ML20044H553
| ML20044H553 | |
| Person / Time | |
|---|---|
| Issue date: | 05/19/1993 |
| From: | Chatten R, Michael Scott NRC OFFICE OF ADMINISTRATION (ADM), SOUTHWEST RESEARCH INSTITUTE |
| To: | |
| References | |
| CON-FIN-D-1035, CON-NRC-02-88-005, CON-NRC-2-88-5 NUDOCS 9306090201 | |
| Download: ML20044H553 (2) | |
Text
~a P
,U T%
3.coNIMACT 40 COOc 6'AGL * * * ' ~ "
- AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRAC
/
1 11 s.eaoacci no,pfy,
a.a sje ecuvc og$
e.ncavisenorwuacaAse nea.eu).
pucuouunfuooie-icAuon tu;.
@'Y 19 WJ ADMIN. RFPA datod a /9A /n1 61
- 7. ADMINtS1LHLO OY C(edwrhen Jkm 6)
E eS50co UY gl (J.S. Nuclear Regulatory Commission
' Division of Contracts & Property Management Washington, DC 20SSS e sa. AucnoucNT oe souciTAnon na, tcuAuc ano tooacss or con 1RAcion ca euws.mer.suu.a w cues
,o.oATeo ssus nur a ss Southwest Research Institute 6220,Culebra!# Road loa.uooiencAnou or couYaAcT,Onoca San Antonio, TX 78228-0510 NO.
Principal Investigator /Iecimical X
NRC-02-88-005
Contact:
Wesley C. Patrick. President. CNWRA
- $O^
- 8"88"'381 Telonhnrm_ No. (210) 522-5154 10/1 Ei/87 IFActt.lTY CODE 11.THIS (TEM ONLY APPLIESTO AMENOMENTSOF sot lCf7ATIONS O
'cooE b Theebow numbenaf sotkftstionisamended,assetsorihin tten 14. the houra swlor ta the hour and date spectGod in she soGdtstion or as amended.ty one of th eended.
- enendicopyof dieoffor offersumastadmowledgemoelptof this T:"
- aata= of the e M t;thi By acknowledoinsveceiptof this FYOURAC8:NOWLEDG.
conqpledag itemis 8 and 05,and retuming _er 64 ey emeraer seteer er telegram which Indudes a ve6e sAtytt10 BE RECEt'dD ATTHE PtACE DEstGNATED fDR THE f 1XY.tFTOF OfVERS (el t
adetsytelegresaer IN ftEJEC110N OF YOUR OrfER. If by 14rtse of this emendaientwsdedre tocfierge eneflereinsedysub seteor. ".h each esseerem or letter snakes swieronos to the SAM *. a and this emendm o
12 M9MJNT4NG ANQ AftROPR&A160N DAT A (If eredr'.)
N/A
- 13. Tuts (TEM APPU ES ON1.Y TO MODIFICATIONS OF CONTRACT 3A)ROERS, (T MODIFIES THE CONTR3(T/ ORDER NO. AS DESCRIBED IN ITEM 14.
1HC COS N, A. THis CHANGE ORDE H &S 45$UCD PUR$UANT TOs ('9W/serner4rj THC CHANGES SCT FORT TRACT ORDER NO. $N (TEM 10A.
Metd W ase;-spO ofDee.
S.THE ABOYC NUW8CRCO CONTRACTtOROCR 45 MOOfFtED TO REFLCCT THE
& deae,eseJ SCT FORTM (N 8TLM 14.PUSt&UANT TO THC AUTHORITY OF FAR 43.103(tr).
i X
C.TNts SUfvt.KutN1 AL. AGRCLMENT 15 CNTtiRED BNTO PUR50 ANT TO AUTHOR 4TY Of s o.ouscR esreestr ora et -amcauan ea =uswurs X
Section G.1, Overhead /G&A Rates 2
coge.ioineasuinaO<< ice.
Oi,enoi,Dato.ioriitasoocu<neotorxs,. torn E.IMPORTANT: Cce+~ O a not.n ot.scReevoH or AutNouuntuoowscATu>
See attached page.
}
i 9306090201 930519 PDR CONTR
)
Q satua socce NRC-02-Og-OO5 ppg ggerovisea seu,en seems andpaditions et the coaement nunaced sa tem sA'w aoA 7
N 16A.f4AMC AND TdTLEof $tGNLR ypt orpriaO rt E.
. ten Marv tvnn c#ntt_ Cnntrnetinn Offinne16C. OAT 4 54GNCS
_DitMtor,_ Cont C+ C a 5C. DATE 58GNCO 168.Ut4'l LO ST AI LS OF~ AMERICA A
kM -
APR 2
- 1993
^ w cos ++ 7 a/9f~ kop
/
s9 SA/
19 bby 93 ey
~
<maur - e <>.<~ca a ort w o mr-s-ty.s ya s ess,
STANDARD rjnfA 30 (REY.10-e3)30-105
'****"*'a
1
.e Contract No. NRC-02-88-005
,p Modification No. 61 Page 2
- 4 The purpose of this modification is to 1) revise the NRC Program Element Manager for CNWRA Operations, 2) to incorporate the FY93/94 MRS Operations Plan and reflect the current approved version of the WSS Operations Plan, and
- 3) revise the Fringe Benefit Rate.
Accordingly, the following changes are hereby incorporated:
1.
Revise Section G.3.1.C to delete the name "Willard B. Brown" and insert
" Shirley Fortuna" as NRC Program Element Manager for CNWRA Operations effective April 30, 1993.
2.
C.3 is revised to incorporate the FY93/94 MRS Operations Plan and reflect the current approved version of the WSS Operations Plan:
"CNWRA FY93/94 Operations Plan for Monitored Retrievable Storage Revision 1, Change 2.
CNWRA FY93/94 operations Plan for WSS Revision 2, Change 2."
3.
Revise the Fringe Benefit rates in Paragraph A of Section G 1 to read as follows:
" Category Rate Cost Base Applicable Period Fringe Benefits 39%
direct labor 10/15/87-9/30/88 41%
direct labor 10/15/88-4/13/90 42%
direct labor 4/14/90-3/3/92 42.7%
direct labor 3/4/92-9/30/92 43.7%
direct labor 10/1/92-until revised" All other terms and conditions of this contract, including the ceiling amount for the renewal period of $89,898.141, remain the same.
A summary of obligations for the renewal period of this contract is given below:
" Fin D1035 (HLW)
Total FY92 obligation amount $1,640,300 Total FY93 obligation amount $8,000,000 Cumulative Total of NRC Obligations for Fin 1035 $9,640,300.
Fin L1590 (LSS)
Total FY92 obligation amount $50,000.
Cumulative Total of NRC Obligations for Fin L1590 $50,000.
Fin L1793 (WSS)
Total FY93 obligation amount $60,000.
Cumulative Total of NRC Obligations for Fin Ll793 $60,000.
Fin B6666 (Research)
Total FY93 obligation amount $3,610,000 Cumulativo Total of NRC Obligations for Fin B6666 $3,610,000.
Ti is modification does not obligate new f inds.
j I
l
, _ _ _ _ _ - - _ -.. - - - _ _ - - - _ - _ -.l