Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059C794 + (ML20059C794)
- ML20059C795 + (ML20059C795)
- ML20059C796 + (ML20059C796)
- ML20059C797 + (ML20059C797)
- ML20059C798 + (ML20059C798)
- ML20059C799 + (ML20059C799)
- ML20059C800 + (ML20059C800)
- ML20059C801 + (ML20059C801)
- BECO-93-137, Forwards Third Rept on Status of Efforts to Establish Replacement Facility for Wellesley Reception Ctr + (ML20059C803)
- 05000213/LER-1990-011, :on 900802,determined Potential for Loss of Sump Recirculation Due to Bus Undervoltage.Caused by Deficiency in Technical & Safety Review Process for Eops. Bus Undervoltage Setpoints Will Be Lowered + (ML20059C804)
- ML20059C806 + (ML20059C806)
- 05000344/LER-1990-006, :on 900221,both Trains of ECCS Inoperable During Mode 3 Surveillance Testing.Caused by Inadequate Technical & Safety Review Rev.Test Will Be Reviewed & Revised + (ML20059C807)
- ML20059C808 + (ML20059C808)
- ML20059C810 + (ML20059C810)
- ML20059C811 + (ML20059C811)
- RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range + (ML20059C814)
- ML20059C815 + (ML20059C815)
- ML20059C818 + (ML20059C818)
- ML20059C820 + (ML20059C820)
- ML20059C821 + (ML20059C821)
- ML20059C822 + (ML20059C822)
- ML20059C823 + (ML20059C823)
- IR 05000271/1993026 + (ML20059C825)
- ML20059C826 + (ML20059C826)
- ML20059C827 + (ML20059C827)
- IR 05000245/1990011 + (ML20059C829)
- ML20059C830 + (ML20059C830)
- ML20059C831 + (ML20059C831)
- ML20059C832 + (ML20059C832)
- ML20059C833 + (ML20059C833)
- ML20059C834 + (ML20059C834)
- NLS9000369, Forwards Endorsement 80 to Maelu Policy MF-70 & Endorsement 96 to Nelia Policy NF-200,reflecting Shutdown Credit for Most Recent Outage for Nuclear Liability Insurance for Plant + (ML20059C835)
- IR 05000498/1993030 + (ML20059C837)
- 05000213/LER-1990-012, :on 900802,charging Pump a Declared Inoperable When Determined That Pump Potentially Gas Bound.Cause Unknown.Operating Procedures Reviewed to Determine Adequacy to Prevent Gas Binding of Pumps + (ML20059C838)
- ML20059C839 + (ML20059C839)
- ML20059C841 + (ML20059C841)
- 05000322/LER-1990-005, :on 900418,noted That on 791205,830808,851218, 861201,870703 & 890119 & 0510,conductor Failures Occurred. Caused by Loss or Reduction of Insulation Resistance or Loss of Continuity for Conductors in Assemblies + (ML20059C842)
- ML20059C843 + (ML20059C843)
- PY-CEI-NRR-1216, Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept + (ML20059C844)
- ML20059C845 + (ML20059C845)
- ML20059C846 + (ML20059C846)
- ML20059C849 + (ML20059C849)
- 05000341/LER-1989-038, :on 891223,smoke Discovered in Vicinity of High Pressure Turbine & Reactor Manually Scrammed.Caused by Oil Soaked Lagging Pads Which Ignited When Oil Flash Point Reached.Damaged Insulation Pads Replaced + (ML20059C850)
- ML20059C851 + (ML20059C851)
- 05000370/LER-1993-007-03, :on 930927,unit 2 Shutdown Due to Unindentified RCS Leakage Greater than TS Limits Due to Equipment Failure. Implemented Leakage Calculation & Procedure + (ML20059C852)
- ML20059C853 + (ML20059C853)
- ML20059C857 + (ML20059C857)
- IR 05000275/1992017 + (ML20059C858)
- 05000298/LER-1990-009, :on 900808,RCIC Inoperable Due to Failure of motor-operated Steam Supply Valve.Caused by Hydraulic Lock Condition in Spring Pack.Motor Replaced & Spring Pack Cleaned + (ML20059C859)
- ML20059C860 + (ML20059C860)
- 0CAN089006, Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual + (ML20059C862)