Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065M710 + (ML20065M710)
- 05000416/LER-1990-023, :on 901105,shutdown Cooling Isolation Occurred Due to Blown Fuse + (ML20065M711)
- ML20065M716 + (ML20065M716)
- ML20065M718 + (ML20065M718)
- ML20065M719 + (ML20065M719)
- ML20065M720 + (ML20065M720)
- ML20065M721 + (ML20065M721)
- ML20065M724 + (ML20065M724)
- ML20065M728 + (ML20065M728)
- ML20065M729 + (ML20065M729)
- ML20065M736 + (ML20065M736)
- ML20065M738 + (ML20065M738)
- 05000341/LER-1993-015, On 931226,valve B3105-F031B, B Loop Pump Discharge Valve,Failed to Fully Close.Caused by Broken Wires in Valve Yoke.Wiring Replaced + (ML20065M740)
- ML20065M746 + (ML20065M746)
- ML20065M748 + (ML20065M748)
- ML20065M750 + (ML20065M750)
- ML20065M755 + (ML20065M755)
- ML20065M765 + (ML20065M765)
- ML20065M768 + (ML20065M768)
- ML20065M772 + (ML20065M772)
- RBG-40512, Provides Response to Suppl 1 of NRC Bulletin 93-002, Debris Plugging of Emergency Core Cooling Suction Strainers + (ML20065M779)
- ML20065M781 + (ML20065M781)
- 05000269/LER-1993-010, :on 931103,manual Reactor Trip at 13% Full Power Was Initiated at 0100 Hours After Plant Transient. Caused by Equipment Failure.Corrective Actions:Repairing Wires & Cleaning Test Solenoid Valves + (ML20065M786)
- ML20065M795 + (ML20065M795)
- ML20065M797 + (ML20065M797)
- ML20065M798 + (ML20065M798)
- ML20065M802 + (ML20065M802)
- ML20065M803 + (ML20065M803)
- ML20065M805 + (ML20065M805)
- ML20065M809 + (ML20065M809)
- 3F1290-02, Responds to NRC Re Violations Noted in Insp Rept 50-302/90-32.Corrective actions:DHV-43 Manually Seated Using Handwheel + (ML20065M816)
- ML20065M821 + (ML20065M821)
- 05000387/LER-1982-016, Reissued LER 82-016/01T-1:on 820920,mechanical Vacuum Pump Left in Svc After Ventilation Monitoring Sys Noble Gas Monitor Became Inoperable on 820918.Caused by Operator Not Noting All Parts of Applicable Action Statements + (ML20065M822)
- ML20065M826 + (ML20065M826)
- ML20065M828 + (ML20065M828)
- 05000354/LER-1990-025-02, :on 901104,discovered Recirculation Sys Instrument Line Crack.Caused by vibration-induced Fatigue + (ML20065M831)
- 05000354/LER-1990-024-02, :on 901104,discovered Reactor Scram on High Average Power Range Monitor Flux Levels Due to Broken Gas Line + (ML20065M833)
- 05000387/LER-1982-021, Forwards LER 82-021/03L-0 + (ML20065M835)
- ML20065M836 + (ML20065M836)
- 05000387/LER-1982-021-03, /03L:on 820910,while Performing Surveillance of Rod Worth Minimizer,Selection Error Indicating Light Did Not Operate Properly.Caused by One 28-volt Conductor Being Pulled Loose from Light Assembly Due to Stress + (ML20065M843)
- 05000324/LER-1990-011, :on 900830,RWCU Sys Manually Isolated Following Receipt of RWCU Leak Hi & hi-hi Annunciators + (ML20065M853)
- ML20065M854 + (ML20065M854)
- ML20065M856 + (ML20065M856)
- ML20065M857 + (ML20065M857)
- 05000483/LER-1990-014, :on 901106,RPS Actuation & ESF Feedwater Isolation Signal Initiated Due to I&C Technician Inadvertently Grounding SB038 Protection Set I Cabinet Secondary Power Supply + (ML20065M858)
- ML20065M860 + (ML20065M860)
- ML20065M862 + (ML20065M862)
- ML20065M865 + (ML20065M865)
- RBG-34103, Responds to NRC Re Deviations Noted in Insp Rept 50-458/90-26 on 900905-1016.Weekly Electrical Maint Foreman Patrols Will Resume Following Refueling Outage 3 & Hot Line Will Be Set Up to Rept Poor Lighting Problems + (ML20065M866)
- ML20065M868 + (ML20065M868)
- ML20065M876 + (ML20065M876)