Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000416/1990009 + (ML20043H040)
- ML20043H041 + (ML20043H041)
- ML20043H042 + (ML20043H042)
- ML20043H043 + (ML20043H043)
- ML20043H044 + (ML20043H044)
- JAFP-90-0455, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-02.Corrective Actions:Refuel Floor Work Stopped, Chief Radiation Protection Technician Disciplined & Importance of Following Procedural Guidelines Reinforced + (ML20043H045)
- ML20043H046 + (ML20043H046)
- ML20043H047 + (ML20043H047)
- ML20043H050 + (ML20043H050)
- ML20043H051 + (ML20043H051)
- ML20043H054 + (ML20043H054)
- ML20043H056 + (ML20043H056)
- ML20043H058 + (ML20043H058)
- ML20043H059 + (ML20043H059)
- ML20043H060 + (ML20043H060)
- RBG-33065, Monthly Operating Rept for May 1990 for River Bend Station Unit 1 + (ML20043H061)
- BECO-90-075, Monthly Operating Rept for May 1990 for Pilgrim Nuclear Power Station + (ML20043H062)
- ML20043H064 + (ML20043H064)
- ML20043H065 + (ML20043H065)
- ML20043H066 + (ML20043H066)
- ML20043H067 + (ML20043H067)
- ML20043H069 + (ML20043H069)
- ML20043H071 + (ML20043H071)
- ML20043H074 + (ML20043H074)
- ML20043H075 + (ML20043H075)
- ML20043H076 + (ML20043H076)
- ML20043H078 + (ML20043H078)
- ML20043H079 + (ML20043H079)
- ML20043H080 + (ML20043H080)
- ML20043H081 + (ML20043H081)
- ML20043H082 + (ML20043H082)
- ML20043H084 + (ML20043H084)
- JPN-90-045, Forwards Reload 9/Cycle 10 Core Operating Limits Rept + (ML20043H085)
- ML20043H088 + (ML20043H088)
- ML20043H089 + (ML20043H089)
- ML20043H090 + (ML20043H090)
- ML20043H091 + (ML20043H091)
- PNO-II-90-025A, on 900610,regional Administrator Granted Util Approval to Restart Plant (Update to PNO-II-90-025).Exam Failures Prompted Both Units to Shut Down on 900520.Approval Came After Two Out of Three Crews Successfully Passed Exams + (ML20043H101)
- B13511, Forwards WCAP-12532, Review of Upper Shelf Charpy Energy Behavior of Matls in Haddam Neck Reactor Vessel. Rept Reviews Status of Core Region Matls Re Upper Shelf Fracture Toughness Issue,Per 10CFR50,App G + (ML20043H102)
- ML20043H104 + (ML20043H104)
- ML20043H105 + (ML20043H105)
- ML20043H106 + (ML20043H106)
- ML20043H107 + (ML20043H107)
- ML20043H109 + (ML20043H109)
- ML20043H111 + (ML20043H111)
- ML20043H113 + (ML20043H113)
- IR 05000348/1990002 + (ML20043H116)
- ML20043H121 + (ML20043H121)
- PNO-II-90-031, on 900607,unit Shut Down from 100% Power Due to Inoperable Nuclear Svc Water Pump.Caused by High Vibration on Pump Motor Casing.Efforts to Replace Pump Motor within Required 72 Hrs Unsuccessful + (ML20043H123)
- ML20043H124 + (ML20043H124)
- ML20043H127 + (ML20043H127)