ML20069K545
| ML20069K545 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/21/1982 |
| From: | Eury L CAROLINA POWER & LIGHT CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20069K548 | List: |
| References | |
| NUDOCS 8210260323 | |
| Download: ML20069K545 (2) | |
Text
,
I 4
CD&L Carolina Power & Light Company OCT 211982 Office of Nuclear Reactor Regulation ATTN:
Mr. D. B. Vassallo, Otief Operating Reactors Branch No. 2 United States Nuclear Regulatory Commission Washington, D. C.
20555 BRUNSWICK SIEAM ELECIRIC PLANI, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 SUPPLEMENT TO REQUESE FOR LICENSE AMENDHENT HYDRAULIC SNUBBER SURVEILLANCE
Dear Mr. Vassallo:
Summary In accordance with the Code of Federal Regulations, Title 10, Part 50.90 and Part 2.101, Carolina Power & Light Company (CP&L) hereby requests revisions to the Technical Specifications (TS) for its Brunswick Steam Electric Plant (BSEP), Unit Nos. I and 2.
These changes are to clarify portions of our May 21, 1981 submittal regarding hydraulic snubbers.
Discussion Our May 21, 1981 submittal reflected our preference to retain the flexibility to assign a numerical value to "c" prior to each functional test.
In subsequent discussions with NRC, it was concluded that a clarification to the May 21, 1981 submittal would be advisable. Therefore, we are revising our previous submittal to include the formal notification of the Regional Administrator, USNRC, Region II prior to performance of a snubber functional test if the value of "c" is to be revised from the value used in the previous test.
Administrative Information Enclosed you will find the revised TS pages with the changes indicated by vertical lines in the right-hand margins. The attached pages supersede the identically numbered pages in our May 21, 1981 submittal.
N D
B210260323 821021 4
PDR ADOCK 05000324
}
1 P
PDR 411 Fayetteville Street
- P. O. Box 1551
- Tse.eigh, N. C. 27602
rn s
t Since this letter supplements a previous submittal, CP&L has determined that no additional license amendment application fee is required.
If you have any questions concerning this natter, please contact us.
Yours very truly, 10 L. W. Eury Senior Vice President Power Supply CEH/1r (5140CITI)
Enclosure cc:
Mr. D. O. Myers (NRC-BSEP)
Mr. J. P. O'Reilly (NRC-RII)
Mr. J. A. Van Vliet (NRC)
L. W. Eury, having been first duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.
Y
./fNf7f My commission expires: OCT 041986
.y lsOTARy)
}
5i UBLIC [
5 O
.. g
- .......**,,4 ColgC '
'sier,,,,io d o I
l l
l m