Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044H542 + (ML20044H542)
- ML20044H543 + (ML20044H543)
- ML20044H545 + (ML20044H545)
- ML20044H547 + (ML20044H547)
- ML20044H549 + (ML20044H549)
- ML20044H550 + (ML20044H550)
- ML20044H551 + (ML20044H551)
- ML20044H553 + (ML20044H553)
- ML20044H556 + (ML20044H556)
- ML20044H557 + (ML20044H557)
- ML20044H560 + (ML20044H560)
- ML20044H561 + (ML20044H561)
- ML20044H562 + (ML20044H562)
- ML20044H564 + (ML20044H564)
- ML20044H565 + (ML20044H565)
- ML20045A000 + (ML20045A000)
- ML20045A003 + (ML20045A003)
- ML20045A004 + (ML20045A004)
- ML20045A005 + (ML20045A005)
- ML20045A011 + (ML20045A011)
- ML20045A013 + (ML20045A013)
- ML20045A014 + (ML20045A014)
- ML20045A016 + (ML20045A016)
- ML20045A020 + (ML20045A020)
- ML20045A025 + (ML20045A025)
- ML20045A026 + (ML20045A026)
- 05000289/LER-1993-004, :on 930503,plant Process Computer Malfunction Event Occurred Due to Suspected Hardware Problem.Cause of Malfunction Not Revealed.Computer Sys Software Change Has Been Implemented + (ML20045A027)
- ML20045A028 + (ML20045A028)
- B14481, Forwards Proposed Rev 16 to Northeast Utilities QA Program Topical Rept for Review & Approval.Proposed Rev 16 Will Be Issued & Dtd Same as NRC Approval Date When Received or within 60 Days + (ML20045A030)
- ML20045A033 + (ML20045A033)
- ML20045A034 + (ML20045A034)
- ML20045A050 + (ML20045A050)
- ML20045A053 + (ML20045A053)
- ML20045A055 + (ML20045A055)
- ML20045A060 + (ML20045A060)
- ML20045A061 + (ML20045A061)
- 3F0593-12, Responds to NRC Info Notice 93-017, Safety Sys Response to Loss of Coolant Power. Util Will Take No Further Action on Notice Based on Listed Rationale.Notice Should Be Withdrawn Until Appropriate Review by CRGR Initiated & Completed + (ML20045A065)
- IR 05000382/1993012 + (ML20045A066)
- ML20045A068 + (ML20045A068)
- ML20045A071 + (ML20045A071)
- ML20045A072 + (ML20045A072)
- ML20045A079 + (ML20045A079)
- 3F0693-03, Forwards Inservice Insp Relief Request 93-010 from Volumetric or Surface Exam of 10% of Peripheral Control Rod Drive Housing Welds.All Six CRD Mechanism Housings Will Be Inspected at or Near End of Second 10-yr Interval + (ML20045A080)
- ML20045A091 + (ML20045A091)
- L-93-098, Forwards Rev 6 to Safeguards Contingency Plan,Changing Organizational Relationships,Updating Communications Sys & Response Resource Commitments.Rev Withheld (Ref 10CFR73.21) + (ML20045A105)
- ET-NRC-93-3881, Forwards Proprietary Presentation Matls Used During 930526-27 Meeting in Monroeville,Pa to Discuss AP600 Automatic Depressurization Sys Tests.Affidavit for Withholding Encl.Rept Withheld,Per 10CFR2.790 + (ML20045A111)
- ML20045A114 + (ML20045A114)
- 05000245/LER-1993-005-01, :on 930429,hydraulic Snubber HSS-039 Identifed W/Unacceptable End Attachment to Recirculation Pump Motor Due to Missing Cotter Pin.Snubber Replaced W/Rebuilt Spare & Load Pin Installed Correctly + (ML20045A115)
- ML20045A118 + (ML20045A118)
- ML20045A127 + (ML20045A127)
- 05000458/LER-1993-009, :on 930504,discovered That Surveillance Test Procedure for Control Bldg Chilled Water Sys Quarterly Pump Missed Due to Cognitive Personnel Error.Administrative Procedure Will Be Revised + (ML20045A146)