Discusses 931022 Telcon W/Licensee Re Arrangements for Licensing Exams at Plant During Wk of 940228.Licensee Should Submit Preliminary Reactor & SRO License Applications & Waiver Requests 30 Days Before Exam
ML20059C834
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/28/1993
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9311020031
Download: ML20059C834 (4)


Text

'

Dc5 N

f 00T 28 E03 Docket No. 50-423 j

Mr. John F. Opeka Executive Vice President - Nuclear Northeast Nuclear Encrgy Company P. O. Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS - MILLSTONE UNIT 3 In a telephone conversation on October 22,1993, between Mr. P. Bissett and Mr. B. Parish, arrangements were made for the administration of licensing examinations at the Millstone Unit 3 facility.

The written examinations and operating tests are scheduled for the week of February 28,1994. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NUREG-1021, " Operator Licensing Exarniner Standards," ES-201, Attachment 4, during the week of November 29,1993.

f To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by-December 20,1993. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary.

for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final OFFICIAL RECORD COPY G:MS3228.94 01000 dg '

U 9a110200a1 va202s

-PDR ADOCK 05000423

.\\

V PDR

i Mr. John F. Opeka 2

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit preliminary reactor and senior reactor operator license applications.

and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

l This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31,1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this matter. Mr. Parish has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the evaluation process, please contact me at (215) 337-5211.

Sincerely, Original Signed By:

Glenn W Meyer 4

Glenn W. Meyer, Chief PWR Section Operations Branch Division of Reactor Safety OFFICIAL RECORD COPY G:MS3228.94

E a

l Mr. John F. Opeka 3

00T L 'i ijjj cc:

W. D, Romberg, Vice President - Nuclear Operations Services j

J. P. Stet 2, Vice President, Haddam Neck Plant i

F. R. Dacimo, Nuclear Unit Director R. M. Kacich, Director, Nuclear Licensing

-i J. Solymossy, Director, Nuclear Quality and Assessment Services S. E. Scace, Vice President, Millstone Station R. Stotts, Supervisor - Operator Training Gerald Garfield, Esquire Nicholas Reynolds, Esquire NRC Senior Resident Inspector Public Document Room (PDR)

I_ocal Public Document Room (LPD";

Nuclear Safety Information Center (NSIC)

State of Connecticut bec:

Region I Docket Room (w/ concurrences)

P. Bissett, DRS OL Facility File

. DRS File bec (VIA FeMAIL):

V. McCree, OEDO V. Rooney, PM, NRR J. Stolz, NRR/PDI-4 R. Gallo, Chief, OLB, NRR OFFICIAL RECORD COPY G:MS3228.94 l

6 6

4 s

O Mr. John F. Opeka 4

007 2 8 1993

- NOTIFY VIA E-MAIL AND NO FILE L. Bettenhausen, DRS

~ R. Conte, DRS G. Meyer, DRS P. Bissett, DRS

'I J

'i i

RI:DRSI RI:DRS Bissett/dmg Meyer 10/25/93 10/t193 OFFICIAL RECORD COPY G:MS3228.94