-19-0073, 2020 Fermi Retake Examination Letter NRC-19-0073 + (ML20069K476)
- 05000305/LER-1983-011-03, /03L-0:on 830319,turbine-driven Auxiliary Feedwater Pump Exceeded Surveillance Procedural Inservice Insp Bearing Temp Action Level & Valves AFW10A & AFW10B Failed to Close Fully.Caused by Restrictive Procedures + (ML20069K477)
- 05000339/LER-1982-063-03, /03L-0:on 820926,individual Rod Position Indication for Rod B-08 in Control Bank D Deviated from Group Demand Position by Greater than 12 Steps W/No Rod Motion.Caused by Instrument Drift.Instrument Recalibr + (ML20069K480)
- ML20069K482 + (ML20069K482)
- ML20069K483 + (ML20069K483)
- RBG-13-558, Final Deficiency Rept DR-46 Re Improperly Retained Rod End Bushings That May Disengage from Bergen Paterson Snubber & Sway Strut Assemblies. Initially Reported on 820426.Generic Part Number Changed on Bz Drawings for Riser Clamps + (ML20069K485)
- ML20069K486 + (ML20069K486)
- ML20069K491 + (ML20069K491)
- ML20069K494 + (ML20069K494)
- 05000373/LER-1983-025, Forwards LER 83-025/03L-0 + (ML20069K496)
- 05000373/LER-1983-022, Forwards LER 83-022/03L-0 + (ML20069K502)
- ML20069K506 + (ML20069K506)
- ML20069K507 + (ML20069K507)
- ML20069K508 + (ML20069K508)
- AECM-83-0246, Final Deficiency Rept PRD-83/03 Re Omitted Specified Insulation Wraps from GE Iac Overcurrent Relays.Initially Reported on 830217.Deficiency Not Reportable for Unit 1. Nonconforming Relay Replacement to Be Completed by 831015 + (ML20069K510)
- 05000373/LER-1982-108, Forwards LER 82-108/03L-0 + (ML20069K511)
- ML20069K513 + (ML20069K513)
- 05000373/LER-1982-108-03, /03L-0:on 820920,LIS-NB-187,ADS Accumulator Backup N2 Channel Functional & Calibr Discovered Not Performed as Specified by Tech Spec.Caused by Surveillance Procedure Not Entered Into Program.Procedure Revised + (ML20069K516)
- 05000373/LER-1983-025-03, /03L-0:on 830315,offgas Hydrogen Analyzer 1B Found Operating Incorrectly While Analyzer 1A Inoperable. Caused by Defective Timer & Defective Hydrogen Sensor, Respectively.Timer & Sensor Repaired + (ML20069K517)
- ML20069K523 + (ML20069K523)
- 05000373/LER-1983-022-03, /03L-0:on 830317,following Scram,Reactor Recirculation Pump Suction Temp Dropped in Excess of 100 F in 1 H.Caused by Delay in Recognizing That Water Input Was from Condensate Booster Pump.Procedure Written + (ML20069K526)
- 05000373/LER-1982-106, Forwards LER 82-106/03L-0 + (ML20069K530)
- ML20069K531 + (ML20069K531)
- ML20069K532 + (ML20069K532)
- 05000373/LER-1982-106-03, /03L-0:on 820920,during Performance of LOS-PC-Q1, Valve 1B33-F019 Did Not Close.Caused by Foreign Matl Blocking Valve Open.Outboard Isolation Valve 1B33-F020 Closed.Blockage Removed Prior to Work Initiation + (ML20069K536)
- ML20069K540 + (ML20069K540)
- ML20069K541 + (ML20069K541)
- ML20069K542 + (ML20069K542)
- ML20069K544 + (ML20069K544)
- ML20069K545 + (ML20069K545)
- ML20069K549 + (ML20069K549)
- ML20069K551 + (ML20069K551)
- ML20069K554 + (ML20069K554)
- ML20069K557 + (ML20069K557)
- A820019, Forwards Revisions to 820329 Relief Requests RP-02 & RP-04 Re Inservice Insp/Testing Requirements for Pumps & Valves + (ML20069K559)
- ML20069K561 + (ML20069K561)
- ML20069K563 + (ML20069K563)
- ML20069K566 + (ML20069K566)
- ML20069K568 + (ML20069K568)
- ML20069K569 + (ML20069K569)
- ML20069K575 + (ML20069K575)
- ML20069K577 + (ML20069K577)
- ML20069K580 + (ML20069K580)
- ML20069K581 + (ML20069K581)
- ML20069K584 + (ML20069K584)
- ML20069K586 + (ML20069K586)
- 2CAN038303, Responds to NRC Discussing Actions Planned on Recommendations Contained in INPO 830107 Rept Re Plant Safety Committee/Safety Review Committee Functions & Regulatory Response Program + (ML20069K589)
- ML20069K592 + (ML20069K592)
- ML20069K595 + (ML20069K595)
- ML20069K600 + (ML20069K600)
- ML20069K603 + (ML20069K603)