Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20056E152 + (ML20056E152)
- ML20056E155 + (ML20056E155)
- ML20056E156 + (ML20056E156)
- ML20056E159 + (ML20056E159)
- ML20056E160 + (ML20056E160)
- ML20056E161 + (ML20056E161)
- ML20056E162 + (ML20056E162)
- ML20056E165 + (ML20056E165)
- ML20056E166 + (ML20056E166)
- ML20056E167 + (ML20056E167)
- ML20056E168 + (ML20056E168)
- ML20056E169 + (ML20056E169)
- ML20056E170 + (ML20056E170)
- BECO-93-102, Forwards Final Pilgrim Nuclear Power Station Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept, for 930519 + (ML20056E172)
- 3F0893-09, Proposes to Change Conditions for Entry Into Site Area Emergency Under EAL for Natural Phenomena,Hurricane Warning, as Outlined in Encl,As Result of Review of Hurricane Preparedness + (ML20056E174)
- ET-NRC-93-3944, Forwards Proprietary Drawings,Providing Details of Steam Distributor Assembly Being Used in AP600 Core Makeup Tank Test Facility.Drawings Withheld (Ref 10CFR2.790)). Proprietary Portion of Document Sent to Westinghouse + (ML20056E176)
- ML20056E179 + (ML20056E179)
- ML20056E180 + (ML20056E180)
- ML20056E181 + (ML20056E181)
- ML20056E182 + (ML20056E182)
- ML20056E184 + (ML20056E184)
- ML20056E185 + (ML20056E185)
- ML20056E186 + (ML20056E186)
- ML20056E188 + (ML20056E188)
- ET-NRC-93-3945, Forwards Nonproprietary & Proprietary Refs for Basic Research Tests on Condensation Performed at Univ of Wi at Madison in Support of AP600 Design.Affidavit for Withholding Encl.Proprietary Portion of Document Sent to Westinghouse + (ML20056E189)
- ML20056E192 + (ML20056E192)
- ML20056E193 + (ML20056E193)
- ML20056E195 + (ML20056E195)
- B14581, Provides Staff W/Info Re Results of Recent Internal Audit Conducted on Unit 1 Svc Water Sys,W/Regard to Discrepancy Noted Re Util Response to GL 89-13 W/Respect to Listed Statement + (ML20056E196)
- ML20056E197 + (ML20056E197)
- ML20056E199 + (ML20056E199)
- ML20056E200 + (ML20056E200)
- ML20056E201 + (ML20056E201)
- ML20056E202 + (ML20056E202)
- ML20056E203 + (ML20056E203)
- ML20056E204 + (ML20056E204)
- ML20056E205 + (ML20056E205)
- 2CAN089302, Forwards Info to Support 930715 SG Meeting W/Nrc to Discuss Eddy Current Methodologies Used at Facility + (ML20056E206)
- HL-3424, Responds to NRC Re Violation Noted in Insp Repts 50-321/93-11 & 50-366/93-11.Corrective Actions:Calibr Procedure 57CP-CAL-041-1S Temporarily Revised & Calib Procedure 57CP-T46-002-2S Reviewed + (ML20056E211)
- ML20056E212 + (ML20056E212)
- ML20056E213 + (ML20056E213)
- IR 05000387/2020010 + (ML20056E215)
- ML20056E216 + (ML20056E216)
- ML20056E217 + (ML20056E217)
- 05000499/LER-1993-013-01, :on 930719,Train B CCW Pump 2B Received Automatic Actuation Signal from non-nuclear Supply Header Low Pressure Signal Due to Less than Adequate Plant Impact review.M0V-0236 Repaired + (ML20056E219)
- ML20056E220 + (ML20056E220)
- ML20056E222 + (ML20056E222)
- ML20056E223 + (ML20056E223)
- B14569, Revised Pages to Rev 5 to Inservice Testing Program, Millstone Nuclear Power Station Unit 1 + (ML20056E225)
- ML20056E226 + (ML20056E226)
- BECO-93-099, Forwards ISI Repts Conducted During Mid-Cycle Outage 9 & Refueling Outage 9.Repts Encompass Time Period of Oct 1992 & May 1993 + (ML20056E227)