Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059C507 + (ML20059C507)
- ML20059C508 + (ML20059C508)
- ML20059C514 + (ML20059C514)
- ML20059C519 + (ML20059C519)
- 05000313/LER-1993-004-02, :on 931004,red Train Volt Engineered Safeguards Bus & Volt Load Ctr Unintentionally de-energized.Caused by Procedural Deficiency.Procedure Revised + (ML20059C523)
- ML20059C526 + (ML20059C526)
- ML20059C529 + (ML20059C529)
- ML20059C534 + (ML20059C534)
- RC-93-0266, Forwards Amend 32 to Physical Security Plan & Rev 7 of Safeguards Contingency Plan,Per 10CFR50.54(p).Plan Withheld, Per 10CFR73.21 + (ML20059C535)
- ML20059C536 + (ML20059C536)
- ML20059C537 + (ML20059C537)
- ML20059C540 + (ML20059C540)
- ML20059C542 + (ML20059C542)
- ML20059C544 + (ML20059C544)
- ML20059C547 + (ML20059C547)
- ML20059C548 + (ML20059C548)
- 2CAN109306, Documents Completion of Actions Associated W/Nrc Bulletin 88-011 to Ensure Pressurizer Surge Line Has Not Experienced Thermal Stresses Beyond Code Allowable Values Due to Thermal Stratification + (ML20059C550)
- ML20059C552 + (ML20059C552)
- 05000482/LER-1990-017, :on 900729,determined That Portion of Contents of Waste Gas Decay Tank 3 Discharged to Radwaste Bldg HVAC, Resulting in Tech Spec Violation.Caused by Procedural Inadequacy.Work Request Initiated + (ML20059C554)
- ML20059C559 + (ML20059C559)
- ML20059C562 + (ML20059C562)
- ML20059C564 + (ML20059C564)
- ML20059C569 + (ML20059C569)
- ML20059C574 + (ML20059C574)
- ML20059C576 + (ML20059C576)
- ML20059C579 + (ML20059C579)
- ML20059C584 + (ML20059C584)
- 05000333/LER-1993-020-01, :on 930924,reactor High Pressure Scram Occurred Due to Partial Closure of Turbine Bypass Valve.Isolated & Corrected Bus Grounds + (ML20059C586)
- ML20059C589 + (ML20059C589)
- 05000309/LER-1990-005, :on 900725,improper Switch Alignment Rendered Functional Units Inoperable Due to Switch Mispositioning. Caused by Personnel Oversight During Maint.Calorimetric Adjustment Performed to Ensure Proper Output + (ML20059C590)
- ML20059C593 + (ML20059C593)
- DD-93-23, Directors Decision DD-93-23 Re M Daley & J M Block Requesting Per 10CFR2.206,that NRC Reconsider Civil Penalty Assessed Against Vynp for Operating Station Outside TS from 921015-930406.Request Denied + (ML20059C594)
- ML20059C595 + (ML20059C595)
- 05000219/LER-1990-011, :on 900723,unqualified Operators on Shift Due to Programmatic Inadequacies in Exam Process.Operators Involved Removed Immediately from Licensed Duty & Placed in Accelerated Requalification Program + (ML20059C596)
- ML20059C597 + (ML20059C597)
- ML20059C600 + (ML20059C600)
- ML20059C602 + (ML20059C602)
- ML20059C604 + (ML20059C604)
- ML20059C607 + (ML20059C607)
- ML20059C608 + (ML20059C608)
- ML20059C609 + (ML20059C609)
- ML20059C611 + (ML20059C611)
- ML20059C613 + (ML20059C613)
- ML20059C615 + (ML20059C615)
- ML20059C616 + (ML20059C616)
- ML20059C617 + (ML20059C617)
- ML20059C622 + (ML20059C622)
- ML20059C623 + (ML20059C623)
- IR 05000155/1990015 + (ML20059C625)
- ML20059C626 + (ML20059C626)
- ML20059C629 + (ML20059C629)